ML19031C372
ML19031C372 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 08/07/1978 |
From: | Schneider F Public Service Electric & Gas Co |
To: | Grier B NRC/IE, NRC Region 1 |
References | |
IEB-78-008 | |
Download: ML19031C372 (2) | |
Similar Documents at Salem | |
---|---|
Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024
[Table view]Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-25 Category:Response to Request for Additional Information (RAI) MONTHYEARLR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024
[Table view]Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments LR-N21-0024, Response to Request for Additional Information for Proposed Alternative for Examination of ASME Section XI, Examination Category 8-8, Item Number 82.11 and 82.122021-04-12012 April 2021 Response to Request for Additional Information for Proposed Alternative for Examination of ASME Section XI, Examination Category 8-8, Item Number 82.11 and 82.12 LR-N21-0031, Response to Request for Additional Information, Revise and Relocate Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report2021-04-0101 April 2021 Response to Request for Additional Information, Revise and Relocate Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report LR-N21-0019, Response to Request for Additional Information (Rai), Steam Generator Tube Inspection Report (ML20261 H589)2021-02-25025 February 2021 Response to Request for Additional Information (Rai), Steam Generator Tube Inspection Report (ML20261 H589) LR-N20-0058, Response to Request for Additional Information License Amendment Request Re Application of Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection and Pressurizer Surge Lines2020-09-16016 September 2020 Response to Request for Additional Information License Amendment Request Re Application of Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection and Pressurizer Surge Lines ML19308A5952019-11-0404 November 2019 Response to Request for Additional Information, License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements ML19280A0002019-10-0303 October 2019 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) LR-N19-0066, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.2019-06-11011 June 2019 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. LR-N18-0116, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-30030 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0112, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-20020 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0108, Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension2018-10-18018 October 2018 Response to Request for Additional Information, License Amendment Request: Inverter Allowed Outage Time (AOT) Extension LR-N18-0070, Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ..2018-07-17017 July 2018 Response to Request for Additional Information (Rai), Implementation of WCAP-14333 and WCAP~15376 Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation System Instrumentation Test Times and ... RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) LR-N17-0140, Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications (CACs MF8859 and MF8860)2017-10-18018 October 2017 Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications (CACs MF8859 and MF8860) LR-N17-0263, Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment Request2017-09-14014 September 2017 Response to Request for Additional Information, Salem Units 1 and 2 - Containment Fan Coil Unit Allowed Outage Time Extension Amendment Request LR-N17-0125, Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2017-08-11011 August 2017 Response to Request for Additional Information Regarding Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors LR-N17-0115, Response to RAI Re Steam Generator Tube Inspection Report2017-08-0707 August 2017 Response to RAI Re Steam Generator Tube Inspection Report LR-N17-0118, Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications2017-08-0707 August 2017 Response to Request for Additional Information (Rai), Accident Monitoring Instrumentation Technical Specifications LR-N17-0102, Response to Request for Additional Information Regarding Relief Request SC-14R-171, Use of Code Cases N-695-1 and N-696-12017-06-0505 June 2017 Response to Request for Additional Information Regarding Relief Request SC-14R-171, Use of Code Cases N-695-1 and N-696-1 LR-N17-0091, Supplemental Information Needed for Acceptance of Requested Licensing Action Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension2017-05-0404 May 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Containment Fan Cooler Unit (Cfcu) Allowed Outage Time (AOT) Extension LR-N17-0079, Supplemental Information for Response to Request for Additional Information, Aging Management Program Plan for Reactor Vessel Internals2017-05-0303 May 2017 Supplemental Information for Response to Request for Additional Information, Aging Management Program Plan for Reactor Vessel Internals LR-N17-0001, Supplemental Information for Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals2017-01-13013 January 2017 Supplemental Information for Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals LR-N16-0226, Response to Request for Additional Information, Regarding Removing Certain Training Requirements2016-12-19019 December 2016 Response to Request for Additional Information, Regarding Removing Certain Training Requirements LR-N16-0094, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-12-0606 December 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML16305A2412016-10-31031 October 2016 Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. LR-N16-0127, Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals2016-10-0505 October 2016 Response to Request for Additional Information, RAI-8- RAI-11, Aging Management Program Plan for Reactor Vessel Internals LR-N16-0159, Response to Request for Additional Information Regarding Chilled Water System Modifications2016-08-30030 August 2016 Response to Request for Additional Information Regarding Chilled Water System Modifications LR-N16-0153, Response to Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-0012016-08-18018 August 2016 Response to Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-001 LR-N16-0134, Response to Request for Additional Information Regarding Chilled Water System Modifications2016-08-12012 August 2016 Response to Request for Additional Information Regarding Chilled Water System Modifications LR-N16-0130, Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations2016-08-0202 August 2016 Response to RIS 2016-09, Preparation and Scheduling of Operator Licensing Examinations LR-N16-0109, and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 172016-06-15015 June 2016 and Hope Creek Generating Stations - Cover Letter for Response to Request for Additional Information Regarding Review of Security Plan, Revision 17 LR-N16-0055, Response to Request for Additional Information Regarding Chilled Water System Modifications2016-03-31031 March 2016 Response to Request for Additional Information Regarding Chilled Water System Modifications ML16083A1942016-03-23023 March 2016 Transmittal of Response to Request for Additional Information, RAI-4, Aging Management Program Plan for Reactor Vessel Internals LR-N16-0012, Supplemental Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems2016-02-10010 February 2016 Supplemental Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems LR-N15-0239, Compliance with March 12, 2012 NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Responses to Requests for Additional Information2016-01-25025 January 2016 Compliance with March 12, 2012 NRC Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Responses to Requests for Additional Information LR-N15-0255, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi..2015-12-23023 December 2015 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.. LR-N15-0235, Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (CAC Nos. MF6065 and MF6066)2015-11-27027 November 2015 Response to Request for Additional Information License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems (CAC Nos. MF6065 and MF6066) LR-N15-0224, Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling)2015-11-25025 November 2015 Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) ML19031A6581997-03-30030 March 1997 03/30/1997 Letter Response to Request for Evaluation Re Refueling Accident Inside Containment ML19031A5031979-03-23023 March 1979 Generation Station, Unit 2 - Responses to Requests for Additional Information. Provides 60 Copies of Additional Seismic Qualification Information as Identified During 02/26-28/1979 Meeting ML19031A3811979-01-18018 January 1979 Response to Request for Additional Information on Quality Assurance & Subcompartment Analysis, Which Will Be Incorporated Into Fasr in Amendment to Application ML19030A6551978-08-22022 August 1978 08/22/1978 Response to Request for Additional Information Increased Capacity Spent Fuel Racks ML19031C3721978-08-0707 August 1978 08/07/1978 Letter Response to IE Bulletin No. 78-08 on Radiation Levels from Fuel Element Transfer Tubes ML19030A6651978-08-0202 August 1978 08/02/1978 Response to Request for Additional Information Diesel Generators 2024-04-26 |
Text
..... .-, ,11(1 Frederick W. Schneider Public Service Electric and Gas Company 80 Park Place Newark. N .J. 07101 201/622-7000 Vice President Production August 7, 1978 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Grier:
NRC IE BULLETIN NO. 78-08 RADIATION LEVELS FROM FUEL ELEMENT TRANSFER TUBES NO. 1 UNIT SALEM NUCLEAR GENERATING STATION In reply to IE Bulletin 78-08 dated June 12, 1978 and received on June 15, 1978, we offer the following response:
The fuel transfer tube shield design has been reviewed and an inspection of this shielding was made to assure that it has been installed as designed. The review and inspection has shown that the shield design in this area is sufficient to reduce area dose rates to acceptable levels outside the shielding and that the shielding was installed as designed. A possible radiation streaming problem that exists due to some pipe sleeves being imbedded in one of the compartment shield walls will be given additional study and if necessary, shielding will be provided to reduce the streaming to acceptable area radiation levels. At present, administrative controls are used to prevent access to the area affected by the streaming and streaming dose rates* are transient in nature.
The fuel transfer tube compartment is completely enclosed by concrete, lead and steel shielding. Access to the compartment can only be gained by removing the lead-steel hatch cover located on elevation 100 in the annular area between the crane wall and the containment wall. This hatch is normally left closed and is only removed when the transfer tube or seismic relief bellows require inspection. Special equipment is required to remove* the hatch cover. In addition,. the hatch will be marked "fuel transfer tube access hatch - do not remove during refueling" and the lead shielding associated with the transfer tube compartment will be similarly marked. The design and marking assures adequate control of access to the transfer tube compartment.
Mr. Boyce H.
Grier
- 8/7/78 During the first refueling, it is planned to perform a detailed radiation survey of the fuel transfer tube area to assure that radiation levels are within the expected design limits for that area.
Should additional information be desired, we will be pleased to further discuss it with you.