Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24011A152 | 10 January 2024 | March 2024 Emergency Preparedness Exercise Inspection-Request for Information | Siren |
ML23110A264 | 20 April 2023 | Request for Information License Renewal Phase 2 Inspection | Aging Management License Renewal |
ML22343A180 | 8 December 2022 | February 2023 Emergency Preparedness Program Inspection - Request for Information | |
ML22301A143 | 28 October 2022 | NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 | |
ML22242A108 | 30 August 2022 | Information Request, Information Request, Security IR 2022404 | |
ML22235A105 | 22 August 2022 | August 2022 Emergency Preparedness Exercise Inspection Request for Information | Coronavirus |
ML22145A446 | 6 June 2022 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 | Cyber Security |
ML22144A034 | 18 May 2022 | NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 | Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report |
ML22041A457 | 10 February 2022 | Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information | Commercial Grade Dedication Probabilistic Risk Assessment Temporary Modification Job Performance Measure Surveillance Frequency Control Program Large early release frequency |
ML21277A357 | 12 October 2021 | CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information | |
ML21216A050 | 3 August 2021 | NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 | |
ML21209A979 | 28 July 2021 | NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 | |
ML21120A118 | 30 April 2021 | NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 | Annual Radiological Environmental Operating Report |
ML21068A284 | 4 March 2021 | 2021002 Inservice Inspection (ISI) Request for Information (RFI) | Nondestructive Examination Scaffolding |
ML20336A185 | 30 November 2020 | NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 | Exemption Request Pandemic Coronavirus |
ML20325A040 | 19 November 2020 | NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 | Exemption Request Pandemic Coronavirus |
ML20267A516 | 23 September 2020 | NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 | Finite Element Analysis |
ML20245E282 | 31 August 2020 | NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time | |
ML20239A970 | 26 August 2020 | NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time | |
ML20149K436 | 26 May 2020 | NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 | Pandemic Coronavirus |
ML20112F457 | 21 April 2020 | NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 | Anticipated operational occurrence |
ML20034E608 | 3 February 2020 | NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 | Surveillance Frequency Control Program |
ML20028E151 | 27 January 2020 | Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information | |
ML19267A184 | 24 September 2019 | Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station | Open Phase Condition |
ML19232A228 | 20 August 2019 | NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, | |
ML19183A475 | 2 July 2019 | NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 | Safe Shutdown Ultimate heat sink Emergency Lighting Fire Protection Program |
ML18088A015 | 29 March 2018 | Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for | High winds FLEX Spent Fuel Pool Instrumentation |
ML17341B027 | 7 December 2017 | NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da | High winds Internal Flooding |
ML17292A057 | 18 October 2017 | NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 | |
ML17249A688 | 6 September 2017 | NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 | VT-2 |
ML17205A315 | 20 July 2017 | Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information | |
ML17193A219 | 12 July 2017 | NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs | |
ML17144A170 | 24 May 2017 | NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 | |
ML17047A749 | 16 February 2017 | Response to Request for Additional Information, Columbia Mur LAR Evib Rais | |
ML17006A092 | 4 January 2017 | NRR E-mail Capture - Eicb RAIs for Columbia Mur | |
ML17006A090 | 4 January 2017 | NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate | Anticipated operational occurrence |
ML16356A138 | 21 December 2016 | NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate | |
ML16342C432 | 7 December 2016 | NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 | |
ML16327A184 | 22 November 2016 | NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate | Anticipated operational occurrence |
ML16323A119 | 16 November 2016 | NRR E-mail Capture - Eicb RAIs for Columbia Mur | |
ML16218A390 | 8 August 2016 | Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) | |
ML16194A370 | 11 July 2016 | Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information | Ultimate heat sink |
ML16069A359 | 9 March 2016 | NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 | |
ML16061A554 | 1 March 2016 | Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information | Probabilistic Risk Assessment Temporary Modification |
ML16061A566 | 1 March 2016 | Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information | Commercial Grade Dedication |
ML15254A257 | 16 September 2015 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Reevaluations | Fukushima Dai-Ichi Earthquake |
ML15215A043 | 18 August 2015 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations | Fukushima Dai-Ichi Earthquake |
ML14262A341 | 24 September 2014 | Request for Additional Information, Round 2, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High | Scram Discharge Volume |
ML14192B031 | 13 August 2014 | Redacted, Request for Additional Information, Nrr/Dss/Scvb, Request to Modify Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows | |
ML14206A011 | 31 July 2014 | Request for Additional Information, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High | Scram Discharge Volume |