PNO-IV-99-043, on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects Observed | 18 October 1999 | PNO-IV-99-043:on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects Observed | Earthquake |
PNO-IV-99-018, on 990305,declared SONGS Units 2 & 3 Alert Because Potential Bomb Threat Occurred.Device Was 12-inch long,2-inch Diameter Copper Pipe,With Both Ends Capped. Licensee Notified State & Local Officials | 5 March 1999 | PNO-IV-99-018:on 990305,declared SONGS Units 2 & 3 Alert Because Potential Bomb Threat Occurred.Device Was 12-inch long,2-inch Diameter Copper Pipe,With Both Ends Capped. Licensee Notified State & Local Officials | |
PNO-IV-98-041, on 980918,control Room Operators Observed Alarm on One Channel of Main Condenser Steam Jet Air Ejector Radiation Monitoring Equipment,Which Indicated That Activity of Condenser Exhaust Had Increased by About Two Decades | 18 September 1998 | PNO-IV-98-041:on 980918,control Room Operators Observed Alarm on One Channel of Main Condenser Steam Jet Air Ejector Radiation Monitoring Equipment,Which Indicated That Activity of Condenser Exhaust Had Increased by About Two Decades | |
PNO-IV-97-038, on 970629,Unit 2 Entered Mode 3 & Mode 4 in Preparation for Draining to Midloop.Two Charging Lines to RCS Did Not Have Balanced Flow.Same Valve Was Found to Be Partially Stuck Closed in Units 2 & 3.Plant Shutdowned | 30 June 1997 | PNO-IV-97-038:on 970629,Unit 2 Entered Mode 3 & Mode 4 in Preparation for Draining to Midloop.Two Charging Lines to RCS Did Not Have Balanced Flow.Same Valve Was Found to Be Partially Stuck Closed in Units 2 & 3.Plant Shutdowned | |
PNO-V-93-020, on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts | 18 November 1993 | PNO-V-93-020:on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts | |
PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled | 22 September 1993 | PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled | |
PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power | 30 August 1993 | PNO-V-93-016:on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power | |
PNO-V-93-014, on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee | 11 August 1993 | PNO-V-93-014:on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee | |
PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined | 25 March 1993 | PNO-V-93-009D:on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined | |
PNO-V-92-010, on 920331,plant Reactor Trip Breaker Failed to Open During Routine Surveillance Test.Licensee Has Unsuccessfully Attempted to Reproduce Failure,In Breaker Cubicle & on Test Stand in Electrical Shop | 2 April 1992 | PNO-V-92-010:on 920331,plant Reactor Trip Breaker Failed to Open During Routine Surveillance Test.Licensee Has Unsuccessfully Attempted to Reproduce Failure,In Breaker Cubicle & on Test Stand in Electrical Shop | |
PNO-V-91-016, on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter | 9 August 1991 | PNO-V-91-016:on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter | |
PNO-V-91-014, on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg | 16 July 1991 | PNO-V-91-014:on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg | |
PNO-V-90-047B, updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys | 23 November 1990 | PNO-V-90-047B:updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys | |
PNO-V-90-047A, on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys | 21 November 1990 | PNO-V-90-047A:on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys | |
PNO-V-90-047, on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel | 20 November 1990 | PNO-V-90-047:on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel | |
PNO-V-90-036, on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned | 10 September 1990 | PNO-V-90-036:on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned | |
PNO-V-90-035, on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected | 6 August 1990 | PNO-V-90-035:on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected | |
PNO-V-90-034, on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed | 30 July 1990 | PNO-V-90-034:on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed | |
PNO-V-90-001, on 891230,while at 12% Reactor Power W/Main Generator Sypplying Power to Grid Plants Unit 3 Phase a Main Transformer Experienced Internal Fault,Which Caused Immediate Trip of Main Generator Output Breakers | 2 January 1990 | PNO-V-90-001:on 891230,while at 12% Reactor Power W/Main Generator Sypplying Power to Grid Plants Unit 3 Phase a Main Transformer Experienced Internal Fault,Which Caused Immediate Trip of Main Generator Output Breakers | |
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | 21 September 1989 | PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | |
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | 21 September 1989 | PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | |
ML20247N007 | 11 September 1989 | PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom | |
PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | 8 August 1989 | PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage | Earthquake |
PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred | 5 July 1989 | PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred | Earthquake |
PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred | 3 April 1989 | PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred | Earthquake |
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants | 23 March 1989 | PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants | |
PNO-V-89-017, on 890315,Palo Verde Unit 2 Initiated Voluntary Shutdown Due to Failures of Adv to Operate at Units 1 & 3.Unit 2 Will Remains in Mode 3 Until Advs Are Demonstrated to Be Operable | 16 March 1989 | PNO-V-89-017:on 890315,Palo Verde Unit 2 Initiated Voluntary Shutdown Due to Failures of Adv to Operate at Units 1 & 3.Unit 2 Will Remains in Mode 3 Until Advs Are Demonstrated to Be Operable | |
PNO-V-89-007, on 890303,main Generator Tripped Followed by Reactor Power Cutback Due to Main Generator Trip & Reactor Trip on Low Steam Generator 2 Pressure.Increase in One Containment Sump Level Was Noted | 3 March 1989 | PNO-V-89-007:on 890303,main Generator Tripped Followed by Reactor Power Cutback Due to Main Generator Trip & Reactor Trip on Low Steam Generator 2 Pressure.Increase in One Containment Sump Level Was Noted | Safe Shutdown |
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | 9 November 1988 | PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process | |
PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley | 27 June 1988 | PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley | Earthquake |
PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities | 13 June 1988 | PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities | Earthquake |
PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends | 9 May 1988 | PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends | |
PNO-V-88-014, on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored | 22 February 1988 | PNO-V-88-014:on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored | |
PNO-V-88-015, on 880221,safety Injection & Containment Isolation Actuation Signals Received Due to Low Pressurizer Pressure Signal.Caused by Incorrect Bypass of Pressurizer Low Pressure Protection When Unit Entered Mode 5 | 22 February 1988 | PNO-V-88-015:on 880221,safety Injection & Containment Isolation Actuation Signals Received Due to Low Pressurizer Pressure Signal.Caused by Incorrect Bypass of Pressurizer Low Pressure Protection When Unit Entered Mode 5 | |
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | 16 February 1988 | PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | |
PNO-V-88-012, on 880211,moderate Earthquake,Measuring 4.7 on Richter Scale,Hit Whittier,Ca Area.No Seismic Alarms Activated at Plant.No Damage Identified at Site | 11 February 1988 | PNO-V-88-012:on 880211,moderate Earthquake,Measuring 4.7 on Richter Scale,Hit Whittier,Ca Area.No Seismic Alarms Activated at Plant.No Damage Identified at Site | Earthquake |
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | 2 February 1988 | PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | |
PNO-V-88-002, on 880116,reactor Shutdown Commenced for More than 48 H Due to Alarms on Main Generator Hydrogen Detraining Unit.Caused by Hydrogen Leak Into Stator Cooling Water Sys in Main Generator.Visual & Sonic Insps Performed | 19 January 1988 | PNO-V-88-002:on 880116,reactor Shutdown Commenced for More than 48 H Due to Alarms on Main Generator Hydrogen Detraining Unit.Caused by Hydrogen Leak Into Stator Cooling Water Sys in Main Generator.Visual & Sonic Insps Performed | |
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | 4 January 1988 | PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | |
ML20234D183 | 28 December 1987 | PNS-V-87-009A:on 871209,Region V Reported Licensee Investigating Rept of Card Playing in Security Alarm Station.Disiplinary Action:Three Supervisors Terminated & Nine Security Officers Suspended | |
ML20237A131 | 9 December 1987 | PNS-V-87-009:on 871208,NRC Notified That Nine Security Officers & Two Supervisors Under Investigation for Alleged Card Playing While on Duty in Central Alarm Room.Licensee Believes Activity Caused No Degradation in Security Sys | |
PNO-V-87-077, on 871125,facility Issued Full Power License. Unit Currently Operating in Mode 2 at Approx 3% Reactor Power.Licensee Plans to Commence Power Ascension Testing Following Entry Into Mode 1 | 25 November 1987 | PNO-V-87-077:on 871125,facility Issued Full Power License. Unit Currently Operating in Mode 2 at Approx 3% Reactor Power.Licensee Plans to Commence Power Ascension Testing Following Entry Into Mode 1 | |
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | 24 November 1987 | PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted | Earthquake |
PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems | 3 November 1987 | PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems | |
PNO-V-87-072, on 871029 Severe Thunderstorm Struck Site, Knocking Out One Source of Offsite Power & 26 of 39 Emergency Sirens in Maricopa County.Unit 1 Fuel Bldg Door Damaged & Two Individuals Standing Nearby Injured | 30 October 1987 | PNO-V-87-072:on 871029 Severe Thunderstorm Struck Site, Knocking Out One Source of Offsite Power & 26 of 39 Emergency Sirens in Maricopa County.Unit 1 Fuel Bldg Door Damaged & Two Individuals Standing Nearby Injured | |
PNO-V-87-070, on 871025,reactor Brought Critical Following Dilution of Rcs.Actual Critical Boron Concentration 1,010 Ppm W/Group 5 Control Bank 60 Inches Withdrawn.Resident Inspector Witnessed Approach | 26 October 1987 | PNO-V-87-070:on 871025,reactor Brought Critical Following Dilution of Rcs.Actual Critical Boron Concentration 1,010 Ppm W/Group 5 Control Bank 60 Inches Withdrawn.Resident Inspector Witnessed Approach | |
PNO-V-87-069, on 871015,licensee Informed Resident Inspectors of Findings from Ultrasonic Exams of Reactor Coolant Pump Shafts as Result of Mfg Experiences in Europe Re Crack Indicators at End of Impeller Keyway | 15 October 1987 | PNO-V-87-069:on 871015,licensee Informed Resident Inspectors of Findings from Ultrasonic Exams of Reactor Coolant Pump Shafts as Result of Mfg Experiences in Europe Re Crack Indicators at End of Impeller Keyway | |
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations | 13 October 1987 | PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations | |
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | 9 October 1987 | PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | |
PNO-V-87-067, on 871007,licensee Reported That Recently Completed Single Failure Analyses Had Identified Potential Single Failures Which Had Not Previously Been Known.Lists Potential Single Failures Associated W/Esfs | 8 October 1987 | PNO-V-87-067:on 871007,licensee Reported That Recently Completed Single Failure Analyses Had Identified Potential Single Failures Which Had Not Previously Been Known.Lists Potential Single Failures Associated W/Esfs | Unanalyzed Condition |