PNO-IV-99-043, on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects Observed18 October 1999PNO-IV-99-043:on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects ObservedEarthquake
PNO-IV-99-018, on 990305,declared SONGS Units 2 & 3 Alert Because Potential Bomb Threat Occurred.Device Was 12-inch long,2-inch Diameter Copper Pipe,With Both Ends Capped. Licensee Notified State & Local Officials5 March 1999PNO-IV-99-018:on 990305,declared SONGS Units 2 & 3 Alert Because Potential Bomb Threat Occurred.Device Was 12-inch long,2-inch Diameter Copper Pipe,With Both Ends Capped. Licensee Notified State & Local Officials
PNO-IV-98-041, on 980918,control Room Operators Observed Alarm on One Channel of Main Condenser Steam Jet Air Ejector Radiation Monitoring Equipment,Which Indicated That Activity of Condenser Exhaust Had Increased by About Two Decades18 September 1998PNO-IV-98-041:on 980918,control Room Operators Observed Alarm on One Channel of Main Condenser Steam Jet Air Ejector Radiation Monitoring Equipment,Which Indicated That Activity of Condenser Exhaust Had Increased by About Two Decades
PNO-IV-97-038, on 970629,Unit 2 Entered Mode 3 & Mode 4 in Preparation for Draining to Midloop.Two Charging Lines to RCS Did Not Have Balanced Flow.Same Valve Was Found to Be Partially Stuck Closed in Units 2 & 3.Plant Shutdowned30 June 1997PNO-IV-97-038:on 970629,Unit 2 Entered Mode 3 & Mode 4 in Preparation for Draining to Midloop.Two Charging Lines to RCS Did Not Have Balanced Flow.Same Valve Was Found to Be Partially Stuck Closed in Units 2 & 3.Plant Shutdowned
PNO-V-93-020, on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts18 November 1993PNO-V-93-020:on 931118,eddy Current Insp of Tubes Identified Potential Loose Parts in Four Locations in SG 88 & Three Locations in SG 89.Licensee Evaluating Source of Loose Parts
PNO-V-93-017, on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled22 September 1993PNO-V-93-017:on 930922,util Informed NRC That re-review of Eddy Current Test Data Identified Midspan Indications in Two Tubes in Unit 3 SG31.Review Being Performed to Determine If Nonquantifiable Indications Exist.Telcon W/Nrc Scheduled
PNO-V-93-016, on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power30 August 1993PNO-V-93-016:on 930828,plant Restarted After Refueling Outage That Proceeded Tube Rupture Event on 930314.Cause of Tube Rupture Was Due to Intergranular Attack.Unit 3 Operating at 100% Power
PNO-V-93-014, on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee11 August 1993PNO-V-93-014:on 930811,NRC Was Informed That APS Supervisor Declined to Hire Contract Employee Because Employee Raised Safety Concerns at Plant & Elsewhere.Judge Ruled APS Discriminated Against Employee
PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined25 March 1993PNO-V-93-009D:on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined
PNO-V-92-010, on 920331,plant Reactor Trip Breaker Failed to Open During Routine Surveillance Test.Licensee Has Unsuccessfully Attempted to Reproduce Failure,In Breaker Cubicle & on Test Stand in Electrical Shop2 April 1992PNO-V-92-010:on 920331,plant Reactor Trip Breaker Failed to Open During Routine Surveillance Test.Licensee Has Unsuccessfully Attempted to Reproduce Failure,In Breaker Cubicle & on Test Stand in Electrical Shop
PNO-V-91-016, on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter9 August 1991PNO-V-91-016:on 910808,transmitter on Volume Control Tank Failed.Level Transmitter Repaired.Licensee Conducting Confirmatory Testing of Transmitter
PNO-V-91-014, on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg16 July 1991PNO-V-91-014:on 910715,licensee Inadvertently Drained 7,000 Gallons of Water from Spent Fuel Pool.Caused by Procedural Weakness.Health Physics Personnel Surveyed Area & Found Min Activity.Util Currently Removing Water from Radwaste Bldg
PNO-V-90-047B, updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys23 November 1990PNO-V-90-047B:updates 901120 Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys
PNO-V-90-047A, on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys21 November 1990PNO-V-90-047A:on 901120,updates Occurrence of Inadvertent Actuation of Safety Injection & Containment Spray Sys
PNO-V-90-047, on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel20 November 1990PNO-V-90-047:on 901120,actuation Signal Initiated by Plant Protection Sys While Testing PPS Channel
PNO-V-90-036, on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned10 September 1990PNO-V-90-036:on 900910,small Amount of Contamination Found on Injured Worker Clothing During Transport to Hosp. Contaminated Clothing Removed Enroute to Hosp & Injuries to Worker Considered Minor.No Press Release Planned
PNO-V-90-035, on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected6 August 1990PNO-V-90-035:on 900804,fire Discovered in Noncontaminated Laundry Room in Units 2 & 3 Shared Radwaste Bldg.Caused by Overheated Clothing Dryer.No Radiological Release Resulted from Fire & No safety-related Equipment Affected
PNO-V-90-034, on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed30 July 1990PNO-V-90-034:on 900728,unit 2 Was Shutdown to Inspect & Repair SG Feedrings,As Result of Degradation Found During Insp of Unit 3 SG Feedrings & Other Listed Work Was Performed
PNO-V-90-001, on 891230,while at 12% Reactor Power W/Main Generator Sypplying Power to Grid Plants Unit 3 Phase a Main Transformer Experienced Internal Fault,Which Caused Immediate Trip of Main Generator Output Breakers2 January 1990PNO-V-90-001:on 891230,while at 12% Reactor Power W/Main Generator Sypplying Power to Grid Plants Unit 3 Phase a Main Transformer Experienced Internal Fault,Which Caused Immediate Trip of Main Generator Output Breakers
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies21 September 1989PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing21 September 1989PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing
ML20247N00711 September 1989PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom
PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage8 August 1989PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No DamageEarthquake
PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred5 July 1989PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage OccurredEarthquake
PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred3 April 1989PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release OccurredEarthquake
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants23 March 1989PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants
PNO-V-89-017, on 890315,Palo Verde Unit 2 Initiated Voluntary Shutdown Due to Failures of Adv to Operate at Units 1 & 3.Unit 2 Will Remains in Mode 3 Until Advs Are Demonstrated to Be Operable16 March 1989PNO-V-89-017:on 890315,Palo Verde Unit 2 Initiated Voluntary Shutdown Due to Failures of Adv to Operate at Units 1 & 3.Unit 2 Will Remains in Mode 3 Until Advs Are Demonstrated to Be Operable
PNO-V-89-007, on 890303,main Generator Tripped Followed by Reactor Power Cutback Due to Main Generator Trip & Reactor Trip on Low Steam Generator 2 Pressure.Increase in One Containment Sump Level Was Noted3 March 1989PNO-V-89-007:on 890303,main Generator Tripped Followed by Reactor Power Cutback Due to Main Generator Trip & Reactor Trip on Low Steam Generator 2 Pressure.Increase in One Containment Sump Level Was NotedSafe Shutdown
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process9 November 1988PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process
PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley27 June 1988PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at BerkeleyEarthquake
PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities13 June 1988PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at FacilitiesEarthquake
PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends9 May 1988PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends
PNO-V-88-014, on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored22 February 1988PNO-V-88-014:on 880219,inadvertent Safety Injection Actuation Occurred While Testing of Actuation Logic Matrix Was in Progress & W/Unit at 100% Power.Unit Stabilized W/O Complication & Safety Injection Components Restored
PNO-V-88-015, on 880221,safety Injection & Containment Isolation Actuation Signals Received Due to Low Pressurizer Pressure Signal.Caused by Incorrect Bypass of Pressurizer Low Pressure Protection When Unit Entered Mode 522 February 1988PNO-V-88-015:on 880221,safety Injection & Containment Isolation Actuation Signals Received Due to Low Pressurizer Pressure Signal.Caused by Incorrect Bypass of Pressurizer Low Pressure Protection When Unit Entered Mode 5
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom16 February 1988PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom
PNO-V-88-012, on 880211,moderate Earthquake,Measuring 4.7 on Richter Scale,Hit Whittier,Ca Area.No Seismic Alarms Activated at Plant.No Damage Identified at Site11 February 1988PNO-V-88-012:on 880211,moderate Earthquake,Measuring 4.7 on Richter Scale,Hit Whittier,Ca Area.No Seismic Alarms Activated at Plant.No Damage Identified at SiteEarthquake
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named2 February 1988PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named
PNO-V-88-002, on 880116,reactor Shutdown Commenced for More than 48 H Due to Alarms on Main Generator Hydrogen Detraining Unit.Caused by Hydrogen Leak Into Stator Cooling Water Sys in Main Generator.Visual & Sonic Insps Performed19 January 1988PNO-V-88-002:on 880116,reactor Shutdown Commenced for More than 48 H Due to Alarms on Main Generator Hydrogen Detraining Unit.Caused by Hydrogen Leak Into Stator Cooling Water Sys in Main Generator.Visual & Sonic Insps Performed
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure4 January 1988PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure
ML20234D18328 December 1987PNS-V-87-009A:on 871209,Region V Reported Licensee Investigating Rept of Card Playing in Security Alarm Station.Disiplinary Action:Three Supervisors Terminated & Nine Security Officers Suspended
ML20237A1319 December 1987PNS-V-87-009:on 871208,NRC Notified That Nine Security Officers & Two Supervisors Under Investigation for Alleged Card Playing While on Duty in Central Alarm Room.Licensee Believes Activity Caused No Degradation in Security Sys
PNO-V-87-077, on 871125,facility Issued Full Power License. Unit Currently Operating in Mode 2 at Approx 3% Reactor Power.Licensee Plans to Commence Power Ascension Testing Following Entry Into Mode 125 November 1987PNO-V-87-077:on 871125,facility Issued Full Power License. Unit Currently Operating in Mode 2 at Approx 3% Reactor Power.Licensee Plans to Commence Power Ascension Testing Following Entry Into Mode 1
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted24 November 1987PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations NotedEarthquake
PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems3 November 1987PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems
PNO-V-87-072, on 871029 Severe Thunderstorm Struck Site, Knocking Out One Source of Offsite Power & 26 of 39 Emergency Sirens in Maricopa County.Unit 1 Fuel Bldg Door Damaged & Two Individuals Standing Nearby Injured30 October 1987PNO-V-87-072:on 871029 Severe Thunderstorm Struck Site, Knocking Out One Source of Offsite Power & 26 of 39 Emergency Sirens in Maricopa County.Unit 1 Fuel Bldg Door Damaged & Two Individuals Standing Nearby Injured
PNO-V-87-070, on 871025,reactor Brought Critical Following Dilution of Rcs.Actual Critical Boron Concentration 1,010 Ppm W/Group 5 Control Bank 60 Inches Withdrawn.Resident Inspector Witnessed Approach26 October 1987PNO-V-87-070:on 871025,reactor Brought Critical Following Dilution of Rcs.Actual Critical Boron Concentration 1,010 Ppm W/Group 5 Control Bank 60 Inches Withdrawn.Resident Inspector Witnessed Approach
PNO-V-87-069, on 871015,licensee Informed Resident Inspectors of Findings from Ultrasonic Exams of Reactor Coolant Pump Shafts as Result of Mfg Experiences in Europe Re Crack Indicators at End of Impeller Keyway15 October 1987PNO-V-87-069:on 871015,licensee Informed Resident Inspectors of Findings from Ultrasonic Exams of Reactor Coolant Pump Shafts as Result of Mfg Experiences in Europe Re Crack Indicators at End of Impeller Keyway
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations13 October 1987PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted9 October 1987PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted
PNO-V-87-067, on 871007,licensee Reported That Recently Completed Single Failure Analyses Had Identified Potential Single Failures Which Had Not Previously Been Known.Lists Potential Single Failures Associated W/Esfs8 October 1987PNO-V-87-067:on 871007,licensee Reported That Recently Completed Single Failure Analyses Had Identified Potential Single Failures Which Had Not Previously Been Known.Lists Potential Single Failures Associated W/EsfsUnanalyzed Condition