Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PNO-I-99-003, on 990114,NY Power Authority Declared Unusual Event at Plant Due to Fire at Onsite Hydrogen Storage Facility.No Attempt Made to Isolate Hydrogen Supply to Fire for Personnel Safety Reasons.Region I Responded to Event15 January 1999PNO-I-99-003:on 990114,NY Power Authority Declared Unusual Event at Plant Due to Fire at Onsite Hydrogen Storage Facility.No Attempt Made to Isolate Hydrogen Supply to Fire for Personnel Safety Reasons.Region I Responded to Event
PNO-I-98-035, on 980803:automatic Reactor Scram Occurred Due to Low Reactor Vessel Water Level.Licensee Elected to Enter Cold Shutdown to Complete Several Maint Items.Licensee Issued Press Release4 August 1998PNO-I-98-035:on 980803:automatic Reactor Scram Occurred Due to Low Reactor Vessel Water Level.Licensee Elected to Enter Cold Shutdown to Complete Several Maint Items.Licensee Issued Press ReleaseReactor Vessel Water Level
PNO-I-97-008, 970123,manual Reactor Scram Initiated at FitzPatrick Nuclear Plant,When Decreasing Lake Intake Water Level Indication Noted.All Rods Inserted & Sys Functioned as Required24 January 1997PNO-I-97-008:970123,manual Reactor Scram Initiated at FitzPatrick Nuclear Plant,When Decreasing Lake Intake Water Level Indication Noted.All Rods Inserted & Sys Functioned as Required
PNO-I-93-005, on 930123,plant Tied to Grid Officially Ending 13 Month Shutdown.Design Deficiency in Core Spray Sys Containment Isolation Logic Caused Plant Shutdown on 911127. Technical & Performance Issues Resolved on 92122925 January 1993PNO-I-93-005:on 930123,plant Tied to Grid Officially Ending 13 Month Shutdown.Design Deficiency in Core Spray Sys Containment Isolation Logic Caused Plant Shutdown on 911127. Technical & Performance Issues Resolved on 921229
PNO-I-90-090, on 901009,presumptive Positive Drug Test for on-shift Senior Reactor Operator Occurred.Operator Taken Off Shift & Denied Access to Protected Area for 14 Days9 October 1990PNO-I-90-090:on 901009,presumptive Positive Drug Test for on-shift Senior Reactor Operator Occurred.Operator Taken Off Shift & Denied Access to Protected Area for 14 Days
PNO-I-90-067, on 900821,reactor Shutdown to Resolve Calculational Concerns in Eops.Shut Down Voluntary Action by Util.Util Estimated That Initial Results of Revised Calculations Will Be Available by 90082322 August 1990PNO-I-90-067:on 900821,reactor Shutdown to Resolve Calculational Concerns in Eops.Shut Down Voluntary Action by Util.Util Estimated That Initial Results of Revised Calculations Will Be Available by 900823
ML20246G25110 July 1989PNS-I-89-011:on 890708,bomb Threat Received by Licensee. Caller Implied That Bomb in Reactor Building & Mentioned Name of Current Employee.Employee Was Suspended from Duties Pending Further Investigation,Then Reinstated on 890710
PNO-I-89-044, on 890612,two Workers Received Exposures of 570 & 280 Millirem W/Total Quarterly Doses of 1,240 & 960 Millirem,Respectively,While Working Around Refueling Pool. Caused by Hot Particle.Licensee Trying to Capture Source13 June 1989PNO-I-89-044:on 890612,two Workers Received Exposures of 570 & 280 Millirem W/Total Quarterly Doses of 1,240 & 960 Millirem,Respectively,While Working Around Refueling Pool. Caused by Hot Particle.Licensee Trying to Capture Source
PNO-I-88-122, on 881202,commencement of Reactor Shutdown to Support Main Turbine Generator Detuning Planned to Correct Resonant Frequency at Normal Operating Speed of Low Pressure Turbine Rotor.Rotor Will Be Detuned2 December 1988PNO-I-88-122:on 881202,commencement of Reactor Shutdown to Support Main Turbine Generator Detuning Planned to Correct Resonant Frequency at Normal Operating Speed of Low Pressure Turbine Rotor.Rotor Will Be Detuned
PNO-I-88-079, on 880729,senior Reactor Operator Tested Positive for Drug Use.Pending Results of Second Test, Individual Site Access Denied29 July 1988PNO-I-88-079:on 880729,senior Reactor Operator Tested Positive for Drug Use.Pending Results of Second Test, Individual Site Access Denied
PNO-I-87-085, on 870907,reactor Trip Occurred When Both 345 Kv Generator Output Breakers Tripped.Cause Undetermined. Troubleshooting & Analysis of Field Windings & Ground Detection Circuit Continuing.Trip Also Occurred on 87082811 September 1987PNO-I-87-085:on 870907,reactor Trip Occurred When Both 345 Kv Generator Output Breakers Tripped.Cause Undetermined. Troubleshooting & Analysis of Field Windings & Ground Detection Circuit Continuing.Trip Also Occurred on 870828
PNO-I-87-012, on 870213,NRC Notified of Apparent Hand Overexposure to Contract Worker.Worker Received 29.6 Rems to Fingers of Right Hand During Underwater Cutting of Dry Tubes.Cutting Operations Suspended Pending Investigation17 February 1987PNO-I-87-012:on 870213,NRC Notified of Apparent Hand Overexposure to Contract Worker.Worker Received 29.6 Rems to Fingers of Right Hand During Underwater Cutting of Dry Tubes.Cutting Operations Suspended Pending Investigation
ML20054E9008 June 1982PNS-I-82-04:on 820607,inadequate Search of Chem-Nuclear Tractor Trailer Admitted to Site Protected Area Failed to Identify Two Handguns Under Blanket in Cab Bunk Area.Guns Remanded to Sheriffs Dept & Driver Fined
PNO-I-80-095, on 800624,Home Transportation Co tractor- Trailer Carrying Low Level Radwaste from Oswego,Ny to Barnwell,Sc Developed Air Suspension Sys & Axle Trouble on Route 81 South of Syracuse,Ny24 June 1980PNO-I-80-095:on 800624,Home Transportation Co tractor- Trailer Carrying Low Level Radwaste from Oswego,Ny to Barnwell,Sc Developed Air Suspension Sys & Axle Trouble on Route 81 South of Syracuse,NyMission time
ML20249A1295 January 1978PNO-78-001:on 780104,licensee Experience Problems Placing Hydrogen Off-Gas Recombiner Sys in Operation Due to Occurrence of Sustained Hydrogen Combustion.Problem Previously Identified in GE Svc Ltr SIL 246
ML20249C81522 November 1976PNO-76-200:on 761122,Region I Was Informed That Inadvertent Operation of 1 of 11 Target Rock Safety/Relief Valves Occurred.Licensee Planning to Replace Failed Valve W/New Valve
ML20249C81219 November 1976PNO-76-197:on 761119,Region I Was Informed That Inadvertent Operation of Target Rock Safety Relief Valve Occurred. Licensee Preparing to Make Drywell & Torus Insp
ML20249B93815 October 1976PNO-76-170:on 761014,Region I Inspector Onsite Reported That During Surveillance,One of Four DG Unloaded & Tripped.Upon Investigation,Exhaust Manifold Fire Found & Visible from Diesel Bldg Exterior
ML20249B89410 September 1976PNO-76-153:on 760910,during Routine Surveillance Testing Control Rod 43-35 Was Found to Be Uncoupled from Drive Mechanism
ML20249B50618 June 1976PNO-76-104:on 760618,personnel in Reactor Bldg at Ja Fitzpatrick Facility Were Required to Leave Bldg Due to High Airborne Radioactivity Levels.Licensee Stated No Personnel Overexposure Occurred.State of Ny Informed
ML20249B23520 January 1976PNO-76-010:on 760109,licensee Was Informed by Stone & Webster That Major Portion of Plant Sf Storage Racks Do Not Meet Seismic Design Criteria,When Loaded W/Fuel.Plans for Fuel Movement Being Reviewed.State of New York Informed
ML20249B24119 January 1976PNO-76-008:on 760116,sharp Increases in Plant Air Ejector off-gas Radiation Monitor,Indicative of Fuel Cladding Failures,Combined W/Steam Leakage in Turbine Building Caused Isolation of Turbine Building.State of Ny InformedFuel cladding
ML20236U04519 March 1975PN-75-003:on 750318,plant Was Operating & Conducting Initial Reactor Power Testing Program D EDG Experienced Failure W/Resultant Internal Explosion