Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-99-003, on 990114,NY Power Authority Declared Unusual Event at Plant Due to Fire at Onsite Hydrogen Storage Facility.No Attempt Made to Isolate Hydrogen Supply to Fire for Personnel Safety Reasons.Region I Responded to Event1999-01-15015 January 1999 PNO-I-99-003:on 990114,NY Power Authority Declared Unusual Event at Plant Due to Fire at Onsite Hydrogen Storage Facility.No Attempt Made to Isolate Hydrogen Supply to Fire for Personnel Safety Reasons.Region I Responded to Event PNO-I-98-035, on 980803:automatic Reactor Scram Occurred Due to Low Reactor Vessel Water Level.Licensee Elected to Enter Cold Shutdown to Complete Several Maint Items.Licensee Issued Press Release1998-08-0404 August 1998 PNO-I-98-035:on 980803:automatic Reactor Scram Occurred Due to Low Reactor Vessel Water Level.Licensee Elected to Enter Cold Shutdown to Complete Several Maint Items.Licensee Issued Press Release PNO-I-97-008, 970123,manual Reactor Scram Initiated at FitzPatrick Nuclear Plant,When Decreasing Lake Intake Water Level Indication Noted.All Rods Inserted & Sys Functioned as Required1997-01-24024 January 1997 PNO-I-97-008:970123,manual Reactor Scram Initiated at FitzPatrick Nuclear Plant,When Decreasing Lake Intake Water Level Indication Noted.All Rods Inserted & Sys Functioned as Required PNO-I-93-005, on 930123,plant Tied to Grid Officially Ending 13 Month Shutdown.Design Deficiency in Core Spray Sys Containment Isolation Logic Caused Plant Shutdown on 911127. Technical & Performance Issues Resolved on 9212291993-01-25025 January 1993 PNO-I-93-005:on 930123,plant Tied to Grid Officially Ending 13 Month Shutdown.Design Deficiency in Core Spray Sys Containment Isolation Logic Caused Plant Shutdown on 911127. Technical & Performance Issues Resolved on 921229 PNO-I-90-090, on 901009,presumptive Positive Drug Test for on-shift Senior Reactor Operator Occurred.Operator Taken Off Shift & Denied Access to Protected Area for 14 Days1990-10-0909 October 1990 PNO-I-90-090:on 901009,presumptive Positive Drug Test for on-shift Senior Reactor Operator Occurred.Operator Taken Off Shift & Denied Access to Protected Area for 14 Days PNO-I-90-067, on 900821,reactor Shutdown to Resolve Calculational Concerns in Eops.Shut Down Voluntary Action by Util.Util Estimated That Initial Results of Revised Calculations Will Be Available by 9008231990-08-22022 August 1990 PNO-I-90-067:on 900821,reactor Shutdown to Resolve Calculational Concerns in Eops.Shut Down Voluntary Action by Util.Util Estimated That Initial Results of Revised Calculations Will Be Available by 900823 ML20246G2511989-07-10010 July 1989 PNS-I-89-011:on 890708,bomb Threat Received by Licensee. Caller Implied That Bomb in Reactor Building & Mentioned Name of Current Employee.Employee Was Suspended from Duties Pending Further Investigation,Then Reinstated on 890710 PNO-I-89-044, on 890612,two Workers Received Exposures of 570 & 280 Millirem W/Total Quarterly Doses of 1,240 & 960 Millirem,Respectively,While Working Around Refueling Pool. Caused by Hot Particle.Licensee Trying to Capture Source1989-06-13013 June 1989 PNO-I-89-044:on 890612,two Workers Received Exposures of 570 & 280 Millirem W/Total Quarterly Doses of 1,240 & 960 Millirem,Respectively,While Working Around Refueling Pool. Caused by Hot Particle.Licensee Trying to Capture Source PNO-I-88-122, on 881202,commencement of Reactor Shutdown to Support Main Turbine Generator Detuning Planned to Correct Resonant Frequency at Normal Operating Speed of Low Pressure Turbine Rotor.Rotor Will Be Detuned1988-12-0202 December 1988 PNO-I-88-122:on 881202,commencement of Reactor Shutdown to Support Main Turbine Generator Detuning Planned to Correct Resonant Frequency at Normal Operating Speed of Low Pressure Turbine Rotor.Rotor Will Be Detuned PNO-I-88-079, on 880729,senior Reactor Operator Tested Positive for Drug Use.Pending Results of Second Test, Individual Site Access Denied1988-07-29029 July 1988 PNO-I-88-079:on 880729,senior Reactor Operator Tested Positive for Drug Use.Pending Results of Second Test, Individual Site Access Denied PNO-I-87-085, on 870907,reactor Trip Occurred When Both 345 Kv Generator Output Breakers Tripped.Cause Undetermined. Troubleshooting & Analysis of Field Windings & Ground Detection Circuit Continuing.Trip Also Occurred on 8708281987-09-11011 September 1987 PNO-I-87-085:on 870907,reactor Trip Occurred When Both 345 Kv Generator Output Breakers Tripped.Cause Undetermined. Troubleshooting & Analysis of Field Windings & Ground Detection Circuit Continuing.Trip Also Occurred on 870828 PNO-I-87-012, on 870213,NRC Notified of Apparent Hand Overexposure to Contract Worker.Worker Received 29.6 Rems to Fingers of Right Hand During Underwater Cutting of Dry Tubes.Cutting Operations Suspended Pending Investigation1987-02-17017 February 1987 PNO-I-87-012:on 870213,NRC Notified of Apparent Hand Overexposure to Contract Worker.Worker Received 29.6 Rems to Fingers of Right Hand During Underwater Cutting of Dry Tubes.Cutting Operations Suspended Pending Investigation ML20054E9001982-06-0808 June 1982 PNS-I-82-04:on 820607,inadequate Search of Chem-Nuclear Tractor Trailer Admitted to Site Protected Area Failed to Identify Two Handguns Under Blanket in Cab Bunk Area.Guns Remanded to Sheriffs Dept & Driver Fined PNO-I-80-095, on 800624,Home Transportation Co tractor- Trailer Carrying Low Level Radwaste from Oswego,Ny to Barnwell,Sc Developed Air Suspension Sys & Axle Trouble on Route 81 South of Syracuse,Ny1980-06-24024 June 1980 PNO-I-80-095:on 800624,Home Transportation Co tractor- Trailer Carrying Low Level Radwaste from Oswego,Ny to Barnwell,Sc Developed Air Suspension Sys & Axle Trouble on Route 81 South of Syracuse,Ny ML20249A1291978-01-0505 January 1978 PNO-78-001:on 780104,licensee Experience Problems Placing Hydrogen Off-Gas Recombiner Sys in Operation Due to Occurrence of Sustained Hydrogen Combustion.Problem Previously Identified in GE Svc Ltr SIL 246 ML20249C8151976-11-22022 November 1976 PNO-76-200:on 761122,Region I Was Informed That Inadvertent Operation of 1 of 11 Target Rock Safety/Relief Valves Occurred.Licensee Planning to Replace Failed Valve W/New Valve ML20249C8121976-11-19019 November 1976 PNO-76-197:on 761119,Region I Was Informed That Inadvertent Operation of Target Rock Safety Relief Valve Occurred. Licensee Preparing to Make Drywell & Torus Insp ML20249B9381976-10-15015 October 1976 PNO-76-170:on 761014,Region I Inspector Onsite Reported That During Surveillance,One of Four DG Unloaded & Tripped.Upon Investigation,Exhaust Manifold Fire Found & Visible from Diesel Bldg Exterior ML20249B8941976-09-10010 September 1976 PNO-76-153:on 760910,during Routine Surveillance Testing Control Rod 43-35 Was Found to Be Uncoupled from Drive Mechanism ML20249B5061976-06-18018 June 1976 PNO-76-104:on 760618,personnel in Reactor Bldg at Ja Fitzpatrick Facility Were Required to Leave Bldg Due to High Airborne Radioactivity Levels.Licensee Stated No Personnel Overexposure Occurred.State of Ny Informed ML20249B2351976-01-20020 January 1976 PNO-76-010:on 760109,licensee Was Informed by Stone & Webster That Major Portion of Plant Sf Storage Racks Do Not Meet Seismic Design Criteria,When Loaded W/Fuel.Plans for Fuel Movement Being Reviewed.State of New York Informed ML20249B2411976-01-19019 January 1976 PNO-76-008:on 760116,sharp Increases in Plant Air Ejector off-gas Radiation Monitor,Indicative of Fuel Cladding Failures,Combined W/Steam Leakage in Turbine Building Caused Isolation of Turbine Building.State of Ny Informed ML20236U0451975-03-19019 March 1975 PN-75-003:on 750318,plant Was Operating & Conducting Initial Reactor Power Testing Program D EDG Experienced Failure W/Resultant Internal Explosion 1999-01-15
[Table view]Some use of "" in your query was not closed by a matching "". Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
Some use of "" in your query was not closed by a matching "".
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
DCS No: 50-333/820607 Dato: Juna 8, 1982 l PRELIMINARY NOTIFICATION OF SAFEGUARDS EVENT--PNS-I-82-04 l
lThis preliminary notification constitutes EARLY notice of events of POSSIBLE national security or public interest significance. The information is as initially received with-lout verification or evaluation, and is basically all that is known by the Region I staff on lthisdate.
Facility: Power Authority of the State of New York Licensee Emergency Classification:
James A. FitzPatrick Nuclear Power Statinn Notification of Unusual Event (DN50-333) Alert-Scriba, New York ,
Site Area Emergency General Emergency x Not Applicable r
Subject:
HANDGUNS UNDETECTED DURING VEHICLE SEARCH At 10:00 a.m., June 7,1982, the licensee notified Region I of a weapons search violation.
The licensee related that a Chem-Nuclear tractor trailer had been admitted to the site protected area at 7:57 a.m. , June 7,1982 and that an inadequate search had failed to identify the presence of two handguns (1 loaded .357 Magnum and 1 unloaded .22 pistol),
under a blanket in the bunk area of the cab. Leaving the trailer onsite to be loaded, the tractor then departed the site at 8:59 a.m. with the undetected handguns. The driver returned to the site to enter the protected area and pick up the loaded trailer at 9:40 a.m. On this second entry to the protected area, correct search procedures were exercised and the handguns were found. The driver confirmed that the handguns had been taien onsite
' earlier (7:57 a..u.) without having been detected. No vital areas were entered. The driver and handguns were remanded to the custody of the investigating Oswego County, New York Sheriff's Department. It was later reported by the licensee that the driver was fined $100.00 for a Class "A" New York State misdemeanor and released. The handguns remain in the custody of the New York Sheriff's Department. The licensee is investigating this event and will provide a 10 CFR 73.71 Safeguards Event Report to the NRC.
This Preliminary Notification is issued for information only. The State of New York will be notified. A press release was issued on June 7 by the licensee. No press release is planned by Region I at this time. The IAT was notified.
CONTACT: W. Madden A.Gody J.Jcyner 488-1268 488-1255 488-1251 DISTRIBUTION:
H. St. MNBB Phillips /ffd E/W Willste Mail: ADM:DMB Chairman Palladino EDO NRR IE NMSS DOT:Trans. Only Comm. Gilinsky PA OIA RES Comm. Ahearne MPA AE0D Comm. Roberts ELD ACRS Air Rights INP0 -
SECY SP NSAC CA PDR Regional Offices TMI Resident Section /;At RI Resident Offic y m A e2 f Licensee:
(Reactor Licensees)
Region I Form 83 (Rev. May, 1982) e20615co13 02060s
$_[-82-004 PDR N