Issue date | Title | Topic | |
---|---|---|---|
PNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph | 18 October 1999 | PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph | |
PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph | 15 September 1999 | PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph | |
PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph | 15 September 1999 | PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph | |
PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph | 15 September 1999 | PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph | |
PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph | 15 September 1999 | PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph | Siren |
PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph | 15 September 1999 | PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph | |
PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 | 31 August 1999 | PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 | Siren |
PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained | 30 August 1999 | PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained | Siren |
PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary | 24 November 1998 | PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary | |
PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens | 27 August 1998 | PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens | Siren |
PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility | 27 August 1998 | PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility | |
PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported | 26 August 1998 | PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported | |
PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area | 26 August 1998 | PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area | |
PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site | 25 August 1998 | PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site | |
PNO-II-98-016, on 980316,licensee Declared Alert Due to Fire in Dumpster Located Outside Fuels Mfg Operations Bldg. Extinguished Fire,Inspected Roof & Posted Hourly Fire Watch. Licensee Will Investigate Root Causes & CAs to Be Taken | 17 March 1998 | PNO-II-98-016:on 980316,licensee Declared Alert Due to Fire in Dumpster Located Outside Fuels Mfg Operations Bldg. Extinguished Fire,Inspected Roof & Posted Hourly Fire Watch. Licensee Will Investigate Root Causes & CAs to Be Taken | Hourly Fire Watch |
PNO-II-97-049, on 970904,stack Sample Above Licensee Action Was Noted.Sample Taken from H Fluoride Bldg Exhaust Stack.Environ Air Samples Collected at Site Boundary & Radioactivity Levels Determined to Be Background | 5 September 1997 | PNO-II-97-049:on 970904,stack Sample Above Licensee Action Was Noted.Sample Taken from H Fluoride Bldg Exhaust Stack.Environ Air Samples Collected at Site Boundary & Radioactivity Levels Determined to Be Background | |
PNO-II-97-044, on 970808,thirty-seven Salaried Positions Eliminated,Fifteen Positions Resulted from Voluntary Separation & twenty-two Involuntary Eliminations.Areas Affected Were Design,Engineering & Production Scheduling | 14 August 1997 | PNO-II-97-044:on 970808,thirty-seven Salaried Positions Eliminated,Fifteen Positions Resulted from Voluntary Separation & twenty-two Involuntary Eliminations.Areas Affected Were Design,Engineering & Production Scheduling | |
PNO-II-93-067, on 931130,util Announced That Indepth Independent Review Found No Evidence to Support Allegations That Util Discovered Cracks in Plant Core Shrouds in 1984, But Covered Up Existance of Cracks Until 1993 | 30 November 1993 | PNO-II-93-067:on 931130,util Announced That Indepth Independent Review Found No Evidence to Support Allegations That Util Discovered Cracks in Plant Core Shrouds in 1984, But Covered Up Existance of Cracks Until 1993 | |
PNO-II-93-060, on 931108,licensee Made NOUE When Potentially Contaminated Employee Transported to Dosher Memorial Hosp in Southport,Nc.Employee Partially Surveyed Due to Injuries. Employee Subsequently Determined Not to Be Contaminated | 8 November 1993 | PNO-II-93-060:on 931108,licensee Made NOUE When Potentially Contaminated Employee Transported to Dosher Memorial Hosp in Southport,Nc.Employee Partially Surveyed Due to Injuries. Employee Subsequently Determined Not to Be Contaminated | |
PNO-II-93-050, on 930928,media Issued Statement Re Core Shroud Cracks at Facility.Activity Delayed Current Refueling Outage Schedule.Licensee Developing Permanent Mechanical Repair.State of Nc Informed | 28 September 1993 | PNO-II-93-050:on 930928,media Issued Statement Re Core Shroud Cracks at Facility.Activity Delayed Current Refueling Outage Schedule.Licensee Developing Permanent Mechanical Repair.State of Nc Informed | |
PNO-II-93-042, on 930830,NRC Entered Monitoring Mode, Responding to Hurricane Emily,Located SE of Brunswick Plant. Inspectors Observing Licensee Preparations.Region II Informed States of Nc & VA of Activity | 30 August 1993 | PNO-II-93-042:on 930830,NRC Entered Monitoring Mode, Responding to Hurricane Emily,Located SE of Brunswick Plant. Inspectors Observing Licensee Preparations.Region II Informed States of Nc & VA of Activity | |
PNO-II-92-007, on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys | 5 February 1992 | PNO-II-92-007:on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys | Half scram |
PNO-II-91-044, on 910709,licensee Inadvertently Transferred Approx 400 Gallons of Liquid Containing Small Amounts of U from Favorable Geometry Tank (T-417) to Unfavorable Tank (V-103).State of Nc Notified | 10 July 1991 | PNO-II-91-044:on 910709,licensee Inadvertently Transferred Approx 400 Gallons of Liquid Containing Small Amounts of U from Favorable Geometry Tank (T-417) to Unfavorable Tank (V-103).State of Nc Notified | |
PNO-II-91-043, on 910707,NRC Authorized GE Co to Resume Normal Operation of Fluoride & Nitrate Waste Sys,Which Had Been Shut Down Subsequent to 910528 Event at Site | 8 July 1991 | PNO-II-91-043:on 910707,NRC Authorized GE Co to Resume Normal Operation of Fluoride & Nitrate Waste Sys,Which Had Been Shut Down Subsequent to 910528 Event at Site | |
ML20203C594 | 4 June 1991 | PNO-IIT-91-001:on 910603,team Toured Facility & Examined Equipment & Instrumentation Associated W/Event.Team in Early Stages of Conducting Interviews,Reviewing Procedures & Drawings & Analyzing Facts | |
PNO-II-90-047B, on 900825,AIT Conducted Meeting Which Was Followed by Press Conference to Discuss Excessive Cooldown Rate in Reactor Vessel Lower Portion Experienced During 900816 & 19 Reactor Trips & Other Listed Items | 30 August 1990 | PNO-II-90-047B:on 900825,AIT Conducted Meeting Which Was Followed by Press Conference to Discuss Excessive Cooldown Rate in Reactor Vessel Lower Portion Experienced During 900816 & 19 Reactor Trips & Other Listed Items | |
PNO-II-90-047A, provides as Update to 900821 Notification Re 900819 Reactor Trip,Findings of Investigation.Reactor Trip Due to Closure of MSIVs Resulted from Primary Containment Isolation Sys Testing.Util Correcting Safety Relief Valves | 24 August 1990 | PNO-II-90-047A:provides as Update to 900821 Notification Re 900819 Reactor Trip,Findings of Investigation.Reactor Trip Due to Closure of MSIVs Resulted from Primary Containment Isolation Sys Testing.Util Correcting Safety Relief Valves | |
PNO-II-90-044, on 900802,fire Noticed in Tube Polisher Located in Fuel Components Operation Bldg at Facility. Welding Spark Ignited Zirconium & Caused Fire.Fire Isolated to Single Piece of Equipment & Did Not Spread | 2 August 1990 | PNO-II-90-044 :on 900802,fire Noticed in Tube Polisher Located in Fuel Components Operation Bldg at Facility. Welding Spark Ignited Zirconium & Caused Fire.Fire Isolated to Single Piece of Equipment & Did Not Spread | |
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | 21 September 1989 | PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing | |
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | 21 September 1989 | PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies | |
PNO-II-89-067, on 890921,alert Declared Due to Loss of Audible Annunciators to Control Board.Caused by Short in Annunciator Reset Circuitry in safety-related Control Panel. Short Removed & Annunciator Operability Verified | 21 September 1989 | PNO-II-89-067:on 890921,alert Declared Due to Loss of Audible Annunciators to Control Board.Caused by Short in Annunciator Reset Circuitry in safety-related Control Panel. Short Removed & Annunciator Operability Verified | |
PNO-II-89-048, on 890617,reactor Manually Scrammed Following Loss of Offsite Power.Caused by Troubleshooting in Progress to Investigate Ground on Startup Auxiliary Transformer (Sat).Plant to Remain Shutdown Until SAT Repaired | 19 June 1989 | PNO-II-89-048:on 890617,reactor Manually Scrammed Following Loss of Offsite Power.Caused by Troubleshooting in Progress to Investigate Ground on Startup Auxiliary Transformer (Sat).Plant to Remain Shutdown Until SAT Repaired | Reactor Vessel Water Level |
PNO-II-88-043C, Augmented Insp Team Dispatched to Site on 880715 & Departed on 880722,after Informal Debriefing W/ Licensee on Insp Findings.Team Continues to Review Several Mod Packages & Positions Re Dc Motor Deficiencies | 25 July 1988 | PNO-II-88-043C:Augmented Insp Team Dispatched to Site on 880715 & Departed on 880722,after Informal Debriefing W/ Licensee on Insp Findings.Team Continues to Review Several Mod Packages & Positions Re Dc Motor Deficiencies | |
PNO-II-88-043B, on 880722,augmented Insp Team at Brunswick Departs.Team Completed Review of Events & Associated Corrective Actions for Equipment Failures Encountered During Shutdown & DC Motor Problems | 22 July 1988 | PNO-II-88-043B:on 880722,augmented Insp Team at Brunswick Departs.Team Completed Review of Events & Associated Corrective Actions for Equipment Failures Encountered During Shutdown & DC Motor Problems | |
PNO-II-88-043A, on 880715,augmented Insp Team Reviewed Events & Associated Corrective Actions for Equipment Failures.All Repairs Completed on 880716 Except Testing.Request for HPCI Limiting Condition for Operation Extension Granted | 20 July 1988 | PNO-II-88-043A:on 880715,augmented Insp Team Reviewed Events & Associated Corrective Actions for Equipment Failures.All Repairs Completed on 880716 Except Testing.Request for HPCI Limiting Condition for Operation Extension Granted | |
PNO-II-88-043, on 880715,Augmented Insp Team Dispatched to Plant to Review Equipment Failure Events That Were Encountered During Planned Shutdown of Facility,Including Failure of F006 HPCI Valve | 15 July 1988 | PNO-II-88-043:on 880715,Augmented Insp Team Dispatched to Plant to Review Equipment Failure Events That Were Encountered During Planned Shutdown of Facility,Including Failure of F006 HPCI Valve | |
PNO-II-88-042, on 880713,NRC Notified of Util Intent to Initiate Shutdown of Unit to Repair F006 Injection Valve on HPCI Sys.Shutdown Prompted by Evaluation Indicating That Inadequate Torque May Be Available Under Reduced Voltage | 13 July 1988 | PNO-II-88-042:on 880713,NRC Notified of Util Intent to Initiate Shutdown of Unit to Repair F006 Injection Valve on HPCI Sys.Shutdown Prompted by Evaluation Indicating That Inadequate Torque May Be Available Under Reduced Voltage | |
PNO-II-88-014, on 880219,util Discovered Random Failures of 5/16 Inch Silicon/Bronze Carriage Bolts Which Are Used to Tie Electrical Busses Together within Panels.Bolts Replaced. NRC Pursuing Generic Implications W/Ge | 26 February 1988 | PNO-II-88-014:on 880219,util Discovered Random Failures of 5/16 Inch Silicon/Bronze Carriage Bolts Which Are Used to Tie Electrical Busses Together within Panels.Bolts Replaced. NRC Pursuing Generic Implications W/Ge | |
PNO-II-88-003, licensee Identified 4 Inch 85% Throughwall Circumferential Indication on E 12-inch Inlet Recirculation Riser to Nozzle Safe & Weld,While Performing Automated Ultrasonic Testing | 14 January 1988 | PNO-II-88-003:licensee Identified 4 Inch 85% Throughwall Circumferential Indication on E 12-inch Inlet Recirculation Riser to Nozzle Safe & Weld,While Performing Automated Ultrasonic Testing | |
PNO-II-88-001, on 880102,primary Containment Isolation Valves Drywell Equipment & Floor Drains Failed to Close Automatically After Receipt of Valid Group 2 Isolation Signal.Cause Under Investigation.Insp Team Dispatched | 4 January 1988 | PNO-II-88-001:on 880102,primary Containment Isolation Valves Drywell Equipment & Floor Drains Failed to Close Automatically After Receipt of Valid Group 2 Isolation Signal.Cause Under Investigation.Insp Team Dispatched | |
PNO-II-87-052, on 870726,maint Worker Found Unconscious Near Base of Air Conditioning Chiller Unit.Worker Taken to Hosp & Died on 870727.Cause of Death Unknown & Being Investigated | 28 July 1987 | PNO-II-87-052:on 870726,maint Worker Found Unconscious Near Base of Air Conditioning Chiller Unit.Worker Taken to Hosp & Died on 870727.Cause of Death Unknown & Being Investigated | |
PNO-II-87-051, on 870724,DOE,Oak Ridge Operations Ofc Notified NRC of Potential for Cracks in 1-inch Valves Used on UF6 Cylinders.Seven Valves Cracked Upon Installation Onto Cylinder.Doe Recommends That Valves Be Replaced | 27 July 1987 | PNO-II-87-051:on 870724,DOE,Oak Ridge Operations Ofc Notified NRC of Potential for Cracks in 1-inch Valves Used on UF6 Cylinders.Seven Valves Cracked Upon Installation Onto Cylinder.Doe Recommends That Valves Be Replaced | |
PNO-II-87-023, on 870406,unit Shut Down for More than 48 H Due to Increase in Unidentified Leakage in Drywell.Caused by Leaks in Recirculation Pump a Discharge Valve Packing & Outboard Feedwater Sys Check Valves | 7 April 1987 | PNO-II-87-023:on 870406,unit Shut Down for More than 48 H Due to Increase in Unidentified Leakage in Drywell.Caused by Leaks in Recirculation Pump a Discharge Valve Packing & Outboard Feedwater Sys Check Valves | Packing leak Unidentified leakage |
PNO-II-86-065, on 860917,reactor Manually Tripped from 3% Power Due to Decreasing Condenser Vacuum.Caused by Leak in Condenser Tube Cleaning Sys & Flooding of Condenser Inlet Pit.Leak Isolated & Plant Taken to Hot Shutdown | 19 September 1986 | PNO-II-86-065:on 860917,reactor Manually Tripped from 3% Power Due to Decreasing Condenser Vacuum.Caused by Leak in Condenser Tube Cleaning Sys & Flooding of Condenser Inlet Pit.Leak Isolated & Plant Taken to Hot Shutdown | |
PNO-II-86-053, on 860721,GE Evacuated Commercial Fuel in Wilmington,Nc & Assembled Emergency Team When Plant Evacuation Alarm Sys Was Activated.Incident Occurred While Routine Maint Was Performed on Alarm.State of Nc Informed | 23 July 1986 | PNO-II-86-053:on 860721,GE Evacuated Commercial Fuel in Wilmington,Nc & Assembled Emergency Team When Plant Evacuation Alarm Sys Was Activated.Incident Occurred While Routine Maint Was Performed on Alarm.State of Nc Informed | |
PNO-II-86-024, on 860326,reactor Scrammed Due to Turbine Trip.Caused by Spurious High Reactor Water Level Signal. Plant Brought to Cold Shutdown to Repair Degraded Reactor Recirculation Pump Seal.Outage Expected to Last 6 Days | 27 March 1986 | PNO-II-86-024:on 860326,reactor Scrammed Due to Turbine Trip.Caused by Spurious High Reactor Water Level Signal. Plant Brought to Cold Shutdown to Repair Degraded Reactor Recirculation Pump Seal.Outage Expected to Last 6 Days | Reactor Vessel Water Level |
PNO-II-86-017A, on 860223,some Contamination Found on Protective Clothing & Stretcher Used to Transfer Const Worker Who Fell in Drywell.Surveys Show Contamination Confined to Single Spot | 25 February 1986 | PNO-II-86-017A:on 860223,some Contamination Found on Protective Clothing & Stretcher Used to Transfer Const Worker Who Fell in Drywell.Surveys Show Contamination Confined to Single Spot | |
PNO-II-86-017, on 860223,contract Const Worker Lost Footing & Fell 3 Ft in Drywell.Cause Not Stated.Worker Sent to Hosp.No Contamination Found on Worker,Protective Clothing,In Ambulance or at Hosp | 24 February 1986 | PNO-II-86-017:on 860223,contract Const Worker Lost Footing & Fell 3 Ft in Drywell.Cause Not Stated.Worker Sent to Hosp.No Contamination Found on Worker,Protective Clothing,In Ambulance or at Hosp | |
PNO-II-85-091, Region II Dispatched Emergency Response Specialist to Plant to Set Up High Frequency Radio Communications as Result of Hurricane Gloria.Unit 1 in Shutdown for Refueling | 3 October 1985 | PNO-II-85-091:Region II Dispatched Emergency Response Specialist to Plant to Set Up High Frequency Radio Communications as Result of Hurricane Gloria.Unit 1 in Shutdown for Refueling | |
PNO-II-85-093, on 850926,Unit 2 Shut Down & on 850927,Unit 1 Shut Down Due to Hurricane Gloria w/35-40 Miles Per Hour Winds.Unit 1 Expected to Restart on 850927.Unit 2 Will Remain Shut Down for 2 Wks for Repair of LPSI Valves | 27 September 1985 | PNO-II-85-093:on 850926,Unit 2 Shut Down & on 850927,Unit 1 Shut Down Due to Hurricane Gloria w/35-40 Miles Per Hour Winds.Unit 1 Expected to Restart on 850927.Unit 2 Will Remain Shut Down for 2 Wks for Repair of LPSI Valves |