Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph18 October 1999PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph
PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph15 September 1999PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph
PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph15 September 1999PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph
PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph15 September 1999PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph
PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph15 September 1999PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 MphSiren
PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph15 September 1999PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph
PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 99083131 August 1999PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831Siren
PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained30 August 1999PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was SustainedSiren
PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary24 November 1998PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary
PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens27 August 1998PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning SirensSiren
PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility27 August 1998PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility
PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported26 August 1998PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported
PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area26 August 1998PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area
PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site25 August 1998PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site
PNO-II-98-016, on 980316,licensee Declared Alert Due to Fire in Dumpster Located Outside Fuels Mfg Operations Bldg. Extinguished Fire,Inspected Roof & Posted Hourly Fire Watch. Licensee Will Investigate Root Causes & CAs to Be Taken17 March 1998PNO-II-98-016:on 980316,licensee Declared Alert Due to Fire in Dumpster Located Outside Fuels Mfg Operations Bldg. Extinguished Fire,Inspected Roof & Posted Hourly Fire Watch. Licensee Will Investigate Root Causes & CAs to Be TakenHourly Fire Watch
PNO-II-97-049, on 970904,stack Sample Above Licensee Action Was Noted.Sample Taken from H Fluoride Bldg Exhaust Stack.Environ Air Samples Collected at Site Boundary & Radioactivity Levels Determined to Be Background5 September 1997PNO-II-97-049:on 970904,stack Sample Above Licensee Action Was Noted.Sample Taken from H Fluoride Bldg Exhaust Stack.Environ Air Samples Collected at Site Boundary & Radioactivity Levels Determined to Be Background
PNO-II-97-044, on 970808,thirty-seven Salaried Positions Eliminated,Fifteen Positions Resulted from Voluntary Separation & twenty-two Involuntary Eliminations.Areas Affected Were Design,Engineering & Production Scheduling14 August 1997PNO-II-97-044:on 970808,thirty-seven Salaried Positions Eliminated,Fifteen Positions Resulted from Voluntary Separation & twenty-two Involuntary Eliminations.Areas Affected Were Design,Engineering & Production Scheduling
PNO-II-93-067, on 931130,util Announced That Indepth Independent Review Found No Evidence to Support Allegations That Util Discovered Cracks in Plant Core Shrouds in 1984, But Covered Up Existance of Cracks Until 199330 November 1993PNO-II-93-067:on 931130,util Announced That Indepth Independent Review Found No Evidence to Support Allegations That Util Discovered Cracks in Plant Core Shrouds in 1984, But Covered Up Existance of Cracks Until 1993
PNO-II-93-060, on 931108,licensee Made NOUE When Potentially Contaminated Employee Transported to Dosher Memorial Hosp in Southport,Nc.Employee Partially Surveyed Due to Injuries. Employee Subsequently Determined Not to Be Contaminated8 November 1993PNO-II-93-060:on 931108,licensee Made NOUE When Potentially Contaminated Employee Transported to Dosher Memorial Hosp in Southport,Nc.Employee Partially Surveyed Due to Injuries. Employee Subsequently Determined Not to Be Contaminated
PNO-II-93-050, on 930928,media Issued Statement Re Core Shroud Cracks at Facility.Activity Delayed Current Refueling Outage Schedule.Licensee Developing Permanent Mechanical Repair.State of Nc Informed28 September 1993PNO-II-93-050:on 930928,media Issued Statement Re Core Shroud Cracks at Facility.Activity Delayed Current Refueling Outage Schedule.Licensee Developing Permanent Mechanical Repair.State of Nc Informed
PNO-II-93-042, on 930830,NRC Entered Monitoring Mode, Responding to Hurricane Emily,Located SE of Brunswick Plant. Inspectors Observing Licensee Preparations.Region II Informed States of Nc & VA of Activity30 August 1993PNO-II-93-042:on 930830,NRC Entered Monitoring Mode, Responding to Hurricane Emily,Located SE of Brunswick Plant. Inspectors Observing Licensee Preparations.Region II Informed States of Nc & VA of Activity
PNO-II-92-007, on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC Sys5 February 1992PNO-II-92-007:on 920202,plant Experienced Reactor Scram from 79% Power During Main Turbine Cv Testing.Licensee Actions Towards Determining/Correcting Root Cause of Scram Have Been Focused on EHC SysHalf scram
PNO-II-91-044, on 910709,licensee Inadvertently Transferred Approx 400 Gallons of Liquid Containing Small Amounts of U from Favorable Geometry Tank (T-417) to Unfavorable Tank (V-103).State of Nc Notified10 July 1991PNO-II-91-044:on 910709,licensee Inadvertently Transferred Approx 400 Gallons of Liquid Containing Small Amounts of U from Favorable Geometry Tank (T-417) to Unfavorable Tank (V-103).State of Nc Notified
PNO-II-91-043, on 910707,NRC Authorized GE Co to Resume Normal Operation of Fluoride & Nitrate Waste Sys,Which Had Been Shut Down Subsequent to 910528 Event at Site8 July 1991PNO-II-91-043:on 910707,NRC Authorized GE Co to Resume Normal Operation of Fluoride & Nitrate Waste Sys,Which Had Been Shut Down Subsequent to 910528 Event at Site
ML20203C5944 June 1991PNO-IIT-91-001:on 910603,team Toured Facility & Examined Equipment & Instrumentation Associated W/Event.Team in Early Stages of Conducting Interviews,Reviewing Procedures & Drawings & Analyzing Facts
PNO-II-90-047B, on 900825,AIT Conducted Meeting Which Was Followed by Press Conference to Discuss Excessive Cooldown Rate in Reactor Vessel Lower Portion Experienced During 900816 & 19 Reactor Trips & Other Listed Items30 August 1990PNO-II-90-047B:on 900825,AIT Conducted Meeting Which Was Followed by Press Conference to Discuss Excessive Cooldown Rate in Reactor Vessel Lower Portion Experienced During 900816 & 19 Reactor Trips & Other Listed Items
PNO-II-90-047A, provides as Update to 900821 Notification Re 900819 Reactor Trip,Findings of Investigation.Reactor Trip Due to Closure of MSIVs Resulted from Primary Containment Isolation Sys Testing.Util Correcting Safety Relief Valves24 August 1990PNO-II-90-047A:provides as Update to 900821 Notification Re 900819 Reactor Trip,Findings of Investigation.Reactor Trip Due to Closure of MSIVs Resulted from Primary Containment Isolation Sys Testing.Util Correcting Safety Relief Valves
PNO-II-90-044, on 900802,fire Noticed in Tube Polisher Located in Fuel Components Operation Bldg at Facility. Welding Spark Ignited Zirconium & Caused Fire.Fire Isolated to Single Piece of Equipment & Did Not Spread2 August 1990PNO-II-90-044 :on 900802,fire Noticed in Tube Polisher Located in Fuel Components Operation Bldg at Facility. Welding Spark Ignited Zirconium & Caused Fire.Fire Isolated to Single Piece of Equipment & Did Not Spread
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing21 September 1989PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies21 September 1989PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies
PNO-II-89-067, on 890921,alert Declared Due to Loss of Audible Annunciators to Control Board.Caused by Short in Annunciator Reset Circuitry in safety-related Control Panel. Short Removed & Annunciator Operability Verified21 September 1989PNO-II-89-067:on 890921,alert Declared Due to Loss of Audible Annunciators to Control Board.Caused by Short in Annunciator Reset Circuitry in safety-related Control Panel. Short Removed & Annunciator Operability Verified
PNO-II-89-048, on 890617,reactor Manually Scrammed Following Loss of Offsite Power.Caused by Troubleshooting in Progress to Investigate Ground on Startup Auxiliary Transformer (Sat).Plant to Remain Shutdown Until SAT Repaired19 June 1989PNO-II-89-048:on 890617,reactor Manually Scrammed Following Loss of Offsite Power.Caused by Troubleshooting in Progress to Investigate Ground on Startup Auxiliary Transformer (Sat).Plant to Remain Shutdown Until SAT RepairedReactor Vessel Water Level
PNO-II-88-043C, Augmented Insp Team Dispatched to Site on 880715 & Departed on 880722,after Informal Debriefing W/ Licensee on Insp Findings.Team Continues to Review Several Mod Packages & Positions Re Dc Motor Deficiencies25 July 1988PNO-II-88-043C:Augmented Insp Team Dispatched to Site on 880715 & Departed on 880722,after Informal Debriefing W/ Licensee on Insp Findings.Team Continues to Review Several Mod Packages & Positions Re Dc Motor Deficiencies
PNO-II-88-043B, on 880722,augmented Insp Team at Brunswick Departs.Team Completed Review of Events & Associated Corrective Actions for Equipment Failures Encountered During Shutdown & DC Motor Problems22 July 1988PNO-II-88-043B:on 880722,augmented Insp Team at Brunswick Departs.Team Completed Review of Events & Associated Corrective Actions for Equipment Failures Encountered During Shutdown & DC Motor Problems
PNO-II-88-043A, on 880715,augmented Insp Team Reviewed Events & Associated Corrective Actions for Equipment Failures.All Repairs Completed on 880716 Except Testing.Request for HPCI Limiting Condition for Operation Extension Granted20 July 1988PNO-II-88-043A:on 880715,augmented Insp Team Reviewed Events & Associated Corrective Actions for Equipment Failures.All Repairs Completed on 880716 Except Testing.Request for HPCI Limiting Condition for Operation Extension Granted
PNO-II-88-043, on 880715,Augmented Insp Team Dispatched to Plant to Review Equipment Failure Events That Were Encountered During Planned Shutdown of Facility,Including Failure of F006 HPCI Valve15 July 1988PNO-II-88-043:on 880715,Augmented Insp Team Dispatched to Plant to Review Equipment Failure Events That Were Encountered During Planned Shutdown of Facility,Including Failure of F006 HPCI Valve
PNO-II-88-042, on 880713,NRC Notified of Util Intent to Initiate Shutdown of Unit to Repair F006 Injection Valve on HPCI Sys.Shutdown Prompted by Evaluation Indicating That Inadequate Torque May Be Available Under Reduced Voltage13 July 1988PNO-II-88-042:on 880713,NRC Notified of Util Intent to Initiate Shutdown of Unit to Repair F006 Injection Valve on HPCI Sys.Shutdown Prompted by Evaluation Indicating That Inadequate Torque May Be Available Under Reduced Voltage
PNO-II-88-014, on 880219,util Discovered Random Failures of 5/16 Inch Silicon/Bronze Carriage Bolts Which Are Used to Tie Electrical Busses Together within Panels.Bolts Replaced. NRC Pursuing Generic Implications W/Ge26 February 1988PNO-II-88-014:on 880219,util Discovered Random Failures of 5/16 Inch Silicon/Bronze Carriage Bolts Which Are Used to Tie Electrical Busses Together within Panels.Bolts Replaced. NRC Pursuing Generic Implications W/Ge
PNO-II-88-003, licensee Identified 4 Inch 85% Throughwall Circumferential Indication on E 12-inch Inlet Recirculation Riser to Nozzle Safe & Weld,While Performing Automated Ultrasonic Testing14 January 1988PNO-II-88-003:licensee Identified 4 Inch 85% Throughwall Circumferential Indication on E 12-inch Inlet Recirculation Riser to Nozzle Safe & Weld,While Performing Automated Ultrasonic Testing
PNO-II-88-001, on 880102,primary Containment Isolation Valves Drywell Equipment & Floor Drains Failed to Close Automatically After Receipt of Valid Group 2 Isolation Signal.Cause Under Investigation.Insp Team Dispatched4 January 1988PNO-II-88-001:on 880102,primary Containment Isolation Valves Drywell Equipment & Floor Drains Failed to Close Automatically After Receipt of Valid Group 2 Isolation Signal.Cause Under Investigation.Insp Team Dispatched
PNO-II-87-052, on 870726,maint Worker Found Unconscious Near Base of Air Conditioning Chiller Unit.Worker Taken to Hosp & Died on 870727.Cause of Death Unknown & Being Investigated28 July 1987PNO-II-87-052:on 870726,maint Worker Found Unconscious Near Base of Air Conditioning Chiller Unit.Worker Taken to Hosp & Died on 870727.Cause of Death Unknown & Being Investigated
PNO-II-87-051, on 870724,DOE,Oak Ridge Operations Ofc Notified NRC of Potential for Cracks in 1-inch Valves Used on UF6 Cylinders.Seven Valves Cracked Upon Installation Onto Cylinder.Doe Recommends That Valves Be Replaced27 July 1987PNO-II-87-051:on 870724,DOE,Oak Ridge Operations Ofc Notified NRC of Potential for Cracks in 1-inch Valves Used on UF6 Cylinders.Seven Valves Cracked Upon Installation Onto Cylinder.Doe Recommends That Valves Be Replaced
PNO-II-87-023, on 870406,unit Shut Down for More than 48 H Due to Increase in Unidentified Leakage in Drywell.Caused by Leaks in Recirculation Pump a Discharge Valve Packing & Outboard Feedwater Sys Check Valves7 April 1987PNO-II-87-023:on 870406,unit Shut Down for More than 48 H Due to Increase in Unidentified Leakage in Drywell.Caused by Leaks in Recirculation Pump a Discharge Valve Packing & Outboard Feedwater Sys Check ValvesPacking leak
Unidentified leakage
PNO-II-86-065, on 860917,reactor Manually Tripped from 3% Power Due to Decreasing Condenser Vacuum.Caused by Leak in Condenser Tube Cleaning Sys & Flooding of Condenser Inlet Pit.Leak Isolated & Plant Taken to Hot Shutdown19 September 1986PNO-II-86-065:on 860917,reactor Manually Tripped from 3% Power Due to Decreasing Condenser Vacuum.Caused by Leak in Condenser Tube Cleaning Sys & Flooding of Condenser Inlet Pit.Leak Isolated & Plant Taken to Hot Shutdown
PNO-II-86-053, on 860721,GE Evacuated Commercial Fuel in Wilmington,Nc & Assembled Emergency Team When Plant Evacuation Alarm Sys Was Activated.Incident Occurred While Routine Maint Was Performed on Alarm.State of Nc Informed23 July 1986PNO-II-86-053:on 860721,GE Evacuated Commercial Fuel in Wilmington,Nc & Assembled Emergency Team When Plant Evacuation Alarm Sys Was Activated.Incident Occurred While Routine Maint Was Performed on Alarm.State of Nc Informed
PNO-II-86-024, on 860326,reactor Scrammed Due to Turbine Trip.Caused by Spurious High Reactor Water Level Signal. Plant Brought to Cold Shutdown to Repair Degraded Reactor Recirculation Pump Seal.Outage Expected to Last 6 Days27 March 1986PNO-II-86-024:on 860326,reactor Scrammed Due to Turbine Trip.Caused by Spurious High Reactor Water Level Signal. Plant Brought to Cold Shutdown to Repair Degraded Reactor Recirculation Pump Seal.Outage Expected to Last 6 DaysReactor Vessel Water Level
PNO-II-86-017A, on 860223,some Contamination Found on Protective Clothing & Stretcher Used to Transfer Const Worker Who Fell in Drywell.Surveys Show Contamination Confined to Single Spot25 February 1986PNO-II-86-017A:on 860223,some Contamination Found on Protective Clothing & Stretcher Used to Transfer Const Worker Who Fell in Drywell.Surveys Show Contamination Confined to Single Spot
PNO-II-86-017, on 860223,contract Const Worker Lost Footing & Fell 3 Ft in Drywell.Cause Not Stated.Worker Sent to Hosp.No Contamination Found on Worker,Protective Clothing,In Ambulance or at Hosp24 February 1986PNO-II-86-017:on 860223,contract Const Worker Lost Footing & Fell 3 Ft in Drywell.Cause Not Stated.Worker Sent to Hosp.No Contamination Found on Worker,Protective Clothing,In Ambulance or at Hosp
PNO-II-85-091, Region II Dispatched Emergency Response Specialist to Plant to Set Up High Frequency Radio Communications as Result of Hurricane Gloria.Unit 1 in Shutdown for Refueling3 October 1985PNO-II-85-091:Region II Dispatched Emergency Response Specialist to Plant to Set Up High Frequency Radio Communications as Result of Hurricane Gloria.Unit 1 in Shutdown for Refueling
PNO-II-85-093, on 850926,Unit 2 Shut Down & on 850927,Unit 1 Shut Down Due to Hurricane Gloria w/35-40 Miles Per Hour Winds.Unit 1 Expected to Restart on 850927.Unit 2 Will Remain Shut Down for 2 Wks for Repair of LPSI Valves27 September 1985PNO-II-85-093:on 850926,Unit 2 Shut Down & on 850927,Unit 1 Shut Down Due to Hurricane Gloria w/35-40 Miles Per Hour Winds.Unit 1 Expected to Restart on 850927.Unit 2 Will Remain Shut Down for 2 Wks for Repair of LPSI Valves