Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20205P167 | 31 January 1999 | a POST-PLUME Phase, Federal Participation Exercise | High winds Met Tower Earthquake Fuel cladding |
ML20155J691 | 9 October 1998 | Staff Response to Tasking Memorandum & Stakeholder Concerns | Probabilistic Risk Assessment Backfit |
ML18151A524 | 28 February 1997 | a Pilot Application of RISK-INFORMED Methods to Establish Inservice Inspection Priorities for Nuclear Components at Surry Unit 1 Nuclear Power Station | Probabilistic Risk Assessment Nondestructive Examination Earthquake |
ML20134K418 | 11 October 1995 | Region 1 Plant Status Rept, for Plant,Units 1 & 2,dtd 951011 | Loop seal Enforcement Discretion Fire Protection Program |
ML20199L503 | 23 August 1995 | Interview Rept of G Narasimham on 950816 Re Investigation Case 1-95-013.Supporting Documentation Encl | |
ML20134K103 | 24 March 1995 | Organizational Effectiveness Assessment Rept for Sngs, | |
ML20134K351 | 22 March 1995 | Region 1 Plant Status Rept, for Plant,Units 1 & 2,dtd 950322 | Loop seal Enforcement Discretion Fire Protection Program |
ML20137Y722 | 16 June 1994 | Technical Issue Summary RI-94-04, Pressurizer Safety Valves & Solid Plant Operation | Loop seal |
ML20134J894 | 22 March 1994 | Region 1 Plant Status Rept for Plant,Units 1 & 2 | |
ML20056E517 | 31 August 1993 | Technical Review Rept, Tardy Licensee Actions | |
ML20055F811 | 3 July 1990 | AEOD/E90-06, Potential for RHR Sys Pump Damage | |
ML20248F000 | 29 September 1989 | Debris in Containment Recirculation Sumps, Technical Review Rept | Boric Acid Foreign Material Exclusion |
ML20245B606 | 31 August 1988 | Inadequate NPSH in HPSI Sys in Pwrs, Engineering Evaluation Rept | |
ML20204J614 | 31 August 1988 | AEOD/E807, Pump Damage Due to Low Flow Cavitation | |
ML20196G525 | 15 June 1988 | Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector | |
ML20245H960 | 15 April 1988 | BWR Overfill Events Resulting in Steam Line Flooding, AEOD Engineering Evaluation Rept | Safe Shutdown |
ML20148D067 | 17 March 1988 | Headquarters Daily Rept for 880317 | Continuous fire watch Fire Protection Program |
ML20148B329 | 14 March 1988 | Headquarters Daily Rept for 880314 | |
ML20196H635 | 8 March 1988 | Headquarters Daily Rept for 880308 | Missed surveillance |
ML20196G888 | 3 March 1988 | Headquarters Daily Rept for 880303 | Half scram Systematic Assessment of Licensee Performance Liquid penetrant |
ML20147E321 | 6 January 1988 | Rept of Interview W/Rg Lagrange to Discuss Gpu 830520 & s Re Environ Qualification equipment.Marked-up 850409 Statement from H Hukill Also Encl | |
ML20147E396 | 6 January 1988 | Rept of Interview W/Rg Lagrange on 841206 & 14 to Discuss Info Contained in B Hayes 841017 Memo Identifying Series of Submittals Received from Util Between 1980 & 1984 | |
ML20235F963 | 24 September 1987 | Idi:Essential Raw Cooling Water Sys Evaluation of Licensee Response to Rept Items | |
ML20237L300 | 24 August 1987 | AEOD/E709 Engineering Evaluation Rept Re Auxiliary Feedwater Trips Caused by Low Suction Pressure.Draft Info Notice Encl | Earthquake |
ML20245B666 | 5 August 1987 | AEOD/T707, Undetected Loss of Reactor Water, Technical Review Rept | Boric Acid |
ML20235C931 | 23 June 1987 | Rept to ACRS Re Humboldt Bay Unit 3 - Core II | |
IR 05000412/1987044 | 27 May 1987 | Initial OL Review Rept for Facility (Insp Rept 50-412/87-44) | Boric Acid Hydrostatic Liquid penetrant Fire Protection Program |
ML20212F658 | 31 December 1986 | Technical Review Rept, Degradation of Safety Sys Due to Component Misalignment &/Or Mispositioned Control/Selector Switches | Boric Acid Operator Manual Action |
ML20212D909 | 23 December 1986 | Localized Rod Cluster Control Assembly (Rcca) Wear at PWR Plants, Engineering Evaluation Rept | Shutdown Margin Flow Induced Vibration |
ML20212B032 | 17 December 1986 | Emergency Diesel Generator Component Failures Due to Vibration, Engineering Evaluation Rept | |
ML20215H180 | 17 October 1986 | Initial OL Readiness Assessment for Braidwood Station, Unit 1 | Anchor Darling FLEX Systematic Assessment of Licensee Performance |
ML20214R485 | 9 October 1986 | Initial OL Review Rept for Seabrook Station Unit 1 | Safe Shutdown Non-Destructive Examination Hydrostatic Nondestructive Examination Systematic Assessment of Licensee Performance Exemption Request Liquid penetrant Fire Protection Program |
ML20205G606 | 31 August 1986 | Emergency Operating Procedures Generation Package Implementation Audit Rept,North Anna Power Station,Units 1 & 2 | |
ML20212K664 | 7 August 1986 | Inadvertent Recirculation Actuation Signals at C-E Plants, Technical Review Rept | |
ML20202H223 | 31 May 1986 | Rev 1 to Engineering Evaluation Rept, Core Damage Precursor Event at Trojan | Systematic Assessment of Licensee Performance |
ML20206H087 | 3 March 1986 | Allegation Review Data Sheet for Case 4-85-A-013 Re Const Activities.Addl Info Requested from Alleger.Case Closed Due to Lack of Response.Related Info Encl | |
ML20206H076 | 21 January 1986 | Allegation Review Data Sheet for Case 4-84-A-085 Re Alteration of Personnel Records.Based on Resolution of Allegation 4-84-A-094,case Closed | |
ML20137X615 | 9 January 1986 | Engineering Evaluation of Deficient Operator Actions Following Dual Function Valve Failures | |
ML20234F560 | 17 December 1985 | Draft Hazards Analysis | Earthquake |
ML20234F475 | 17 December 1985 | Licensing of Power Reactors by Aec | |
ML20214T221 | 25 November 1985 | Initial OL Review Rept:Millstone Point Unit 3 | Coatings Nondestructive Examination Systematic Assessment of Licensee Performance |
ML20137Y198 | 31 October 1985 | Engineering Evaluation for Core Damage Precursor Event at Trojan | Systematic Assessment of Licensee Performance |
ML20206H062 | 15 October 1985 | Allegation Review Data Sheet for Case 4-85-A-045 Re Inadequate Handling/Installation Procedures for Equipment, Vendor Control Programs & Spare Parts.Based on Insp Rept 50-482/85-22,case Closed | |
ML20206H037 | 2 October 1985 | Allegation Review Data Sheet for Case 4-85-A-044 Re Lack of Effective QA Programs & QC Insps.Based on Insp Rept 50-482/85-22,allegation Closed | |
IR 05000482/1985019 | 30 September 1985 | Allegation Review Data Sheet for Case 4-85-A-050 Re Mishandling of Document Control Program.Concerns Addressed in Insp Rept 50-482/85-19.Dept of Labor & Allegation Cases Closed | |
ML20206H013 | 27 September 1985 | Allegation Review Data Sheet for Case 4-84-A-076 Re Vague Administrative Procedures,Calibr Program Not Working,Test Engineer Authority & Harassment.Based on Insp Rept 50-482/85-03,case Closed | |
ML20137B123 | 16 September 1985 | HPCS Sys Relief Valve Failures, Engineering Evaluation Rept | |
ML20206G843 | 3 September 1985 | Allegation Review Data Sheet for Case 4-84-A-013 Re Improper Termination of Employee Due to Refusal to Weld Laminated Pipe.Welding non-safety Related.Case Closed on 850827.W/ 840315 Telcon Record & Addl Info | |
IR 05000482/1985031 | 28 August 1985 | Allegation Review Data Sheet for Case 4-85-A-077 Re 6 Rem Exposure in Containment Bldg Due to Pipe Break.Allegation Investigated During Insp 50-482/85-31 on 850715-19 & Found Unsubstantiated | Overexposure |
ML20206G778 | 27 August 1985 | Allegation Review Data Sheet for Case 4-84-A-195 Re Quality First.Fuel Load Issue Resolved in Insp Rept 50-482/85-10. Technical Issues to Be Resolved Prior to Full Power Licensing.Case Closed w/850815 Memo to File |