ML24012A04216 November 2023FAQ 23-03 Turkey Point IE01 Proposed NRC ResponsePower change
L-2023-131, Subsequent License Renewal Application - Second Annual Update28 September 2023Subsequent License Renewal Application - Second Annual UpdateBoric Acid
Aging Management
License Renewal
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)21 August 2023Inservice Inspection Program Owner'S Activity Report (OAR-1)Boric Acid
L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)11 July 2023In-Service Inspection Program Owner'S Activity Report (OAR-1)
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications27 March 2023and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding
L-2023-009, Owner'S Activity Report31 January 2023Owner'S Activity Report
ML22227A05315 August 2022Biological Opinion for the Continued Operation of St. Lucie Nuclear Power PlantBiofouling
L-2022-038, Emergency Response Data System (Eros) Changes17 May 2022Emergency Response Data System (Eros) Changes
ML22124A01130 April 2022Scoping Summary Report - FinalLicense Renewal
Subsequent License Renewal
ML22010A0944 January 2022Trp 29 St. Lucie SLRA - Tank Breakout
L-2021-178, Report of 10 CFR 50.59 Plant Changes8 November 2021Report of 10 CFR 50.59 Plant Changes
L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions16 September 2021Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment RevisionsSafe Shutdown
FLEX
ML21042A07917 February 2021DAEC Executive Summary of Risk Assessment of Derecho Impact on Duane ArnoldHigh winds
FLEX
NG-20-0071, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to COVID-19 Pandemic22 September 2020Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to COVID-19 PandemicFLEX
Exemption Request
Pandemic
Coronavirus
COVID-19
L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification25 November 2019Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - NotificationHydrostatic
Moisture barrier
Biofouling
ML19252A4009 September 2019FPL to NRC, Notification of Smalltooth Sawfish Capture at St. Lucie
L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report6 August 201910 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
ML19002A16012 March 2019Nrc'S Record of Decision for the License Renewal Application for Seabrook Station, Unit 1 - 1-4-19Incorporated by reference
License Renewal
Environmental Justice
ML19101A45514 November 2018Samuel Miranda Public Comments for November 15, 2018 Seabrook LRA MeetingProbabilistic Risk Assessment
Aging Management
L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program21 September 2018Notification of Request for Use and Approval of Polyacrylic Acid Pilot ProgramCoatings
SBK-L-17172, Seventh Annual Update to the License Renewal Application18 October 2017Seventh Annual Update to the License Renewal ApplicationNon-Destructive Examination
Aging Management
Moisture barrier
L-2017-173, Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event28 September 2017Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event
L-2017-148, Special Report - Accident Monitoring Instrumentation11 August 2017Special Report - Accident Monitoring InstrumentationGrab sample
ML17191A41210 July 2017NextEra Service Position Paper: Seabrook Service Water TS 3.7.4
L-2017-123, Special Report - Standby Steam Generator Feedwater Pumps Inoperable29 June 2017Special Report - Standby Steam Generator Feedwater Pumps Inoperable
L-2017-124, Flooding Focused Evaluation Summary29 June 2017Flooding Focused Evaluation SummaryHigh winds
Internal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
Earthquake
SBK-L-17099, Flooding Focused Evaluation for Impact of New Flooding Hazard Information28 June 2017Flooding Focused Evaluation for Impact of New Flooding Hazard InformationInternal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
L-2017-117, Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-120 June 2017Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1Through-Wall Leak
NG-17-0095, Report of Facility Changes, Tests and Experiments, and Commitment Changes15 May 2017Report of Facility Changes, Tests and Experiments, and Commitment ChangesCoatings
L-2016-226, NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information20 December 2016NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard InformationHigh winds
Hydrostatic
FLEX
Fukushima Dai-Ichi
Earthquake
ML16271A37423 September 2016Technical Requirements Manual (TRM)-Appendix a, Revision 0 - Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (EFPY)Hydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
SBK-L-16108, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events26 July 2016Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External EventsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Spent Fuel Pool Instrumentation
Earthquake
ML16147A19629 April 201610 CFR 50.59 Report, Revision 17 to Updated Final Safety Analysis Report, Revision 14 to Appendix R, Revision 15 to Appendix a, and Revision 146 to the Technical Requirements ManualSafe Shutdown
Spent Fuel Pool Instrumentation
ML16117A31226 April 2016SBK-L-16056 - NextEra Energy Seabrook, LLC - Revised Response to NRC 12/23/2015 Questions on Ceb Root CauseHydrostatic
Finite Element Analysis
L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis23 March 2016Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis
ML16013A47222 January 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term TaskSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML15352A0537 January 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of InsightsSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
L-2015-313, Special Report - Accident Monitoring Instrumentation18 December 2015Special Report - Accident Monitoring Instrumentation
L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan10 December 2015Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated PlanBoric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
SBK-L-15195, Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report7 November 2015Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report
ML15314A16029 October 2015St. Lucie, Units 1 and 2 - License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection ProgramAging Management
L-2015-221, Report of 10 CFR 50.59 Plant Changes16 October 2015Report of 10 CFR 50.59 Plant ChangesTornado Generated Missile
Fuel cladding
SBK-L-15181, FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End25 September 2015FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the EndHydrostatic
Earthquake
ML15274A21425 September 2015FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-1 Through Figure 4-33
ML15274A21225 September 2015FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Pp. 1 Through Figure 2-1High winds
Ultimate heat sink
Tornado Missile
Hydrostatic
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Earthquake
ML15240A1548 September 2015Staff Observations of Sump Strainer Head Loss Testing at Alden Laboratory for Generic Safety Issue 191
ML15208A04912 August 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of InsightsSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML15253A31130 July 2015Pressure and Temperature Limits Report (PTLR) for 32 and 54 Effective Full-Power Years (EFPY)Hydrostatic
Finite Element Analysis
Pressure and Temperature Limits Report
L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events14 May 2015Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsBoric Acid
FLEX
Fukushima Dai-Ichi
NG-15-0128, Submittal of Report of Facility Changes, Tests and Experiments, and Commitment Changes13 May 2015Submittal of Report of Facility Changes, Tests and Experiments, and Commitment Changes