Category:Report
MONTHYEARL-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program ML21062A1462021-04-21021 April 2021 Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation (2012 and 2015) L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds ML19002A1602019-03-12012 March 2019 Nrc'S Record of Decision for the License Renewal Application for Seabrook Station, Unit 1 - 1-4-19 ML19101A4552018-11-14014 November 2018 Samuel Miranda Public Comments for November 15, 2018 Seabrook LRA Meeting ML18012A5682018-01-12012 January 2018 Technical Evaluation Report: Storm Surge_Seabrook_January2018 SBK-L-17172, Seventh Annual Update to the License Renewal Application2017-10-18018 October 2017 Seventh Annual Update to the License Renewal Application SBK-L-17136, Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information2017-08-28028 August 2017 Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information ML17191A4122017-07-10010 July 2017 NextEra Service Position Paper: Seabrook Service Water TS 3.7.4 SBK-L-17099, Flooding Focused Evaluation for Impact of New Flooding Hazard Information2017-06-28028 June 2017 Flooding Focused Evaluation for Impact of New Flooding Hazard Information L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 20162017-04-17017 April 2017 Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 ML16279A0502016-07-31031 July 2016 Enclosure 3: MPR-4153, Revision 2, Seabrook Station-Approach for Determining Through-Thickness Expansion from Alkali-Silica Reaction, July 2016 (Seabrook Fp# 100918) (Non-proprietary) ML16279A0492016-07-31031 July 2016 Enclosure 2: Simpson Gumpertz & Heger, Inc., Evaluation and Design Confirmation of As-Deformed Ceb, 150252-CA-02, Revision 0, July 2016 (Seabrook FP#100985) ML16216A2422016-07-31031 July 2016 MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016 ML16216A2412016-07-31031 July 2016 MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016 SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 02016-07-27027 July 2016 Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0 SBK-L-16108, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events2016-07-26026 July 2016 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events ML16147A1962016-04-29029 April 2016 10 CFR 50.59 Report, Revision 17 to Updated Final Safety Analysis Report, Revision 14 to Appendix R, Revision 15 to Appendix a, and Revision 146 to the Technical Requirements Manual ML16117A3122016-04-26026 April 2016 SBK-L-16056 - NextEra Energy Seabrook, LLC - Revised Response to NRC 12/23/2015 Questions on Ceb Root Cause ML16068A1352016-02-27027 February 2016 Attachment 3 - Clean Copy of Seabrook Emergency Action Levels - Initiating Conditions, Threshold Values and Basis ML16068A1392016-02-27027 February 2016 Attachment 5 - Technical Information for Proposed Initiating Conditions and Emergency Action Levels ML16068A1312016-02-27027 February 2016 Attachment 2 - Markup of Seabrook Station Emergency Action Levels -Initiating Conditions, Threshold Values and Basis ML16068A1372016-02-27027 February 2016 Attachment 4 - NEI 99-01, Rev. 6, Deviations and Differences, Seabrook Station Nuclear Power Plant - Unit 1 SBK-L-15195, Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report2015-11-0707 November 2015 Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report ML15274A2142015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-1 Through Figure 4-33 ML15274A2122015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Pp. 1 Through Figure 2-1 SBK-L-15181, FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End2015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End ML15208A0492015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights SBK-L-14229, Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The...2014-12-19019 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The... ML14216A4062014-07-24024 July 2014 Attachment 5, WCAP-17444-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Seabrook Unit 1, (Non-proprietary) ML14216A4052014-07-24024 July 2014 Attachment 3, WCAP-17441-NP, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation SBK-L-14090, ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report.2014-05-31031 May 2014 ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report. ML14030A5522014-02-25025 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14049A1972014-02-14014 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Seabrook Station, TAC No.: MF0836 ML13295A2522013-12-17017 December 2013 Review of the 2012 Steam Generator Tube Inspections ML13267A3882013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13260A1612013-07-31031 July 2013 ANP-3243NP, Rev. 0, Seabrook Station Unit I Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report ML13189A1972013-07-0202 July 2013 Third Annual Update to License Renewal Application ML13099A0192013-03-19019 March 2013 Attachment 5 to SBK-L-13061, Holtec Non-Proprietary Licensing Report HI-2114996, Rev. 3, Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses. ML12340A4872012-11-21021 November 2012 Enclosure to SBK-L-12242, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic ML12339A2742012-09-13013 September 2012 Concrete Summary 4-12 SBK-L-12101, NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring2012-05-16016 May 2012 NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring ML12179A2822012-03-15015 March 2012 ASR at Seabrook Station, Shear and Lap Splice Testing ML12038A0382012-01-30030 January 2012 Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses (Holtec International Document HI-2114996, Revision 2 SBK-L-12256, WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation2011-10-31031 October 2011 WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation SBK-L-11173, First Annual Update to License Renewal Application and Changes to LRA Appendix a2011-08-25025 August 2011 First Annual Update to License Renewal Application and Changes to LRA Appendix a ML1109702602011-03-28028 March 2011 Nwt 817, Chemistry Control in the Seabrook Thermal Barrier Loop, Final 2023-03-27
[Table view] Category:Miscellaneous
MONTHYEARL-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML19002A1602019-03-12012 March 2019 Nrc'S Record of Decision for the License Renewal Application for Seabrook Station, Unit 1 - 1-4-19 ML19101A4552018-11-14014 November 2018 Samuel Miranda Public Comments for November 15, 2018 Seabrook LRA Meeting SBK-L-17172, Seventh Annual Update to the License Renewal Application2017-10-18018 October 2017 Seventh Annual Update to the License Renewal Application ML17191A4122017-07-10010 July 2017 NextEra Service Position Paper: Seabrook Service Water TS 3.7.4 SBK-L-17099, Flooding Focused Evaluation for Impact of New Flooding Hazard Information2017-06-28028 June 2017 Flooding Focused Evaluation for Impact of New Flooding Hazard Information SBK-L-16108, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events2016-07-26026 July 2016 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events ML16147A1962016-04-29029 April 2016 10 CFR 50.59 Report, Revision 17 to Updated Final Safety Analysis Report, Revision 14 to Appendix R, Revision 15 to Appendix a, and Revision 146 to the Technical Requirements Manual ML16117A3122016-04-26026 April 2016 SBK-L-16056 - NextEra Energy Seabrook, LLC - Revised Response to NRC 12/23/2015 Questions on Ceb Root Cause SBK-L-15195, Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report2015-11-0707 November 2015 Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report ML15274A2142015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-1 Through Figure 4-33 ML15274A2122015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Pp. 1 Through Figure 2-1 SBK-L-15181, FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End2015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End ML15208A0492015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights SBK-L-14229, Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The...2014-12-19019 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The... SBK-L-14090, ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report.2014-05-31031 May 2014 ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report. ML13295A2522013-12-17017 December 2013 Review of the 2012 Steam Generator Tube Inspections ML13267A3882013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13189A1972013-07-0202 July 2013 Third Annual Update to License Renewal Application SBK-L-12101, NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring2012-05-16016 May 2012 NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring ML12179A2822012-03-15015 March 2012 ASR at Seabrook Station, Shear and Lap Splice Testing SBK-L-11173, First Annual Update to License Renewal Application and Changes to LRA Appendix a2011-08-25025 August 2011 First Annual Update to License Renewal Application and Changes to LRA Appendix a SBK-L-10118, 10 CFR 72.48 Report of Changes, Tests and Experiments2010-08-10010 August 2010 10 CFR 72.48 Report of Changes, Tests and Experiments ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1036203182010-01-21021 January 2010 Attachment 2, Document SEA-FLU-001-R-004, Rev 0, Non-Proprietary Version of Seabrook Station Reactor Pressure Vessel Fluence Evaluation at 55 EFPY ML0926503702009-08-12012 August 2009 Westinghouse Electric Company LLC, LTR-SGMP-09-100 NP-Attachment, Response to NRC Request for Additional Information on H*; Model F and Model D5 Steam Generators, Attachment 7 ML0926802512009-04-30030 April 2009 Attachment 3, Corrected Pages for WCAP-17071-NP, Revision 0 (Non-Proprietary) SBK-L-08179, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.2008-10-14014 October 2008 Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. SBK-L-06227, Enclosure 3 to Fple Letter SBK-L-06227 - Ealdbd, Rev a, Seabrook Emergency Action Level Design Basis Document2007-10-17017 October 2007 Enclosure 3 to Fple Letter SBK-L-06227 - Ealdbd, Rev a, Seabrook Emergency Action Level Design Basis Document SBK-L-07040, Semi-Annual Fitness-For-Duty Report for July-December 20062007-02-26026 February 2007 Semi-Annual Fitness-For-Duty Report for July-December 2006 SBK-L-07002, NRC Bulletin 2004-01, OR11, Inspection of Alloy 82/182/600 Materials 60-Day Report2007-01-0404 January 2007 NRC Bulletin 2004-01, OR11, Inspection of Alloy 82/182/600 Materials 60-Day Report ET 06-0035, Relaxation Request from First Revised NRC Order EA-03-009 Regarding Requirements for Nondestructive Examination of Nozzles Below J-Groove2006-10-0505 October 2006 Relaxation Request from First Revised NRC Order EA-03-009 Regarding Requirements for Nondestructive Examination of Nozzles Below J-Groove SBK-L-06176, Semi-Annual Fitness-For-Duty Report2006-08-31031 August 2006 Semi-Annual Fitness-For-Duty Report L-2006-180, Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater Questionnaire2006-07-31031 July 2006 Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater Questionnaire SBK-L-06071, Reactor Vessel Weld Wire Material Data Update2006-04-12012 April 2006 Reactor Vessel Weld Wire Material Data Update SBK-L-06068, Resubmittal of Semi-Annual Fitness-For-Duty Report2006-03-24024 March 2006 Resubmittal of Semi-Annual Fitness-For-Duty Report SBK-L-06017, Semi-Annual Fitness-for-Duty Report2006-03-0101 March 2006 Semi-Annual Fitness-for-Duty Report ML0727105622005-12-16016 December 2005 Caoldon Non-Proprietary Information Package for Seabrook/Nrc Meeting on December 16, 2005 SBK-L-05166, Semi-Annual Fitness-for-Duty Report2005-08-19019 August 2005 Semi-Annual Fitness-for-Duty Report SBK-L-05122, Cycle 11 Core Operating Limits Report2005-05-26026 May 2005 Cycle 11 Core Operating Limits Report SBK-L-05030, Semi-Annual Fitness-For-Duty Report from 07/1/2004 Through 12/31/20042005-02-23023 February 2005 Semi-Annual Fitness-For-Duty Report from 07/1/2004 Through 12/31/2004 ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement SBK-L-04019, Semi-Annual Fitness-For-Duty Report2004-08-26026 August 2004 Semi-Annual Fitness-For-Duty Report ML0415603482004-05-26026 May 2004 Special Report: Explosive Gas Monitoring Instrumentation Inoperable Greater than 30 Days ML0410501752004-04-0101 April 2004 Background Information to Support License Amendment Request 04-03, Application for Stretch Power Uprate ML0404906712004-02-0909 February 2004 Semi-Annual Fitness-for-Duty Report for Period Ending December 31, 2003 ML0402105202004-01-16016 January 2004 Part 21 Report Involving an Undersized Emergency Feedwater Pump Shaft ML0336405912003-12-23023 December 2003 Unusual Fish Impingement - December 2003 ML0332904522003-11-17017 November 2003 Cycle 10 Core Operating Limits Report 2023-03-27
[Table view] |
Text
Synoptic Wind and Prcssure Field Analysis Extent Scabrook Station Nuclear Power Plant 80'W 75Wt 70OW 65'W 60*W ¢J*UU gow nK*W 4'SW SO0N-55'N.
50ON-45'N" eON 40*N 30'No NextEra Energy (NEE)
Seabrook StationFiue44 O EN ER CO N Flooding Hazards Reevaluation Report Grid Domain Used in the Seabrook PMWS Analysis
Reference:
ESRI, 2015a FPL-081-PR-002 REV. 0
Hourly Surface 71,%V Stations 70"W
,,,4'h"
,-43'4 12"W 71,W 78W
- Staions ?J( Used 0 20 40 80 NextEra Energy (NEE) FO EN ER CO N Seabrook Station Figure 4-35 Flooding Hazards Reevaluation Report Location of Stations Used in the Wind and Pressure Recurrence Interval Analysis
Reference:
ESRI, 2015a; NOAA, 2014i, 2014j FPL-081-PR-002 REV. 0
tropical storm tracks passing Generate 30,400 synthetic within 150 km of 5eabrook H open coast near Seabrook. Perform statistical analysis of all 20,400 Run the storms through SLOSH model, determine the surge on the sirge estimates. Identify return periods.j a*
I Identify the 10 tracks with the Identify the 10 tracks with tl~e highest storm surge as completely cover the range of I
highest wind velocities over computed by SLOSH on the surg~e values computed with Seabrook site. open roast. SLOSHI on the= open coast
'dii II
! U SRun the identifled tracks through *the Delf't3D model to compire the surge at the Sealbrwxk site.
I I j Pefr titclaayi fUsingregreo eqainEstablish a linear regression esiatsIdniy eta ete a=set of 20'A00 Delft3D
- reetmts=open coast SLOSH ebetween a
IAdd 10% exceedance tide to surge estimates, Perform statistical analysis. Identify return periods OENERCON Figure 4-36 Hurricane Climatology Methodology Flow Diagram
Reference:
FPL-081-PR-002 REV. 0
~1 (a) Gene7tsfor~a~Tk (b) Density of genesis points for 9
8 7
8 S
4 3
2 1
8o0 ,
64w 48w NextEra Energy (NEE)
Seabrook Station (OENERCON Flooding Hazards Reevaluation Report Figure 4-37 Genesis Points and Their Probability Distribution for Seabrook FPL-081-PR-002 REV. 0
E C
3/
15 Time (days)
NextEra Energy (NEE)
Seabrook Station 0* ENERCON Flooding Hazards Reevaluation Report Figure 4-38 Example of Random Time Series Generated Using Equations 4-5 and 4-6 FPL-081-PR-002 REV. 0
ERA40; 1,000 Tracks
-90" N 70"N-Safflr-Simpson Hurricane Scale 5O.N Category Wind speeds 30' N- 30"N
- 10. N- 10" N Two 43-49 m/s, 83-95 kts o10'S96-110 mph, 154-t77 kmlh 10"S 33-42 m/s, 64-82 kts One 3OOS 74-95 mph, 119-153 kmih 30" S- Additional classifications 50" S 507O5 70"S-2 -~ I I I I U. U Ma U. U. w w w w i S S I !
(colors show Saffir-Simpson intensity)
NextEra Energy (NEE) EN ER CO N Seabrook Station Figure 4-39 Flooding Hazards Reevaluation Report Randomly Selected Tracks Generated Using Statistics from the ERA4O Reanalysis FPL-081-PR-002 REV. 0
NextEra Energy (NEE) 0 ENFigure ER CO N 4-40 Seabrook Station Comparison of 6-hour West-East (a) and South-North Flooding Hazards Reevaluation Report (b) North Atlantic track displacements between HURDAT (Bue) adhWindnskheh
_______________________________________________________________Bl__e)__ad____nd tsynhetic(red)track FPL-081-PR-002 REV. 0
Hurricane track density fb) 399 HURDAT tracs, 1970-2005 4{a) Z946 synthetic events (c) 399 synthetic tracks 50"N 50°N SON 40"N 40*N 30"N 30"N 3ON 20FN 20N 10"N 10rN wu- ~o-~rw wow zo-w 80"W 6"W 40"W z0"W U41W bU 4owW ZU~rW 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.1 0.0 0.1 0.2 0.3 ~
GA0.5 0.6 0.7 0.00 0.02 0.04 0.06 0.08 0.10 Number of events per 2.5" x 2.5" area per year NextEra Energy (NEE) 0 EN E R CON Seabrook Station Figure 4-41 Flooding Hazards Reevaluation Report Number of hurricane tracks per 2.5° latitude-longitude box FPL-081-PR-002 REV. 0
NextEra Energy (NEE) O EN ER C ON Seabrook Station Figure 4-42 Flooding Hazards Reevaluation Report Track Set with Maximum Wind Speeds Near Seabrook
Reference:
ESRI, 2015a FPL-081-PR-002 REV. 0
NextEra Energy (NEE)
- EN ER CO N Seabrook Station Figure 4-43 Flooding Hazards Reevaluation Report Tracks Set Producing Maximum Storm Surge with SLOSH model at Seabrook
Reference:
ESRI, 2015a FPL-081-PR-002 REV. 0
2 0.93 00 1.5 1
0.5 E 0
-0.5
-1
-1.5
-2 0 10 20 30 40 50 60 70¸ 80 Elapsed Time (hours)
- WSEL -10% Exceedance High Tide NextEra Energy (NEE) O EN ER C ON Seabrook Station Figure 4-44 Flooding Hazards Reevaluation Report Bounding Synoptic Event Still Water Elevation at Seabrook FPL-081-PR-002 REV. 0
R
- 00004 0.0001 0~000~ 0.0004 0.+00I 0.02 0.04 0+01I 040?
+ ++ *"mp* + *Ir llm+qllr
+m'mlF Ste aft $4g+wt@
i.I 1i)+,I eflcr c~rr~tc*l.m l'r'. gT' ....
Figlure *P14. ;dv, r~usp
- Lap.eruabtw, v*rtic1 mlwer al~m 1~I/g 0
NextEra Energy (NEE)0 EN RN Seabrook Station Figure 4-45 Flooding Hazards Reevaluation Report Wave Runup on Impermeable, Vertical Wall
Reference:
USAGE, 2011 FPL-072-PR-002 REV. 0
20* I I Bol~om of ,SwowlI z
-J - TuS..SLR.Sut UJ l Swge; 94¶775I 01 1O 12 0 1 2 3 4 5 7 8 9 11
! Wa~vo ~i.ioI~t O~ *1 SeawaU Saanttac~er~t I I
- l~r..t~oad (~) at Seawall o? i0~
o o0 i 0 2 :3 5 S 7 S a 10 ii 12 1
- 1.
- I Ow1op~*~g Volume tSop.d Pros~
25r- - Ove.1op~*g Volume ~Ve4oaI WW) -
0) 2 3 Time (hr)
NextEra Energy (NEE)
Seabrook Station 0 EN E R CON Figure 4-46 Flooding Hazards Reevaluation Report Time Series of Wave Overtopping FPL-072-PR-002 REV. 0
Domain and Bathymnetry points I
42.93 42.92 42.91F 42.9F
~1 42.89F 42.88 42.87F
-70.86 -70.85 -70.84 -70.83 -70.82 -70.18!
Longitude.
NextEra Energy (NEE) O ENERCON Seabrook Station Flooding Hazards Reevaluation Report Figure 4-47 Basin Domain and Bathymetry Points (cyan) for Hampton Harbor FPL-081-PR-002 REV. 0
Tsunami Observations Water Height 0-1ino¢ unkqnown 1-2m 2-~5m 5-10mn 10+m Deep Ocean Gauge I I I I I Eyewitness O~wvatioos/
Post-Tsunami 5urveys I I
- Iii ii lu lull ll NextEra Energy (NEE)
Seabrook Station 0 EN ER CO N Figure 4-48 Flooding Hazards Reevaluation Report Recorded Tsunami Runup Events on the Northeast
______ ___ ___ ___ ___ ___ ___ ___ ___Coast, USA
Reference:
ESRI, 2015a, 2015b; NOAA, 2014m FPL-081-PR-002 REV. 0
location observation ooints: <multiple>
meters-MSL 42.95r 20 15 10 42.9- 5 (n
0j o1) PMLW Obs. Point I0
-5
-. I.
-10 42.85 -15
-20
-25
-30 42.8
-70.86 -70.84 -70.82 -70.8 -70.78 -70.76 -70.74 -70.72 Longitude (degrees)
NextEra Energy (NEE) O ENERCON Seabrook Station Flooding Hazards Reevaluation Report Figure 4-49 Delft3D PMT Observation Points for Seabrook WSEL FPL-081-PR-002 REV. 0
NextEra Energy (NEE) O E NER CO N Seabrook Station Flooding Hazards Reevaluation Report Figure 4-50 Seismic Source Definitions FPL-081-PR-002 REV. 0
ThdSubevem crigin tume 2032 18 Nov 1929 (DG)' 2A9+/-* 150 Epcent" 44.69* N 56.00o W (DG)y 597+/-10" 7.2 +/- 0.3 Dip* 166+/-l?15 7.1 +/-+0.2 20 +/- Skmn 7.1 _ 0.1 1.9 +/- I X 10~' N..m M, (CM) 7.3 __3 x 10*" N-rn (10zt dyne-cmn) 8 +/- 2sec Firet Subevent 23.5 +/-t O.8sec 12? _.5 100__. 26 km Azilmuthl offset 32O0 +/- 100 140'+/-5° cf FSolution 20 +/-+2kin X 10O N-m Strike 5.3 +/- 1.1 3.3 +/- 3 x 10'tN-m
-0.51 +/- 0.5
-4.7 +/- 0.5 Secnd Sbva U,'
Depth 0.04 +/-O0.
24+/- 100O 2,3+/-4.0.5 59"_+ 10" -5.2 +/-. 1.0 1660+/-+_100 xauI 0" N-rn, plne azimuth 20 +/- 3kmn T 6.1, 66.77, 232.27 1.9 __1 X I10"N-m N 2.4, 21.63, 29.67 Depy 8 +/- 2aec P - 8.6, 8.07, 122.98 7.9 +/- 0.9 sec
- Sourcc paanti obtained in this stud unlen stat.ed od~zwie.
28 +/- 24km offoff .w305 (see texit) ,DO Dewey and Gordon (1984).
5.
NextEra Energy (NEE) E NER CO N Seabrook Station Figure 4-51 Flooding Hazards Reevaluation Report 1929 Grand Banks Earthquake and Subevent Characteristics
Reference:
Bent, 1995 FPL-081-PR-002 REV. 0
- ::i 9 Historical I* S coticn Margin
- 1q75* / E!!if Eaarhqu~ke I0 S1929 Eartqua * °I7°
- Epicenter " *o, ,o 600 929 3 I .7Ž!
41 N -
NextEra Energy (NEE)
Seabrook Station 0 E NER Figure 4-52 CO N Flooding Hazards Reevaluation Report Historical Earthquakes on the Scotian Margin
Reference:
Campbell et al., 2003 FPL-081-PR-002 REV. 0
1 0-01
- Morm =9.58 Mmax -9.28 10-02
..... Mmax =9.23 Mmax .8.95 EL 10-°3 1 0-04 tt 1 0-05 I
7 7.5 8 8.5 9 9.5 NextEra Energy (NEE) ENERCON Seabrook Station Flooding Hazards Reevaluation Report Earthquake Size Figure 4-53 for the Caribbean Distribution Subduction Zone FPL-081 -PR-002
Displacement (in)
a**
i*
(kin)
LA Distance from Epicenter NextEra Energy (NEE)
Seabrook Flooding Hazards Station Reevaluation Report
A Displacement (in) 14
- 0)
Vti, TY - - -
Distance from Epicenter (kin)
Next~a Enrgy NEE)Figure 4-55 SexrabEnrook Statio Hispaniola Trench Ocean Bed Deformation for Flooding Hazards Reevaluation Report Length = 700kmn, Width = 87.75 kin, Slip = 10 in.,
Depth = 8 kin, Dip = 20 degrees, Strike = N95 degrees, Rake = 90 degrees Solved with the Analytic Formulas Presented in Okada (1985)
FPL-081-PR-002 REV. 0
Next:Era Energy (NEE) ____E___ N__E___R______0 ___N Seabrook Station Figure 4-56 Flooding Hazards Reevaluation Report Location of the Marques de Pombal Fault (MPF)
Earthquake Source
Reference:
USGS, 2008 FPL-081-PR-002 REV. 0
ti* *s m a~
13 14 13 ,13
'. mI
,4*
'- s
'.4I -
NextEra Energy (NEE) EN R O Seabrook Station Figure 4-57 Flooding Hazards Reevaluation Report Maximum Tsunami Wave Amplitude (in) from the
____________________________________________________________Ma___u__sd__ arqueade PmbalFault(MPF
Reference:
USGS, 2008 FPL-081-PR-002 REV. 0
- Seabrook ~m MAVIVQ I*~ydww~
~.
- Ice JLegend Jam m p a~a gtpCo L4a~. rAG
[~Hydrologic Unit Code 12 I ~ t wt~
NextEra Energy (NEE)
Seabrook Station 0 ENERCON Flooding Hazards Reevaluation Report Figure 4-58 Ice Jam Locations Referenced to Index Number Reference. USACE, 2014 FPL-081-PR-002 REV. 0
NextEra Energy (NEE) O ENE RCON Seabrook Station Flooding Hazards Reevaluation Report Figure 4-59 Hydrostatic Pressure on Vertical Wall FPL-081-PR-002 REV. 0
NextEra Energy (NEE) O___E___ N___E___R___C ___O ___N Seabrook Station Figure 4-60 Flooding Hazards Reevaluation Report Hydrodynamic Forces
Reference:
FEMA. 2012 FPL-072-PR-002 REV. 0
I Hispaniola Seismic Event 2.5
-J 2
I' I,
1.5F /
LU 1
0.5 !f 0
-1 2 4 6 8 10 Elapsed Time (hours)
NextEra Energy (NEE)
Seabrook Station 0 ENERCON Flooding Hazards Reevaluation Report Figure 4-61 Tsunami-induced Probable Minimum Low Water at Seabrook without PMF FPL-081-PR-002 REV. 0