ML24012A042 | 16 November 2023 | FAQ 23-03 Turkey Point IE01 Proposed NRC Response | Power change |
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 21 August 2023 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | Boric Acid |
L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | 24 July 2023 | Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections | |
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | 27 March 2023 | and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | Fuel cladding |
L-2022-038, Emergency Response Data System (Eros) Changes | 17 May 2022 | Emergency Response Data System (Eros) Changes | |
L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions | 16 September 2021 | Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions | Safe Shutdown FLEX |
ML21214A043 | 2 August 2021 | SLRA June 30, 2021, Public Meeting Discussion Questions | |
ML21126A239 | 6 May 2021 | Subsequent License Renewal Application, Aging Management Supplement 2 | Boric Acid Fire Barrier Coatings Aging Management Foreign Material Exclusion Subsequent License Renewal Biofouling Through-Wall Leak Fire Protection Program |
ML21040A484 | 9 February 2021 | Fws to NRC, Point Beach Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location And/Or May Be Affected by Your Project | |
ML21040A485 | 9 February 2021 | Fws to NRC, Verification Letter for Point Beach SLR Under Programmatic Biological Opinion for Northern Long-eared Bat | |
L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification | 25 November 2019 | Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification | Hydrostatic Moisture barrier Biofouling |
L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 6 August 2019 | 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | |
ML19002A160 | 12 March 2019 | Nrc'S Record of Decision for the License Renewal Application for Seabrook Station, Unit 1 - 1-4-19 | Incorporated by reference License Renewal Environmental Justice |
NRC 2019-0002, Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | 24 January 2019 | Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | |
ML19101A455 | 14 November 2018 | Samuel Miranda Public Comments for November 15, 2018 Seabrook LRA Meeting | Probabilistic Risk Assessment Aging Management |
L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program | 21 September 2018 | Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program | Coatings |
NRC 2017-0045, Updated Final Response to NRC Generic Letter 2004-02 | 29 December 2017 | Updated Final Response to NRC Generic Letter 2004-02 | Boric Acid Mission time Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Foreign Material Exclusion Exemption Request Earthquake Fuel cladding |
SBK-L-17172, Seventh Annual Update to the License Renewal Application | 18 October 2017 | Seventh Annual Update to the License Renewal Application | Non-Destructive Examination Aging Management Moisture barrier |
L-2017-148, Special Report - Accident Monitoring Instrumentation | 11 August 2017 | Special Report - Accident Monitoring Instrumentation | Grab sample |
ML17191A412 | 10 July 2017 | NextEra Service Position Paper: Seabrook Service Water TS 3.7.4 | |
L-2017-123, Special Report - Standby Steam Generator Feedwater Pumps Inoperable | 29 June 2017 | Special Report - Standby Steam Generator Feedwater Pumps Inoperable | |
L-2017-124, Flooding Focused Evaluation Summary | 29 June 2017 | Flooding Focused Evaluation Summary | High winds Internal Flooding Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation Earthquake |
SBK-L-17099, Flooding Focused Evaluation for Impact of New Flooding Hazard Information | 28 June 2017 | Flooding Focused Evaluation for Impact of New Flooding Hazard Information | Internal Flooding Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
ML17136A322 | 19 May 2017 | Staff Assessment of Response to 10 CFR 50.54(F) Information Request - Flood-Causing Mechanism Reevaluation | Tornado Missile Hydrostatic Fukushima Dai-Ichi Frazil ice Earthquake |
ML17018A271 | 9 February 2017 | Flood Hazard Mitigation Strategies Assessment | Hydrostatic FLEX Tornado Generated Missile Fukushima Dai-Ichi Flood Hazard Mitigation Strategies Assessment |
L-2016-226, NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information | 20 December 2016 | NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information | High winds Hydrostatic FLEX Fukushima Dai-Ichi Earthquake |
NRC 2016-0041, Submittal of 10 CFR 50.59 Summary Report for 2015 | 31 August 2016 | Submittal of 10 CFR 50.59 Summary Report for 2015 | Internal Flooding Maintenance Rule Program Coast down |
SBK-L-16108, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events | 26 July 2016 | Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake Internal Flooding FLEX Tornado Generated Missile Fukushima Dai-Ichi Seismically rugged Spent Fuel Pool Instrumentation Earthquake |
ML16147A196 | 29 April 2016 | 10 CFR 50.59 Report, Revision 17 to Updated Final Safety Analysis Report, Revision 14 to Appendix R, Revision 15 to Appendix a, and Revision 146 to the Technical Requirements Manual | Safe Shutdown Spent Fuel Pool Instrumentation |
ML16117A312 | 26 April 2016 | SBK-L-16056 - NextEra Energy Seabrook, LLC - Revised Response to NRC 12/23/2015 Questions on Ceb Root Cause | Hydrostatic Finite Element Analysis |
L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis | 23 March 2016 | Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis | |
ML16013A472 | 22 January 2016 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
L-2015-313, Special Report - Accident Monitoring Instrumentation | 18 December 2015 | Special Report - Accident Monitoring Instrumentation | |
NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan | 16 December 2015 | Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan | Boric Acid Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Tornado Missile Protection Spent Fuel Pool Instrumentation Time Critical Operator Action Frazil ice B.5.b Mitigating Strategies Earthquake GOTHIC |
SBK-L-15195, Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report | 7 November 2015 | Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report | |
ML15300A140 | 3 November 2015 | Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | Fukushima Dai-Ichi |
ML15274A212 | 25 September 2015 | FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Pp. 1 Through Figure 2-1 | High winds Ultimate heat sink Tornado Missile Hydrostatic FLEX Tornado Generated Missile Fukushima Dai-Ichi Earthquake |
ML15274A214 | 25 September 2015 | FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-1 Through Figure 4-33 | |
SBK-L-15181, FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End | 25 September 2015 | FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End | Hydrostatic Earthquake |
ML15208A049 | 12 August 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML15211A593 | 3 August 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
NRC 2015-0043, Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 1007 | 20 July 2015 | Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 1007 | Coatings |
L-2015-137, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments | 22 April 2015 | Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Anticipated operational occurrence Hydrostatic Temporary Modification Missed surveillance Operability Determination Exemption Request Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Continuous fire watch Grace period Power change Coast down Unidentified leakage Power Uprate |
ML15054A037 | 23 February 2015 | U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Fire PRA Facts and Observations for Turkey Point Nuclear Generating Stations, Units 3 and 4 | Safe Shutdown Fire Barrier Thermoset |
SBK-L-14229, Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The... | 19 December 2014 | Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The... | Safe Shutdown Boric Acid Ultimate heat sink Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Earthquake Power-Operated Valves |
ML14338A554 | 4 December 2014 | NRC-2013- TN2986-NRC 2014 St. Lucie | Fukushima Dai-Ichi |
ML14338A555 | 4 December 2014 | NRC-2013-TN3079-NRC 2014 St. Lucie License Renewal | Aging Management License Renewal |
NRC 2014-0041, 10 CFR 50.59 Summary Report for 2013 | 27 August 2014 | 10 CFR 50.59 Summary Report for 2013 | Commercial Grade Dedication |
L-2014-233, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I) | 22 July 2014 | Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I) | |
ML14147A034 | 6 June 2014 | Review of the 2013 Steam Generator Tube Inspections | |