| | Start date | Site | Title |
|---|
| ML25273A345 | 30 September 2025 | 07109374 | Enclosure 2: HI-STAR 80 Responses to Requests for Additional Information (Non-Proprietary Information) |
| IR 05000333/2025041 | 6 March 2025 | FitzPatrick | 95001 Supplemental Inspection Report 05000333/2025041 and Follow-Up Assessment Letter |
| IR 05000458/2024004 | 10 February 2025 | River Bend | Integrated Inspection Report 05000458/2024004 |
| IR 05000313/2024003 | 12 November 2024 | Arkansas Nuclear | Integrated Inspection Report 05000313/2024003 and 05000368/2024003 |
| IR 05000333/2024011 | 19 September 2024 | FitzPatrick | Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation |
| IR 05000483/2024002 | 18 July 2024 | Callaway | And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 |
| 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure | 30 March 2023 | Arkansas Nuclear | License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure |
| IR 05000498/2022001 | 9 May 2022 | South Texas | Integrated Inspection Report 05000498/2022001 and 05000499/2022001 |
| IR 05000286/2020004 | 28 January 2021 | Indian Point | Integrated Inspection Report 05000286/2020004 |
| IR 05000395/2018004 | 21 February 2019 | Summer | Reissued - Virgil C. Summer Nuclear Station, Unit 1 - Nuclear Regulatory Commission Integrated Inspection Report 05000395/2018004 |