Issue date | Title | Topic | |
---|---|---|---|
AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in | 12 December 2022 | Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in | Pandemic COVID-19 |
AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report | 12 August 2021 | Form OAR-1, Owner'S Activity Report | Through Wall Leak |
ML21125A558 | 19 April 2021 | Report 2019, Commitment Change Summary, May 2019 to October 2020 | |
ML21125A539 | 19 April 2021 | Report of Changes, Tests, Experiments Pursuant to 10 CFR 50.59(d)(2), Boration System Functionality Requirement Change in Mode 4 | Shutdown Margin Open Phase Condition |
EA-21-024, Notice of Enforcement Discretion | 4 March 2021 | Notice of Enforcement Discretion for Donald C. Cook Nuclear Plant, Units 1 and 2 | Safe Shutdown Enforcement Discretion Qualified Offsite Circuit Offsite Circuit |
AEP-NRC-2020-28, CFR 72.48(d)(2) Summary Report of Completed Changes, Tests, and Experiments 1O CFR 72.48 Evaluations | 6 May 2020 | CFR 72.48(d)(2) Summary Report of Completed Changes, Tests, and Experiments 1O CFR 72.48 Evaluations | Fuel cladding |
AEP-NRC-2018-36, Notification of Initial Renewable Operating Permit | 9 May 2018 | Notification of Initial Renewable Operating Permit | Coatings |
AEP-NRC-2018-21, 30-Day Report of Changes to or Errors in an Evaluation Model | 4 May 2018 | 30-Day Report of Changes to or Errors in an Evaluation Model | Fuel cladding |
ML18026A882 | 5 February 2018 | Staff Assessment of Flooding Focused Evaluation | Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
ML17151A967 | 14 June 2017 | Flood Hazard Mitigation Strategies Assessment | Boric Acid Ultimate heat sink Hydrostatic FLEX Fukushima Dai-Ichi Flood Hazard Mitigation Strategies Assessment |
ML16127A335 | 6 May 2016 | Reactor Oversight Process Task Force FAQ Log-April 13, 2016 | Time of Discovery |
ML16113A198 | 20 April 2016 | Precursor Screening Analysis- Reject | |
AEP-NRC-2015-83, Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 1 October 2015 | Revision 1 of Final Integrated Plan Regarding March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid High winds Ultimate heat sink Anticipated operational occurrence Tornado Missile Probabilistic Risk Assessment Operating Basis Earthquake FLEX Tornado Generated Missile Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Severe Accident Management Guideline Frazil ice Earthquake Fire Protection Program |
ML15233A024 | 19 August 2015 | Transmittal of Annual Report of Loss-of-Coolant Accident Evaluation Model Changes | |
ML14181A538 | 5 June 2014 | Enclosure 5 to AEP-NRC-2014-42, Attachment #2 (NP-Attachment) of Westinghouse Letter, LTR-PL-14-22, Westinghouse Responses to NRC, Request for Additional Information on the Application for Amendment to Restore.. | |
ML14073A759 | 31 March 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Operating Basis Earthquake Fukushima Dai-Ichi Design basis earthquake Earthquake |
AEP-NRC-2014-15, 30 Day Report of Changes to or Errors in an Evaluation Model | 27 February 2014 | 30 Day Report of Changes to or Errors in an Evaluation Model | Fuel cladding |
ML12324A418 | 20 December 2012 | Review of the 2011 Refueling Outage Steam Generator Tube Inservice Inspection Results | |
AEP-NRC-2012-86, Flooding Walkdown Report in Response to the 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding for the D.C. Cook Nuclear Power Plant | 13 November 2012 | Flooding Walkdown Report in Response to the 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding for the D.C. Cook Nuclear Power Plant | Unanalyzed Condition Time of Discovery High winds Fukushima Dai-Ichi Earthquake Turbine Missile |
ML12362A076 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-268 Through C-353 | |
AEP-NRC-2012-87, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-437 Through C-486 | 5 November 2012 | Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-437 Through C-486 | |
ML12362A058 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-487 Through C-548 | |
ML12362A059 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-549 Through C-620 | |
ML12362A060 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-621 Through C-697 | |
ML12362A061 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-698 Through C-776 | |
ML12362A063 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-54 Through Page D-114 | Scaffolding |
ML12362A077 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-354 Through C-436 | |
ML12362A075 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-200 Through C-267 | |
ML12362A074 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-157 Through C-199 | |
ML12362A073 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-113 Through C-156 | |
ML12362A072 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-47 Through C-112 | |
ML12362A071 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Appendix C, Page C-46 | Safe Shutdown Unanalyzed Condition Boric Acid High Radiation Area Ultimate heat sink Probabilistic Risk Assessment Operating Basis Earthquake Arc flash Locked High Radiation Area Finite Element Analysis Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake Scaffolding Weak link |
ML12362A069 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-388 Through End | Scaffolding |
ML12362A067 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-276 Through Page D-336 | Scaffolding |
ML12362A062 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-777 Through Appendix D, Page | Scaffolding |
ML12362A064 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-115 Through Page D-175 | Boric Acid Scaffolding |
ML12362A065 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-176 Through Page D-219 | Boric Acid Scaffolding |
ML12362A066 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-220 Through Page D-275 | Scaffolding |
ML12362A068 | 5 November 2012 | Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-337 Through Page D-387 | Boric Acid Fire Barrier Scaffolding |
AEP-NRC-2012-83, Communications Assessment Requested by Nuclear Regulatory Commission Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendation 2.1, 2.3, and 9.3. | 31 October 2012 | Communications Assessment Requested by Nuclear Regulatory Commission Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulation 50.54(f) Regarding Recommendation 2.1, 2.3, and 9.3. | Health Physics Network FLEX Fukushima Dai-Ichi Earthquake |
AEP-NRC-2012-38, Response to Request for Information, 10 CFR 50.46 Report for Emergency Core Cooling System Model Change or Error Associated with Thermal Conductivity Degradation | 11 June 2012 | Response to Request for Information, 10 CFR 50.46 Report for Emergency Core Cooling System Model Change or Error Associated with Thermal Conductivity Degradation | |
AEP-NRC-2009-25, Small Break Loss-of-Coolant Accident Evaluation Model Reanalysis | 30 March 2009 | Small Break Loss-of-Coolant Accident Evaluation Model Reanalysis | Loop seal Fuel cladding |
ML080770404 | 29 February 2008 | AEP:NRC:8054-02, Attachment 5, Figure A5-41, Scotch 77 Fire Retardant Tape Test 1 Post-Test Picture to Attachment 7, Regulatory Commitments. | Mission time Hydrostatic Coatings Moisture barrier Exemption Request Scaffolding |
ML080740053 | 29 February 2008 | Response to Request for Additional Information Regarding Reanalysis of Small Break Loss-Of-Coolant Accident | Boric Acid Loop seal |
ML080770395 | 29 February 2008 | AEP:NRC:8054-02, Attachment 1, References, Through Attachment 3, Supplemental Response to GL 2004-02 and Request for Additional Information. | |
ML080720062 | 29 February 2008 | License Amendment Request to Revise Ice Condenser Licensing Basis | Safe Shutdown Probabilistic Risk Assessment Operating Basis Earthquake Design basis earthquake Earthquake |
ML080770396 | 29 February 2008 | AEP:NRC:8054-02, Attachment 3, I&M Response to Information Item 3.f.4, to NRC Information Item 3 - Conclusions. | Boric Acid Packing leak Ultimate heat sink Post Accident Monitoring Hydrostatic Coatings Locked High Radiation Area Finite Element Analysis Design basis earthquake Foreign Material Exclusion Exemption Request |
ML080770400 | 29 February 2008 | AEP:NRC:8054-02, Attachment 4, Figure A4-1, General Arrangement of Recirculation Sump to Attachment 5, Figure A5-40, Scotch 77 Fire Retardant Tape Test 1 Pre-Test Picture. | |
ML080660073 | 22 February 2008 | Cycle 21 End of Life Moderator Temperature Coefficient Limit Report | |
ML070660516 | 27 February 2007 | Steam Generator Tube Inspection Report. |