Text
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [YI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BATT-AB Equipment Class: (15) Batteries on Racks Equipment
Description:
PLANT BATTERY AB Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): AB2, 609.00 ft, 200 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
DWG 12-3476-20
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
DWG 12-3476 12 Bolts on each of 4 embedded plates underbattery frame
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-437
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y--] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BATT-AB Equipment Class: (15) Batteries on Racks Equipment
Description:
PLANT BATTERY AB
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-438
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BATT-AB Equipment Class: (15) Batteries on Racks
- ,nf I-*o, inti,rn. DI AKIT IPATTIPV An C-439
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: I-Y--]
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BATT-AB Equipment Class: (15) Batteries on Racks r, *nn DI ANIT PATTI=DV APl C-440
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F--] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PLANT BATTERY BATT-AB CONTROL PANEL Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): AB2, 613.00 ft, 205 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-441
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
PLANT BATTERY BATT-AB CONTROL PANEL
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-442
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets ipment
Description:
PLANT BATTERY BATT-AB CONTROL PANEL C-443
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EZI- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets PLANT BATTERY BATT.
C-444
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB1 Equipment Class: (16) Inverters Equipment
Description:
PLANT BATTERY BATT-AB BATTERY CHARGER #1 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): AB2, 613.00 ft, 205 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-445
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LI] N U Seismic Walkdown Checklist (SWC)
Equipment IDNo.: 2-BC-AB1 Equipment Class: (16) Inverters Equipment
Description:
PLANT BATTERY BATT-AB BATTERY CHARGER #1
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-446
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Eli N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB1 Equipment Class: (16) Inverters
~fl',.ni,~n DI AKIT DA=T ýY BATT-,
C-447
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: I-YI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB1 Equipment Class: (16) Inverters Equipment
Description:
PLANT BATTERY BATT-AB BATTERY CHARGER #1 P9190369 P9190370 C-448
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [ZII N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB1 Equipment Class: (16) Inverters
{-n*-+fl'.-rfirn. DI AKIT ATr-rI C-449
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [III N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB1 Equipment Class: (16) Inverters Equipment
Description:
PLANT BATTERY BATT-AB BATTERY CHARGER #1 P9170812 P9170813 C-450
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB2 Equipment Class: (16) Inverters Equipment
Description:
PLANT BATTERY BATT-AB CHARGER #2 Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): AB2, 613.00 ft, 205 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documentinq other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
SQUG 2-BC-AB2 REVO
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-451
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LiiI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB2 Equipment Class: (16) Inverters Equipment
Description:
PLANT BATTERY BATT-AB CHARGER #2
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: - George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-452
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LYI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB2 Equipment Class: (16) Inverters
--- 01D AKITr DA=T TF C-453
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EZI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BC-AB2 Equipment Class: (16) Inverters Equipment
Description:
PLANT BATTERY BATT-AB CHARGER #2 P9170816 P9170817 C-454
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BCTC-AB Equipment Class: (14) Distribution Panels Equipment
Description:
PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFER Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): AB2, 613.00 ft, 205 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
Could not see any anchorage - cannot open
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Unknown Could not see any anchorage- cannot open
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Unknown Could not see any anchorage- cannot open
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Unknown Could not see any anchorage - cannot open
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Unknown This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Could not see any anchorage - cannot open
- 6. Based on the above anchorage evaluations, is the anchorage free of Unknown potentially adverse seismic conditions?
Anchorage internal - CANNOT OPEN Interaction Effects C-455
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N EU]
Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BCTC-AB Equipment Class: (14) Distribution Panels Equipment
Description:
PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFER
- 7. Are soft targets free from impact by nearby equipment or structures? No Fire extinguisheron short hook behind 2-BC TC-AB - AR 2012-11669 was issued.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of No potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-456
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N EEII Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BCTC-AB Equipment Class: (14) Distribution Panels Equipment
Description:
PLANT BATTERY CHARGERS BC-AB1 AND BC-AB2 TRANSFER C-457
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LI] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLI-130 Equipment Class: (18) Instruments on Racks Equipment
Description:
STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): CON2, 612.00 ft, 70 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-458
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: I-jj N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLI-130 Equipment Class: (18) Instruments on Racks Equipment
Description:
STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-459
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLI-130 Equipment Class: (18) Instruments on Racks
%MGENERATOR ON C-460
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLI-130 Equipment Class: (18) Instruments on Racks Equipment
Description:
STEAM GENERATOR OME-3-3 WIDE RANGE LEVEL INDICATOR P9120006 P9120007 C-461
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLP-132 Equipment Class: (18) Instruments on Racks Equipment
Description:
STEAM GENERATOR OME-3-1 CHANNEL III REACTOR Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): CON2, 612.00 ft, 72 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-462
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYiII N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLP-132 Equipment Class: (18) Instruments on Racks Equipment
Description:
STEAM GENERATOR OME-3-1 CHANNEL III REACTOR
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Found missing bolt mounted panel 2-CS-612W with angle (hanging off offloor) see pictures Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-463
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYl] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLP-132 Equipment Class: (18) Instruments on Racks 13-n+,-r;^;n IZTI[:AIKA r-P.I:KlI ATnD MIA C-464
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: r-YI] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLP-132 Equipment Class: (18) Instruments on Racks Equipment
Description:
STEAM GENERATOR OME-3-1 CHANNEL III REACTOR P9120046 P9120047 C-465
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLP-132 Equipment Class: (18) Instruments on Racks Pniiinmiant I'lt-rnininn .QTI5:AI, (r*KIJI:PATCnP CIMIFAr..1 r-WAMhJKI III PPAr-TflP C-466
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-BLP-132 Equipment Class: (18) Instruments on Racks Equipment
Description:
STEAM GENERATOR OME-3-1 CHANNEL III REACTOR P9120056 P9120057 C-467
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCV-AB Equipment Class: (14) Distribution Panels Equipment
Description:
250VDC TRAIN 'B' CRITICAL SOLENOID VALVES Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): AB2, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
SQUG 2-CCV-AB REVO
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable Unistrutmounted and welded to panel which is welded to embedded plate
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-468
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY1] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCV-AB Equipment Class: (14) Distribution Panels Equipment
Description:
250VDC TRAIN 'B' CRITICAL SOLENOID VALVES
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles - Ceiling tiles OK perDWG 12-4070
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-469
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Lull N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCV-AB Equipment Class: (14) Distribution Panels Eauioment DescriDtion: 25OVDC TRAIN 'B' CRITICAL SOLENOID VALVES Ai-,
P9181079 C-470
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EZII N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCV-AB Equipment Class: (14) Distribution Panels Equipment
Description:
25OVDC TRAIN 'B' CRITICAL SOLENOID VALVES P9181081 P9181082
,111MVIIIII(Ow I
E lf fl:
I All I Cl" C1 Tfflý 11 t -4 #A#
,lrtl 'Fil"It C-471
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCV-AB Equipment Class: (14) Distribution Panels ii C-472
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCV-AB Equipment Class: (14) Distribution Panels I:nir r~nen Ila rinflnn, "9r*\ll'ir_ TI:PAIKI 'T' (P ITIrAI (ZrI PI::lklr31r \/AI \/1:::_
P9181090 C-473
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FYI] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCV-AB Equipment Class: (14) Distribution Panels TRAIN 'B' CRITICAl C-474
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCV-AB Equipment Class: (14) Distribution Panels "4 I.P *l'*i I IJ/--%L C-475
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
COMPONENT COOLING WATER CONTROL PANEL Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): AB2, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
SQUG 2-CCW REVO
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable Welded to embedded plate
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-476
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
COMPONENT COOLING WATER CONTROL PANEL
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles - Ceiling tiles OK per DWG 12-4070
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-477
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCW Equipment Class: (20) Instrumentation and Control Panels and Cabinets
- n
-*mwn ,rinfirnn r'nlAP 1IMKIT (*r"lC" I~I(* WATI=P (Cf.JTICNI PA NI'FI C-478
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CCW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
COMPONENT COOLING WATER CONTROL PANEL C-479
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Y-] N L Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CFI-420 Equipment Class: (18) Instruments on Racks Equipment
Description:
COMPONENT COOLING WATER TO WEST COMPONENT COOLING Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): AB2, 609.00 ft, 609 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-480
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EYIJ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CFI-420 Equipment Class: (18) Instruments on Racks Equipment
Description:
COMPONENT COOLING WATER TO WEST COMPONENT COOLING
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-481
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: 71-1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CFI-420 Equipment Class: (18) Instruments on Racks i:-;- -fnz~n n. r'~~rniRADNMIPKMT rr*n l I(' IMP AIATI=P W) \A/IF=_T rr'*IA4PrhJI:MT r-r('*I 1IIf('
C-482
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-Z N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CFI-420 Equipment Class: (18) Instruments on Racks i- -fn
- rarrntnn IADnI9M:KIMT (-n lI Wit\,
(VATER TO WEST COMPONENT COOLING C-483
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [YII N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CFI-429 Equipment Class: (18) Instruments on Racks EauiDment DescriDtion: WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLING Project: DC Cook 2 SWEL Location (Bldg, Elev, Room/Area): AB2, 633.00 ft, 633 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
FIGURE 6-1 Outline Dimensional Drawing 0224.0901.3 Model 224 DPU, Yoke or Wall Mounting
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Interaction Effects C-484
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CFI-429 Equipment Class: (18) Instruments on Racks Equipment
Description:
WEST RHR HEAT EXCHANGER HE-17W COMPONENT COOLING
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
Cable trays lightly loaded
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-485
DC Cook Unit 1 & Unit 2 SD-1 21023-001 Rev. 0, 11/05/12 Status: EZI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2-CFI-429 Equipment Class: (18) Instruments on Racks ipment
Description:
WEST RHR HEAT EXCHANGER C-486