Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix D, Page D-388 Through End
ML12362A069
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/05/2012
From: Stoeva N
Indiana Michigan Power Co, Stevenson & Associates
To:
Office of Nuclear Reactor Regulation, American Electric Power, Indiana Michigan Power Co
References
AEP-NRC-2012-87 SD-121023-001, Rev 0
Download: ML12362A069 (50)


Text

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: IY-j N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 38 -AB2, EL. 586', Room 24 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes D-388 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FVYj N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 38 -AB2, EL. 586', Room 24 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments AREA ONLY 30' OF COMPONENT Evaluated by: George G Thomas I3 4 Neda Stoeva Date: 10/18/12 10/18/12 D-389 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LYI N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 38 -AB2, EL. 586', Room 24 P9180896 P9180897 D-390 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: _YI N U Area Walk-By Checklist (AWC)Location (Bida. Elev. Room/Area):

Area 38 -AB2. EL. 586'. Room 24 D-391 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y FNl] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 39 -ABI, EL. 587', Room 35 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial No interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Fire extinguishers on short hooks -AR 2012-11669 was issued. Block wall -OK per DWG 12-3253 and 12-3254 Section D-4.5. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause flooding or spray in the area?1-TK-36 is right by panel but well supported 6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-392 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y i-N-] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 39 -AB1, EL. 587', Room 35 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Georqe G Thomas Evaluated by: Date: 10/18/12 6ýý4_Neda Stoeva 10/18/12 D-393 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y r-T U Area Walk-By Checklist (AWC)Area 39 -ABI, EL. 587', Room 35 D-394 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y U Area Walk-By Checklist (AWC)Area 39 -AB1, EL. 587', Room 35 D-395 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y L[- U Area Walk-By Checklist (AWC)Area 39 -AB1, EL. 587', Room 35 D-396 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y U Area Walk-By Checklist (AWC)!a 39 -D-397 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y L[-I U Area Walk-By Checklist (AWC)D-398 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y LNT] U Area Walk-By Checklist (AWC)Area 39- ABI, EL D-399 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y [] U Area Walk-By Checklist (AWC)Area 39 -ABI, EL. 587', Room 35 P9 181051 D-400 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [Y] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 40 -AB2, EL. 633', Room 9 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Yes 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?Yes 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Scaffold in area -above safety discharge tail pipes -OK Yes D-401 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 40 -AB2, EL. 633', Room 9 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Evaluated by: George G Thomas Neda Stoeva Date: 10/18/12 10/18/12 D-402 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Area Walk-By Checklist (AWC)Area 40 -AB2, EL. 633', Room 9 D-403 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-I N U Area Walk-By Checklist (AWC)140-AB2, EL D-404 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LII N U Area Walk-By Checklist (AWC)Area 40 -AB2, EL. 633', Room 9 D-405 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: lY-] N U Area Walk-By Checklist (AWC)I nrmtinnn ( I :n l Inig P a 40 -A D-406 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Area Walk-By Checklist (AWC)I rn',tirnn IRd I: 1ha PInnm/Arcm-Area 40 -AB2, EL.D-407 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y L[-1 U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 41 -TB2, EL. 591', Room 49 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

Strainer 2-PW-245-2 Support -lack of thread engagement on 2 bolts on front saddle -has been evaluated by engineering (tag) and is OK by DOC#01019028 2. Does anchorage of equipment in the area appear to be free of significant No degraded conditions?

Support above valve 2-WMO-753 for control air tubing not well anchored, unistrut coming off the wall and does not have top bolt (does not look like it ever did) -AR 2012-11936 was issued.3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial Yes interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

5. Does it appear that the area is free of potentially adverse seismic interactions No that could cause flooding or spray in the area?Approximately 1.5" threaded fire protection pressurized pipe is rod hung and can leak and/or impact other supports in area and may break -AR 2012-11738
6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions Yes associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-408 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y LNj] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 41 -TB2, EL. 591', Room 49 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Georqe G Thomas Evaluated by: Date: 10/18/12*_4_Neda Stoeva 10/18/12 D-409 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y [NI U Area Walk-By Checklist (AWC)Area 41 -TB2, EL. 591', Room 49 D-410 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y F1] U Area Walk-By Checklist (AWC)41-D-411 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y NI- U Area Walk-By Checklist (AWC)D-412 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y E-N-] U Area Walk-By Checklist (AWC)41 -T D-413 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: L N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 42 -TB2, EL. 591', Room 51 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes Yes Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?Yes 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Yes D-414 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [YI N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 42 -TB2, EL. 591', Room 51 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Comments Evaluated by: Evaluated by: G Thomas 6ý4 -Neda Stoeva Date: 10/18/12 10/18/12 D-415 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: jjY] N U Area Walk-By Checklist (AWC)I nrtntinn [Plrin Iolw IPnnm/Aro2V Area 42 -TB2, EL. 591', Room 51 D-416 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EZ-I N U Area Walk-By Checklist (AWC)Area 42 -TB2, EL. 591', Room 51 D-417 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY- N U Area Walk-By Checklist (AWC)I '-fi-~ (Pldr in,~t, ptnmIA Area 42 -TB2, EL. 591', Room 51 D-418 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-] N U Area Walk-By Checklist (AWC)Location (Bido. Elev. Room/Area):

Area 42 -TB2. EL. 591'. Room 51 D-419 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y L-J U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 43 -SHI, EL. 591', Room 670 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially Yes adverse seismic conditions (if visible without necessarily opening cabinets)?

OK for a non-safety area 2. Does anchorage of equipment in the area appear to be free of significant Yes degraded conditions?

Some minor rust on most components

3. Based on a visual inspection from the floor, do the cable/conduit raceways and Yes HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?OK for an area that is NOT safety related 4. Does it appear that the area is free of potentially adverse seismic spatial No interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Not a safety related area -AR 2012-11762 and AR 2012-11767 were issued.5. Does it appear that the area is free of potentially adverse seismic interactions No that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions Yes that could cause a fire in the area?7. Does it appear that the area is free of potentially adverse seismic interactions No associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Not safety related area -AR 2012-11762 and AR 2012-11767 were issued.Fire extinguishers on short hooks.D-420 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y LI] U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 43 -SHI, EL. 591', Room 670 8. Have you looked for and found no other seismic conditions that could No adversely affect the safety functions of the equipment in the area?Not a safety related area -AR 2012-11762 and AR 2012-11767 were issued.Comments Evaluated by: Evlute George G Thomas CkiýK4 Neda Stoeva Date: 10/18/12 10/18/12 D-421 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y NI-N] U Area Walk-By Checklist (AWC)Area 43 -SHI, EL. 591', Room 670 D-422 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y EN- U Area Walk-By Checklist (AWC)Area 43 -SHI, EL. 591', Room 670 D-423 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: T N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 44 -SH2, EL. 591', Room 136 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.Additional space is provided at the end of this checklist for documenting other comments.1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Junction box U bolted (3places) to guard rail of platform 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?

Yes Yes Yes 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Yes 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?Yes Yes Yes 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

D-424 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Area Walk-By Checklist (AWC)Location (Bldg, Elev, Room/Area):

Area 44 -SH2, EL. 591', Room 136 8. Have you looked for and found no other seismic conditions that could Yes adversely affect the safety functions of the equipment in the area?Twisted angle on top of instrument rack seems to serve no purpose -OK Comments'., "Georqe G Thomas Evaluated by: Date: 10/18/12 Neda Stoeva 10/18/12 D-425 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LI-1 N U Area Walk-By Checklist (AWC)Area 44- SH2, EL. 591', Room 136 D-426 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [] N U Area Walk-By Checklist (AWC)I r^ý,+;^ln 9=lý/ Pnnml/b Area 44- SH2, EL. 591', Room 136 D-427 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Area Walk-By Checklist (AWC)I Fo, Pnriml/h Area 44 -SH2, EL. 591', Room 136 D-428 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 E Plan for Future Seismic Walkdown of Inaccessible Equipment There are 16 items have been deferred in DCCNP1 and DCCNP2 each. Seven and six of these items were located in containment for DCCNP1 and DCCNP2 inside the Shield Wall and could not be included in the walkdown when the units were at power. There were eight and nine electrical equipment items that could not be opened during the walkdown due to safety reasons.The remaining items (one in each unit) were in enclosures that also could not be opened for safety reasons in the Auxiliary Building.

The electrical equipment items will be inspected at the next service outage for this equipment.

The items in containment and the two items in enclosures in Auxiliary Building will be inspected during the next RFO for the respective unit.Table E-1 and E2 summarizes the reasons each item is inaccessible during normal plant operation.

There are also three Area Walk-Bys associated with the items in Containment.

It is noted that all accessible areas of the plant included Area Walk-bys including the rooms containing inaccessible electrical equipment.

Table E-1. Summary of Inaccessible Equipment for DCCNP1 SWELl Component Description Building and Plan for Future Reason for List ID Location Walkdown Inaccessibility Item #SOUTH SAFETY Walkdown to be Electrical UINJECTION PUMP PP- AE1, EL. performed next Equipment 8 1-T1 1A INJECTIN S PUMPL PP- 9, EL. 1 scheduled could not be 26S SUPPLY 609', Rm. 140 outage for opened for BREAKER equipment.

safety reasons.Walkdown to be Electrical 1 AZ-BC ESSENTIAL SERVICE performed next Equipment 3B(l) WATER TO TURBINE AB1, EL. 609' scheduled could not be DRIVEN outage for opened for equipment.

safety reasons.Walkdown to be Electrical 600VAC MOTOR performed next Equipment 10 1-AZ-BC CONTROL CENTER AB1, EL. 609' scheduled could not be AZ-BC outage for opened for equipment.

safety reasons.Walkdown to be Electrical B 600VAC BUS 11B A131, EL. performed next Equipment 11 1 -11BV BUS) ITCHG R B 6A9i, EL. 204scheduled could not be SWITCHGEAR 609', Rm. 204ouaefrpndfr outage for opened for equipment.

safety reasons.E-i DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Table E-1. Summary of Inaccessible Equipment for DCCNP1 SWELl Component Description Building and Plan for Future Reason for List ID Location Walkdown Inaccessibility Item #Walkdown to be Item in Primary PRESSURIZER performed Containment.

RELIEF VALVE NRV- CON1, EL. during next Walkdown 151 UPSTREAM 650', Rm. 81 RFO for cannot be SHUTOFF DCCNP1. performed with unit at power.Walkdown to be Item in Primary PRESSURIZER TRAIN performed Containment.

44 1-NRV-151

'T'PRESSURE CON1, EL. during next Walkdown RELIEF VALVE 650', Rm. 81 RFO for cannot be DCCNP1. performed with unit at power.Walkdown to be Item in Primary PRESSURIZER TRAIN performed Containment.

45 T-NRV-152

'B'PRESSURE CON1, EL. during next Walkdown RELIEF VALVE 650', Rm. 81 RFO for cannot be DCCNP1. performed with unit at power.STEAM GENERATOR Walkdown to be Equipment#2 BLOWDOWN A11, EL. performed enclosure 58 1-XSO-321 CONTAINMENT 591', Rm. 29 during next could not be ISOLATION RFO for opened for DCCNP1. safety reasons.Walkdown to be Item in Primary REACTOR COOLANT performed Containment.

60 1-NTR-230 LOOP #3 COLD LEG CON1, EL. during next Walkdown WIDE RANGE 617', Rm. 62 RFO for cannot be DCCNP1. performed with unit at power.Walkdown to be Item in Primary REACTOR COOLANT performed Containment.

61 1-NTR-240 LOOP #4 COLD LEG CON1, EL. during next Walkdown WIDE RANGE 617', Rm. 63 RFO for cannot be DCCNP1. performed with unit at power.LOWER Walkdown to be Item in Primary CONTAINMENT performed Containment.

67 1-NLI-320 TRAIN'B'WATER CON1, EL. during next Walkdown LEVEL INDICATOR 612', Rm. 69 RFO for cannot be TRANSMITTER DCCNP1. performed with unit at power.E-2 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Table E-1. Summary of Inaccessible Equipment for DCCNPI SWELl Component Description Building and Plan for Future Reason for List ID Location Walkdown Inaccessibility Item #Walkdown to be Equipment 1-BCTC- CHARGERS BC-AB1 AB1, EL. performed next could not be 80 AB(1 2) AND BC-AB2 613', Rm. 205 scheduled opened for TRANSFER outage for safety reasons.equipment.

Walkdown to be Equipment 250VDC AB1, EL. performed next could not be 82 1-MCAB('2) DISTRIBUTION ABI, scheduled opened for PANEL MCAB 609, Rm 200 outage for safety reasons.equipment.

Walkdown to be Equipment 8 2) 250VDC TRAIN 'B' AB1, EL. performed next could not be 83 1"TDAB(1)

TRANSFER CABINET 609', Rm. 200 scheduled opened for outage for safety reasons.equipment.

Walkdown to be Equipment WEST ESSENTIALpeorenetcudotb 89 1-T11A5(1) SERVICE WATER AB3, EL. performed next could not be 89 1-11A() PUMP PP-7W 611', Rm. 142 scheduled opened for SUPPLY outage for safety reasons.equipment.

EXCESS LETDOWN Walkdown to be Item in Primary HEAT EXCHANGER performed Containment.

100 1-QRV-170 HE-13 OUTLET CON1, EL. during next Walkdown PRESSURE 612', Rm. 66 RFO for cannot be CONTROL VALVE DCCNP1. performed with unit at power.Notes: (1) These equipment items require anchorage documentation verification.

(2) These items have Seismic Walkdown Checklists (SWCs) in Appendix C.The interaction questions were answered.E-3 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Table E-2. Summary of Inaccessible Equipment for DCCNP2 SWELl Component Description Building and Plan for Future Reason for List ID Location Walkdown Inaccessibility Item #Walkdown to be Electrical 600VAC MOTOR performed next Equipment 6 2-21C(1) CONTROL CENTER AB2, EL. scheduled could not be EZC-A SUPPLY 609', Rm. 204 outage for opened for BREAKER equipment.

safety reasons.Walkdown to be Electrical WEST ESSENTIAL performed next Equipment 8 2-T21A5(1)

SERVICE WATER AB2, EL. scheduled could not be PUMP PP-7W 609', Rm. 140 outage for opened for SUPPLY equipment.

safety reasons.Walkdown to be Electrical 600VAC MOTOR performed next Equipment 9 2-21C6(1) CONTROL CENTER AB2, EL. scheduled could not be ABD-A SUPPLY 609', Rm. 204 outage for opened for BREAKER equipment.

safety reasons.Walkdown to be Electrical WEST MOTOR performed next Equipment 10 2-T21A2(1.2)

DRIVEN AUXILIARY AB2, EL. scheduled could not be FEEDWATER PUMP 609', Rm. 140 outage for opened for PP-3W equipment.

safety reasons.Walkdown to be Electrical 600V MOTOR performed next Equipment CONTROL CENTER AB2, EL. scheduled could not be ABD-B, ELSC & 609', Rm. 204 outage for opened for ELSCX equipment.

safety reasons.Walkdown to be Electrical 600V BUS 21A performed next Equipment 31 2-TR21A(l)

SUPPLY AB2, EL. scheduled could not be TRANSFORMER 609', Rm. 140 outage for opened for equipment.

safety reasons.Walkdown to be Item in Primary PRESSURIZER performed Containment.

40 2-NMO-151 RELIEF VALVE NRV- CON2, EL. during next Walkdown 151 UPSTREAM 650', Rm. 81 RFO for cannot be SHUTOFF DCCNP2. performed with unit at power.E-4 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Table E-2. Summary of Inaccessible Equipment for DCCNP2 SWELl Component Description Building and Plan for Future Reason for List ID Location Walkdown Inaccessibility Item #Walkdown to be Item in Primary PRESSURIZER performed Containment.

2-NRV-151 TRAIN 'B' CON2, EL. during next Walkdown PRESSURE RELIEF 650', Rm. 81 RFO for cannot be VALVE DCCNP2. performed with unit at power.Walkdown to be Item in Primary PRESSURIZER performed Containment.

45 2-NRV-152 TRAIN 'B' CON2, EL. during next Walkdown PRESSURE RELIEF 650', Rm. 81 RFO for cannot be VALVE DCCNP2. performed with unit at power.STEAM Walkdown to be Equipment GENERATOR

  1. 2 performed enclosure 58 2-XSO-321 BLOWDOWN AB2, EL. during next could not be 5COBOWDOWNT 591', Rm. 29 RFO for opened for ISOLATION DCCNP1. safety reasons.Walkdown to be Item in Primary REACTOR COOLANT performed Containment.

60 2-NTR-230 LOOP #3 COLD LEG CON2, EL. during next Walkdown WIDE RANGE 617', Rm. 62 RFO for cannot be DCCNP2. performed with unit at power.Walkdown to be Item in Primary REACTOR COOLANT performed Containment.

61 2-NTR-240 LOOP #4 COLD LEG CON2, EL. during next Walkdown WIDE RANGE 617', Rm. 63 RFO for cannot be DCCNP2. performed with unit at power.LOWER Walkdown to be Item in Primary CONTAINMENT performed Containment.

67 2-NLI-320(1) TRAIN 'B' WATER CON2, EL. during next Walkdown 617', Rm. 60 RFO for cannot be TRANSMITTER DCCNP2. performed with unit at power.Walkdown to be Electrical PLANT BATTERY performed next Equipment 2-BCTC- CHARGERS BC-AB1 AB2, EL. scheduled could not be 80 AB(2) AND BC-AB2 613', Rm. 205 outage for opened for TRANSFER equipment.

safety reasons.E-5 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Table E-2. Summary of Inaccessible Equipment for DCCNP2 SWELl Component Description Building and Plan for Future Reason for List ID Location Walkdown Inaccessibility Item #Walkdown to be Electrical 250VDC performed next Equipment 82 2-MCAB(2)

DISTRIBUTION AB2, EL. scheduled could not be PANEL MCAB 609', Rm. 200 outage for opened for equipment.

safety reasons.Walkdown to be Electrical performed next Equipment 83 2-TDAB(1'2) 250VDC TRAIN 'B' AB2, EL. scheduled could not be TRANSFER CABINET 609', Rm. 200 outage for opened for equipment.

safety reasons.Notes: (1) These equipment items require anchorage documentation verification.

(2) These items have Seismic Walkdown Checklists (SWCs) in Appendix C. The interaction questions were answered.E-6 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 F Peer Review Checklist Peer Review Checklist for SWEL -D. C. Cook Unit I and Unit 2 Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings.

Additional space is provided at the end of this checklist for documenting other comments.1. Were the five safety functions adequately represented in the SWELl selection?

YN NEI The basis for how selection of equipment for the SWEL I is described in the SWEL Scope Development document and the basis includes a description that indicates that the 5 safety functions are represented.

However, the information provided on the SWEL does not include the safety function(s) supported by each item.2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:

a. Various types of systems?b. Major new and replacement equipment?

The basis for how selection of equipment for the SWEL I is described in the SWEL Scope Development document and the basis includes a description that indicates that modified and new equipment is considered.

However, the information provided on the SWEL does not indicate if the equipment is new or has been modified.c. Various types of equipment?

d. Various environments?

It appears that the equipment on the SWEL is located in various environments.

Although not specifically required by the EPRI TR 1025286, it appears that equipment in the Drywell is not represented.

YE NEI YO NEI YM N E Y~N N F-1 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Peer Review Checklist for SWEL -D. C. Cook Unit I and Unit 2 e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? YED NEI f. Were risk insights considered in the development of SWEL 1? YZ NEl 3. For SWEL 2: a. Were spent fuel pool related items considered, and if applicable included in YO NEI SWEL 2?b. Was an appropriate justification documented for spent fuel pool related items not YE NEI included in SWEL 2?4. Provide any other comments related to the peer review of the SWELs.None.5. Have all peer review comments been adequately addressed in the final SWEL? YO" N[W~4~4{~aA4~-'-

K{a?~A~Peer Reviewer #1: T K, Ram Peer Reviewer #2: Walter Dic)rdje vic_Date: 11/05/2012 Date: 11/05/2012

........ j-F-2 Enclosure 3 to AEP-NRC-2012-87 Regulatory Commitments The following table identifies those actions committed to by Indiana Michigan Power Company (I&M) in this document.

Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check One) SCHEDULED COMPLETION COMMITMENT ONE- DATE TIME CONTINUING (If Required)ACTION COMPLIANCE Cook Nuclear Plant (CNP) Unit 1 -Prior to the Complete seismic walkdowns and area completion of the walkbys for components listed in Table E- X Unit 1 Cycle 25 1 of the Seismic Walkdown report. refueling outage fthSesiWldnreot(Spring of 2013)CNP Unit 2 -Complete seismic Prior to the walkdowns and area walkbys for completion of the remaining components listed in Table E-2 X Unit 2 Cycle 21 of the Seismic Walkdown report. refueling outage othSimcakoneot(Fall of 2013)Update the seismic walkdown report and Ninety (90) days provide it to the Nuclear Regulatory X after the completion Commission (NRC). of the Unit 2 Cycle 21 refueling outage-I