ML23303A0666 November 2023October 2023 Environmental Scoping Meetings Re Perry Nuclear Power Plant License Renewal Application Meeting Summary MemoLicense Renewal
ML23129A6064 May 2023Special Inspection Team Charters to Evaluate the Circumstances Surrounding the Ground Settling at the Davis-Besse Nuclear Power Station
ML23044A36615 February 2023Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III
ML22019A26527 January 2022Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design BSafe Shutdown
Loop seal
Mission time
Coatings
Foreign Material Exclusion
ML21096A22830 March 2021FEMA Disapproval of Davis-Besse Exercise Exemption
ML20163A62715 June 2020Summary of Public Telecon with Energy Harbor on License Renewal for Perry Nuclear PlantExemption Request
ML20080J78928 April 2020Relief Requests 2 TYP-3-B3.110-1, 2-TYP-3-C2.21-1, 2-TYP-3-C1.30-1, and 2-TYP-3-RA-1 Regarding Weld Examination Coverage for the Third Inservice Inspection IntervalVT-2
Incorporated by reference
Through-Wall Leak
ML19182A35623 July 2019Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019Fukushima Dai-Ichi
ML19162A0307 June 2019Memorandum to File Environmental Assessment and Finding of No Significant Impact for Firstenergy Nuclear Operating Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) and 72.30(C) for Perry ISFSIDecommissioning Funding Plan
ML19161A3307 June 2019Memo to File Environmental Assessment and Finding of No Significant Impact for First Energy Nuclear Operating Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) and 72.30(C) for Beaver Valley ISFSIDecommissioning Funding Plan
ML19162A0107 June 2019Memorandum to File Environmental Assessment and Finding of No Significant Impact for Firstenergy Nuclear Operating Company'S Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) and 72.30(C) for Davis Besse ISFSIDecommissioning Funding Plan
ML19085A5131 April 2019Review of Updated Final Safety Analysis Report, Revision 23
ML18254A3981 October 2018Fleet Nuclear Power Plant Adoption of Technical Specifications Task Force Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement (EPID No. 05000440/L-2018-LLA-0167)Anticipated operational occurrence
Fuel cladding
Power change
ML18099A0816 April 2018Bv Annual Assessment Meeting Summary and Attendance List 2018
ML18067A1139 March 2018Notice of Public Meeting on March 27, 2018Open House
ML17061A2077 March 2017Notice of Meeting with Firstenergy Nuclear Operating Co., to Discuss Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 and 2 for 2016 as Described in the Annual Assessment Letter Dated March 01, 2017Open House
ML17004A2955 January 2017Safety Evaluation Report- Application for Amendment Perry Nuclear Power PlantHydrostatic
ML16224A76520 October 2016Review of Updated Final Safety Analysis Report, Revision 22
ML16180A13522 June 2016Summary of Open House Public Meeting to Discuss NRC Activities, Nuclear Power Issues, and 2015 End-of-Cycle Performance Assessment of Perry Nuclear Power PlantOpen House
ML16088A20528 March 2016Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage InstallationsDecommissioning Funding Plan
ML16088A20428 March 2016Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template)Decommissioning Funding Plan
ML15205A1697 August 2015ACRS Review of the Davis Besse Nuclear Plant LRA - Transmittal of the SserBoric Acid
Coatings
Nondestructive Examination
Incorporated by reference
Aging Management
Tornado Missile Protection
Foreign Material Exclusion
Moisture barrier
Maintenance Rule Program
EVT-1
Dissimilar Metal Weld
Scaffolding
ML15201A48120 July 2015Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2
ML15182A19116 July 2015Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation
ML15135A29821 May 2015Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station,
ML15089A16427 April 2015Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis
ML15110A40623 April 2015Notice of Closed Meeting with FENOC on Beaver Valley
ML15016A43920 January 2015Draft Request for Additional Information
ML14296A68910 November 2014Summary of September 18, 2014, Meeting with Firstenergy Nuclear Operating Company to Discuss Alternative Source Term Implementation as a Result of Fuel Change
ML14195A07414 July 2014Memoranda to S. Wastler Technical Assistance Request - Review of Physical Security Plan for the Beaver Valley Power Station (TAC No. L24936)
IR 05000334/20004128 July 2014NRC Staff'S Spot-Check Review of First Energy Nuclear Operating Company'S Ownership Interest in Beaver Valley, Units 1 and 2, Perry, and Davis-Besse, Docket No. 05000334, 05000412, 05000440, and 05000346, on June 10, 2014-Finding of No Pote
ML14189A1198 July 2014NRC Staff'S Toledo Edison Spot-Check Review of Toledo Edison Company'S Ownership Interest in Beaver Valley Nuclear Power Station, Unit 2, Docket No. 50000412, on June 10, 2014-Finding of No Potential Issues
ML14189A1218 July 2014NRC Staff'S Spot-Check Review of Ohio Edison'S Ownership Interest in Beaver Valley, Unit 2 and Perry, Finding of No Potential Issues
ML14161A14817 June 2014Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Beaver Valley Power Station, Units 1 and 2
ML14099A4646 May 2014Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1
ML13280A90621 October 2013Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Voluntary Risk Informed Fire Protection Amendment for Davis-Besse
ML13282A6469 October 2013Notice of Cancelled Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Proposed Dose Calculations for Fuel
ML13186A0388 July 2013Electronic Transmission, Draft Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report
ML13142A5122 July 2013Summary of Telephone Conference Call Held on May 21, 2013, Between NRC and Firstenergy Nuclear Operating Company, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA
ML13179A3181 July 2013Electronic Transmission, Draft Request for Additional Information Regarding 2012 Steam Generator Tube Inspection Reports
ML13171A29213 June 2013LTR-13-0540 - Bill Hawkins and Vinod Arora Email San Onofre Nuclear Generating Station (SONGS) Lessons Learn for Davis-BesseBoric Acid
Probabilistic Risk Assessment
Nondestructive Examination
Chernobyl
Fuel cladding
Pressure Boundary Leakage
ML13154A4444 June 2013Rai'S Following Ifib Analysis of Fenoc'S 2013 Decommissioning Funding Status Report for Davis-Besse and Perry
ML13154A4394 June 2013Rai'S Following Ifib Analysis of Fenoc'S 2013 Decommissioning Funding Status Report for Beaver Valley 1 and 2
ML13004A4034 January 2013Memo - Request for a Deviation from the Reactor Oversight Process Action Matrix for Perry Nuclear Power Plant
ML12265A2032 October 2012Notice of Meeting with First Energy Nuclear Operating Company, to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule
ML12263A42020 September 2012Electronic Transmission, Draft Request for Additional Information Regarding Revision of Regulatory Commitment for Submittal of 10 CFR 50.48(c) License Amendment RequestEnforcement Discretion
Probabilistic Risk Assessment
ML12207A56726 July 2012Electronic Transmission, Draft Request for Additional Information Regarding Proposed Emergency Action Level Scheme Change Using Nuclear Energy Institute 99-01, Revision 5Safe Shutdown
ML12199A20717 July 2012Public Meeting Notice to Discuss the 2011 End-of-Cycle Performance Assessment
ML12194A56216 July 2012Notice of Forthcoming Pre-Submittal Meeting with Firstenergy Nuclear Operating Company, to Discuss Upcoming Beaver Valley Power Station National Fire Protection Association Standard 805 (NFPA 805) Submittal
ML12158A4008 June 20126/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC)