Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211K861 | 1 September 1999 | Informs That There Has Been Some Confusion Re Recently Issued ODCM Generic Section Rev Which Needs to Be Clarified. Clarifications Are Listed | |
ML20210P136 | 4 August 1999 | Notification of 990817 Meeting with Util in Rockville, Maryland to Discuss Status of Licensing Actions Submitted by Comm Ed & Plan for Proposed Licensing Workshop | |
ML20206U272 | 13 May 1999 | Revised Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Plant | |
ML20206E933 | 3 May 1999 | Notification of 990524 Meeting with Commonwealth Edison,Co in Rockville,Md to Discuss Technical Issues Related to Proposed re-rack of SFPs at Braidwood Station & Byron Station | |
ML20206U280 | 28 April 1999 | Notification of 990527 Meeting with Util in Lisle,Il to Discuss Results of Licensee Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Byron Station | |
ML20155G466 | 3 November 1998 | Forwards Exam Repts 50-454/98-301(OL) & 50-455/98-301(OL) Administered on 980914-22 with as-given Written Exam Attached for Processing Through Nudocs & Distribution to NRC Staff,Including NRC PDR | |
ML20155F629 | 3 November 1998 | Forwards Facility Outline & Initial Exam Submittal for Operator Licensing Exam Administered Wk of 980914 | High Radiation Area Locked High Radiation Area Job Performance Measure Scaffolding |
ML20151V295 | 2 September 1998 | Informs That Braidwood Station Concurs with Encl Proposed 980904 Util Response to NRC Re IPEEE | |
ML20197C804 | 2 September 1998 | Informs That Braidwood Station Concurs with Proposed Encl Response to NRC Re RPV Integrity at Braidwood & Byron Stations | |
ML20197C830 | 1 September 1998 | Informs That Rev 2 to Calculation BYR98-109/BRW-98-339-E Has Been Reviewed & Found Acceptable for Transmittal to Nrc. Draft Util Ltr Re Thermo-Lag Ampacity Derating Factor Calculation,Encl | Fire Barrier |
ML20237D433 | 21 August 1998 | Notification of 980903 & 04 Meetings W/Util in Rockville,Md to Discuss Technical Issues Related to Byron & Braidwood Improved Std TSs Conversion,Including Section 3.3,beyond Scope Issues,Closeout Packages & Amends to Current TSs | |
ML20249A223 | 12 June 1998 | Notification of 980625-26 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Byron & Braidwood Improved Std TSs Conversion | |
ML20217E388 | 23 April 1998 | Notification of 980506 & 07 Meetings W/Util in Rockville,Md to Discuss Technical Issues Re Plants Improved STS Conversion | |
ML20217H542 | 31 March 1998 | Discusses Completion of SG Replacement Proj at Plant,Unit 1. Plant Resumed Power Operation on 980308 | |
ML20216H340 | 17 March 1998 | Notification of 980331-0402 Meeting W/Util in Rockville,Md to Discuss Reviewer Comments on Byron & Braidwood Improved Std TS Submittal | |
ML20216H697 | 17 March 1998 | Notification of 980326 Meeting W/Commonwealth Edison Co in Lisle,Il to Discuss Comed Request to Consolidate near-site Emergency Operations Facility Into Single Central EOF | |
ML20203G855 | 23 February 1998 | Notification of 980305 Meeting W/Util in Rockville,Md to Discuss Status of Byron & Braidwood Licensing Issues | |
ML20202E583 | 25 November 1997 | Notification of 971215 Meeting W/Commonwealth Edison Co in Rockville,Md to Review Schedule for Listed Plants Improved Std TS Conversion & Supplemental Submittals | |
ML20203C362 | 25 November 1997 | Revised Notification W/New Starting Time of Meeting W/Ceco on 971215 in Rockville,Maryland to Discuss Review Schedule Byron & Braidwood Improved TS Conversion & Supplemental Submittals | |
ML20236N511 | 22 October 1997 | Fowards Staff Response to 960912 TIA Re Containment Spray Additive Sys Conformance W/Design Basis & Tss.Analysis Concluded That 2,400-2,600 Ppm in RWST Acceptable | Boric Acid |
ML20217K827 | 16 October 1997 | Notification of 971024 Meeting W/Util to Discuss Results of Comed Investigation Into Sensitivity of Proposed voltage- Dependent Growth Rates to Binning Strategy for ODSCC Indicators | |
ML20217D426 | 30 September 1997 | Informs of Scheduled Visits W/Nuclear Services at Gpu on Nov 14th & Visit at Commonwealth Edison on Dec 3rd & Would Like to Receive Any Info Available.Supporting Documentation Encl | Stroke time Enforcement Discretion Operability Determination Liquid penetrant |
ML20217E159 | 26 September 1997 | Notification of 971001 Meeting W/Ceco in Rockville,Maryland to Discuss Licensee Plans for SG Replacement Program at Byron,Unit 1 | |
ML20217B390 | 23 September 1997 | Forwards Questions Re Ceco Submittal of Revised SG Tube Rupture Analysis for Byron,Unit 1 & Braidwood,Unit 1 | |
ML20210S846 | 2 September 1997 | Notification of 970904 Meeting W/Util in Rockville,Md to Discuss Comed Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Msb | |
ML20217Q953 | 28 August 1997 | Notification of 970904 Meeting W/Util in Rockville,Md to Discuss CE Methodology,Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Msb | |
ML20210L783 | 18 August 1997 | Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Comeds Methodology Including Assumptions for Calculating Radiation Exposure Doses Resulting from Predicted SG Tube Leakage in Event of Main Steamline Break | |
ML20149L190 | 22 July 1997 | Notification of 970723 Meeting W/Commonwealth Edison Co in Rockville,Md to Discuss Results of Spring 1997,Braidwood,1 SG Tube Eddy Current Insp.Time of Meeting Rescheduled | |
ML20149F273 | 3 July 1997 | Notification of 970723 Meeting W/Util in Rockville,Md to Discuss Results of Spring 1997 Plant,Unit 1 SG Tube Eddy Current Insp Including Determination of Impact of Data | |
ML20138D278 | 28 April 1997 | Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Results of EC Insps of Plant SGs Conducted During Present Refueling Outage | |
ML20217D546 | 18 April 1997 | Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | Safe Shutdown Fitness for Duty Packing leak High Radiation Area Ultimate heat sink Fire Barrier Contraband Emergency Lighting Battery sizing Deep Dose Equivalent Fire Protection Program Fire Watch Scaffolding |
IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | 18 April 1997 | Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission | Safe Shutdown Fitness for Duty Packing leak High Radiation Area Ultimate heat sink Fire Barrier Contraband Emergency Lighting Battery sizing Deep Dose Equivalent Fire Protection Program Fire Watch Scaffolding |
ML20147J239 | 9 April 1997 | Notification of Meeting on 970416 W/Util in Rockville,Md to Discuss Overall Response & Present Addl Details Re Performance Indicators Used to Monitor Performance Stations | |
ML20138J767 | 5 February 1997 | Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel | Generic Fundamentals Examination |
ML20149M690 | 19 January 1997 | Notification of 970128 Meeting W/Commonwealth Edison Co to Discuss Licensee Proposed Program for Use of Mixed Oxide Fuel | |
ML20133J581 | 15 January 1997 | Notification of 970122 Meeting W/Util in Rockville,Md to Discuss Licensee Status of Program for Replacement & Operation of New SG at Byron 1 & Braidwood 1 | |
ML20133J482 | 15 January 1997 | Notification of 970123 Meeting W/Licensees in Rockville,Md to Discuss Contents of Plants TS Conversion Submittal, Provide Staff Comments Based on Initial Screening Review & Discuss Review Schedule | |
ML20135D886 | 5 December 1996 | Notification of 961219 Meeting W/Util in Rockville,Md to Discuss Licensee Proposal of 961018 & to Delete Plant,Unit 1 mid-cycle SG Insp | |
ML20135C476 | 5 December 1996 | Forwards Request for Addl Info Re Application to Amend Licenses Extending Steam Generator Replacement for Byron Unit 1 and Braidwood Unit 1 | |
ML20135D124 | 4 December 1996 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960930-1014 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Post Accident Monitoring Locked High Radiation Area Missed surveillance Job Performance Measure Grace period Power change Downpower |
ML20135B481 | 3 December 1996 | Forwards Info Re Eddy Current Indications Located on cold-leg Side of Plant SG Tubes | |
ML20210N427 | 2 December 1996 | Informs About Drop in Meeting on 961203 for Update on Industry Restructuring & Deregulation,Unicom Strategic Planning & Mixed Oxide Fuel | Enforcement Discretion Liquid penetrant |
ML20217D542 | 27 November 1996 | Forwards Partially Withheld Background Briefing Package in Preparation for 961203 Meeting Between Comed,Nuclear Strategic Services & Chairman Jackson | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Foreign Material Exclusion |
ML20136E622 | 19 November 1996 | Informs That Draft in on Operator Activities Affecting Reactivity Being Distributed | |
ML20149L772 | 14 November 1996 | Notification of 961114 Meeting W/Util in Rockville,Md to Discuss Methodology & Database Proposed by Comed to Determine Length of Operating Cycle Between SG Tube Eddy Current Insps for Plants,Unit 1 | |
ML20210N376 | 12 August 1996 | Informs About Meeting on 960513 to Brief Chairman Jackson on Comed Response to Deregulation | |
ML20217D476 | 31 July 1996 | Forwards Background Briefing Package in Prepartion of 960813 Meeting Between Commonwealth Edison Co & Chairman Jackson. Purpose of Visit to Discuss Recent Organizational Changes at Comed & Company Mgt Focus for Immediate Future | Safe Shutdown Boric Acid Shutdown Margin Packing leak High Radiation Area Half scram Fire Barrier Stroke time Internal Flooding Probabilistic Risk Assessment Zebra Mussel Emergency Lighting Foreign Material Exclusion Scram Discharge Volume Operability Determination Fire Protection Program Power change Siren |
ML20210N338 | 14 May 1996 | Discusses Courtesy Visit to Ceco on 960513 Re Listed Plants | |
ML20210N268 | 13 November 1995 | Discusses Paritially Withheld Chairman Briefing by Ceco on 951116 | |
ML20217D532 | 9 November 1995 | Forwards Partially Withheld Background Briefing Package in Preparation for 951116 Meeting Between Commission & Senior Comed Mgt.Purpose of Visit to Discuss Performance at Each of Sites & Challenges & Issues Needed to Be Addressed | Boric Acid Shutdown Margin Emergency Lighting Operability Determination Fire Protection Program Hourly Fire Watch Scaffolding Operability Assessment |