ML20135C476

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Application to Amend Licenses Extending Steam Generator Replacement for Byron Unit 1 and Braidwood Unit 1
ML20135C476
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 12/05/1996
From: Levin A
NRC (Affiliation Not Assigned)
To: Dick G
NRC (Affiliation Not Assigned)
References
NUDOCS 9612060318
Download: ML20135C476 (3)


Text

- m. _

FD-tl' w7s December 5,1996 l

l MEMORANDUM TO: George F. Dick Jr. Project Directorate Division of Reactor Projects III and IV FROM: Alan Levin, Acting Section Chief 1 Special Projects and Advanced Reactor Systems i Reactor Systems Branch  !

Division of Systems Safety and Analysis

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION TO SUPPORT BYRON AND BRAIDWOOD UNITS 1 AND 2 SGTR REVIEW.

Please transmit our additional request for information (Attachment 1),

relating a license amendment request for SG replacement extension for  !

Byron Unit 1 and Braidwood Unit 1.

Attachment:

As stated cc: J. Strosnider T. Sullivan

Contact:

David T. Diec, SRXB/DSSA 415-2834 DISTRIBUTION: i

  • 7 Eile Centera  !

PDR l SRXB R/F l TCollins  !

DDiec R/F i DDiec i JStaudenmeier l 1

DOCUMENT NAME: G:\BBRAIDSG.RAI

) l OFFICE: as SRXS-17%d ASC:S SA l NAME: M DDI EC' " ALEVI DATE: 12/2-/96 12/ V { 4 0FFICIALREdORDCOPY \

\  !

9612060318 961205 I PDR ADOCK 05000454 {

P PDR 1 0# gggasCOM

i l '

\ se vta uq p* 4 UNITED STATES I g j 2

NUO! aR REGULATO14Y COMMISSION WASHINGTON, D.C. 20666-0001

%,*****/ Decem ber 5,1996 l l

l MEMORANDUM TO: Dick George F. Jr  !

I Division of Reactor Projects HII and IV l s 4 FROM: Alan Levin. Acting Chief C

, Special Projects and Advan dReactorSystems i

! Reactor Systems Branch, DSSA l )

l

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION TO SUPPORT '

l BYRON AND BRAIDWOOD UNITS 1 AND 2 SGTR REVIEW.

1 Please transmit our additional request for information (Attachment 1). l relating a license amendment request for SG replacement extension for Byron Unit 1 and Braidwood Unit 1.

Attachment:

i As stated cc: J. Strosnider T. Sullivan

Contact:

David T. Diec. SRXB/DSSA 415-2834 l

l

{

( .

I

. \

l ATTACHMENT i

1. During a steam generator blowdown following a MSLB. the pressure drop across a tube support plate will be determined by the flow distribution across the plate. The potentia'i for multidimensional flow exists and may I be especially important at the uppermost tube support plate because of the !

difference in flow resistances between flows parallel and perpendicular to '

the tube bundles.

The flow resistance will be direction and position dependent at the tops of the U tubes. Assess the impact that multidimensional flows have on the pressure drop across the tube support plates.

l 4

i i

4 l