Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20132D848 | 18 December 1996 | Summary of 961212 Meeting w/ABB-CE & GE in Rockville,Md Re Changes to Design Control Documents for ABWR & Sys 80+ Standard Plant Designs.List of Attendees Encl | |
ML20148B576 | 4 October 1996 | Summary of 434th Meeting of ACRS on 960912-13 Re Capability of SCAP/RELAP5 Code to Predict SG Temps During Severe Accidents | Probabilistic Risk Assessment |
ML20059D970 | 16 December 1993 | Summary of 404th Meeting of ACRS on 931209-11 W/Ge Re Diversity in Method of Measuring RPV Water Level in Advanced & Simplified BWR Designs | Reactor Vessel Water Level Backfit |
ML20059D961 | 15 December 1993 | Summary of 404th Meeting of ACRS on 931209-11 Re Schedule for Completing Review of NRC Staff Final SER for GE ABWR Ssar | Probabilistic Risk Assessment |
ML20058L506 | 7 December 1993 | Notification of 940105 Meeting W/Bwrog in Rockville,Md to Discuss Generic Guidance & Repair Criteria for BWR Core Shrouds & Recent Cracking of BWR Jet Pump Holddown Beams | |
ML20058A647 | 18 November 1993 | Summary of 931025 Meeting & Followup Telcon on 931029 Re Test Program Activities Conducted at gravity-driven Integral full-height Test for Passive Heat Removal thermal-hydraulic Test Facility in Japan | |
ML20059G755 | 1 November 1993 | Summary of 930921 Meeting W/Ge Nuclear Energy (GE) in GE San Jose Office Re Resolution of Limited Number of Issues Involving Design of ABWR Fire Protection Sys.List of Meeting Attendees & Handouts Encl | Fire Barrier |
ML20057B640 | 17 September 1993 | Submits Daily Highlight.Ge Will Not Be Able to Meet 930913 Date for Certified ABWR Ssar Submittal.Revised Submittal Date Is 930917 for Main Body of Ssar W/Document Control Room Receipt by 930920 | License Renewal |
ML20056E151 | 17 August 1993 | Summary of 930802 Meeting w/GE,C-E & Westinghouse in Rockville,Md Re Status of Design Certification Reviews for Each Revolutionary & Passive Reactor Design.List of Attendees & Handout Encl | Design basis earthquake License Renewal |
ML20056E527 | 5 August 1993 | Summary of Meeting W/Ge in Rockville,Md on 930727 to Discuss Tier 1 Submittal for Bldg Designs & Primary Containment Design | Safe Shutdown Fire Barrier License Renewal Earthquake |
ML20059C845 | 4 August 1993 | Summary of ACRS Subcommittee on BWRs (GE) 930615-17 Visit to GE Facility in San Jose,Ca to Gather Info Associated W/ Review of GE Ssar.Meeting Agenda Encl | Safe Shutdown Ultimate heat sink Fire Barrier Internal Flooding Coatings Aging Management Backfit |
ML20056D942 | 30 July 1993 | Summary of 930707-08 Meeting W/Bnl & GE in San Jose,Ca Re Review of ABWR Ts.Meeting Attendees Listed | Probabilistic Risk Assessment License Renewal |
ML20056D097 | 15 July 1993 | Summary of 930621-24 Meeting W/Ge in Livermore,Ca to Write Proof & Review Instrumentation Sys TS for GE Abwr.Meeting Attendees Listed in Encl 1 | License Renewal |
ML20056C376 | 10 May 1993 | Summary of 930426 Meeting W/Ge in Rockville,Md to Discuss Resolution of Severe Accident Issues for Advanced Bwr. Attendees Listed in Encl 1 | Probabilistic Risk Assessment License Renewal Unidentified leak |
ML20059C742 | 2 March 1993 | Summary of 392nd ACRS Meeting on 921209-11 in Bethesda,Md Re SBO Rule,Ts Improvement Program,Advanced BWR Design,River Bend Nuclear Plant Reliability Monitoring Program & Generic Issue 120,online Testability of Protection Sys | High Radiation Area Probabilistic Risk Assessment Flow Induced Vibration |
ML20128E835 | 5 February 1993 | Summary of 930120-21 Meeting W/Ge in San Jose,Ca Re Issues Related to ABWR PRA | |
ML20128E853 | 5 February 1993 | Summary of 921112-13 Meeting W/Ge Nuclear Energy in San Jose,Ca Re Issues Related to ABWR PRA | Safe Shutdown Ultimate heat sink Mission time Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Fire Watch |
ML20128E865 | 4 February 1993 | Summary of 930121 Meeting W/Ge & Other Stated Companies in San Jose,Ca Re Status of ABWR Review.List of Attendees Encl | Probabilistic Risk Assessment |
ML20128B758 | 27 January 1993 | Summary of 930111-21 Meeting W/Ge Re Development of ITAAC as Part of Certification Process.List of Attendees Encl | |
ML20127M629 | 25 January 1993 | Summary of 930108 Meeting W/Ge in Rockville,Md Re Status of Various Open Items in Chapter 14 of Draft Final SER for Abwr.List of Attendees Encl | |
ML20126F404 | 28 December 1992 | Summary of 921217 Meeting W/Ge Re Discussion on Status of Testing Programs Under Development by GE to Support Design of Sbwr.List of Attendees & RAI Responses Encl | |
ML20126M388 | 23 December 1992 | Summary of 921215 Meeting W/Ge in Rockville,Md to Discuss Issues Related to Industry & Staff Review of ABWR Insps, Tests,Analyses & Acceptance Criteria.List of Attendees & Viewgraphs Encl | Safe Shutdown Stroke time Safe Shutdown Earthquake |
ML20127D321 | 12 August 1992 | Summary of ACRS 388th Meeting on 920806-08 Re Insps,Tests, Analyses & Acceptance Criteria Program for GE ABWR Design. Design | |
ML20127D322 | 12 August 1992 | Summary of ACRS 388th Meeting on 920806-08 Re Plans for Reviewing GE Application for Certification of GE ABWR Design |