|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20132D8481996-12-18018 December 1996 Summary of 961212 Meeting w/ABB-CE & GE in Rockville,Md Re Changes to Design Control Documents for ABWR & Sys 80+ Standard Plant Designs.List of Attendees Encl ML20148B5761996-10-0404 October 1996 Summary of 434th Meeting of ACRS on 960912-13 Re Capability of SCAP/RELAP5 Code to Predict SG Temps During Severe Accidents ML20059D9701993-12-16016 December 1993 Summary of 404th Meeting of ACRS on 931209-11 W/Ge Re Diversity in Method of Measuring RPV Water Level in Advanced & Simplified BWR Designs ML20059D9611993-12-15015 December 1993 Summary of 404th Meeting of ACRS on 931209-11 Re Schedule for Completing Review of NRC Staff Final SER for GE ABWR Ssar ML20058L5061993-12-0707 December 1993 Notification of 940105 Meeting W/Bwrog in Rockville,Md to Discuss Generic Guidance & Repair Criteria for BWR Core Shrouds & Recent Cracking of BWR Jet Pump Holddown Beams ML20059G7551993-11-0101 November 1993 Summary of 930921 Meeting W/Ge Nuclear Energy (GE) in GE San Jose Office Re Resolution of Limited Number of Issues Involving Design of ABWR Fire Protection Sys.List of Meeting Attendees & Handouts Encl ML20057B6401993-09-17017 September 1993 Submits Daily Highlight.Ge Will Not Be Able to Meet 930913 Date for Certified ABWR Ssar Submittal.Revised Submittal Date Is 930917 for Main Body of Ssar W/Document Control Room Receipt by 930920 ML20056E1511993-08-17017 August 1993 Summary of 930802 Meeting w/GE,C-E & Westinghouse in Rockville,Md Re Status of Design Certification Reviews for Each Revolutionary & Passive Reactor Design.List of Attendees & Handout Encl ML20056E5271993-08-0505 August 1993 Summary of Meeting W/Ge in Rockville,Md on 930727 to Discuss Tier 1 Submittal for Bldg Designs & Primary Containment Design ML20059C8451993-08-0404 August 1993 Summary of ACRS Subcommittee on BWRs (GE) 930615-17 Visit to GE Facility in San Jose,Ca to Gather Info Associated W/ Review of GE Ssar.Meeting Agenda Encl ML20056D9421993-07-30030 July 1993 Summary of 930707-08 Meeting W/Bnl & GE in San Jose,Ca Re Review of ABWR Ts.Meeting Attendees Listed ML20056D0971993-07-15015 July 1993 Summary of 930621-24 Meeting W/Ge in Livermore,Ca to Write Proof & Review Instrumentation Sys TS for GE Abwr.Meeting Attendees Listed in Encl 1 ML20056C3761993-05-10010 May 1993 Summary of 930426 Meeting W/Ge in Rockville,Md to Discuss Resolution of Severe Accident Issues for Advanced Bwr. Attendees Listed in Encl 1 ML20059C7421993-03-0202 March 1993 Summary of 392nd ACRS Meeting on 921209-11 in Bethesda,Md Re SBO Rule,Ts Improvement Program,Advanced BWR Design,River Bend Nuclear Plant Reliability Monitoring Program & Generic Issue 120,online Testability of Protection Sys ML20128E8351993-02-0505 February 1993 Summary of 930120-21 Meeting W/Ge in San Jose,Ca Re Issues Related to ABWR PRA ML20128E8531993-02-0505 February 1993 Summary of 921112-13 Meeting W/Ge Nuclear Energy in San Jose,Ca Re Issues Related to ABWR PRA ML20128E8651993-02-0404 February 1993 Summary of 930121 Meeting W/Ge & Other Stated Companies in San Jose,Ca Re Status of ABWR Review.List of Attendees Encl ML20128B7581993-01-27027 January 1993 Summary of 930111-21 Meeting W/Ge Re Development of ITAAC as Part of Certification Process.List of Attendees Encl ML20127M6291993-01-25025 January 1993 Summary of 930108 Meeting W/Ge in Rockville,Md Re Status of Various Open Items in Chapter 14 of Draft Final SER for Abwr.List of Attendees Encl ML20126M3881992-12-23023 December 1992 Summary of 921215 Meeting W/Ge in Rockville,Md to Discuss Issues Related to Industry & Staff Review of ABWR Insps, Tests,Analyses & Acceptance Criteria.List of Attendees & Viewgraphs Encl ML20127D3211992-08-12012 August 1992 Summary of ACRS 388th Meeting on 920806-08 Re Insps,Tests, Analyses & Acceptance Criteria Program for GE ABWR Design. Design ML20127D3221992-08-12012 August 1992 Summary of ACRS 388th Meeting on 920806-08 Re Plans for Reviewing GE Application for Certification of GE ABWR Design 1996-12-18
[Table view]Some use of "" in your query was not closed by a matching "". Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
Some use of "" in your query was not closed by a matching "".
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
3 h ,,,,, og UNITED STATES 8 n- NUCLEAR REGULATORY COMMISSION
'g ;y WASHINGTON, D. C. 20555 j
?g / September 17, 1993 j Docket No.52-001 MEMORANDUM FOR: T. Murley G. Lainas C. Rossi F. Miraglia J. Roe .R. Zimmerman i
W. Russell J. Zwolinski B. Boger J. Partlow E. Adensam C. Thomas D. Crutchfield B. Grimes F. Congel 1 W. Travers J. Wiggins E.' Butcher i F. Gillespie B. D. Liaw W. Bateman,_EDO S. Varga :
A. Thadani M. Slosson '
J. Calvo M. Virgilio Operations Center THRd: R. W. Borchardt, Director VStandardizationProjectDirectorate Associate Directorate for Advanced Reactors i and License' Renewal Office of Nuclear Reactor Regulation FROM: Stephen S. Koenick, Project Engineer Standardization Project Directorate !
Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
DAILY HIGHLIGHT GE Nuclear Enerav (GE) Advanced Boilina Water Reactor (ABWR)
GE indicated yesterday-that they would not.be able to meet the September 13, i 1993, date for its certified ABWR SSAR submittal. The revised submittal date !
is September 17, 1993, for the main body of the SSAR with document control room receipt by-September 20. GE also stated that a' complete package of the full size drawings and P&ID's will be sent on September 20 1993, and will be received.on September 21, 1993.
According to SECY-93-097, the complete final certified ABWR SSAR was originally scheduled to be submitted by July 31, 1993. Subsequently, GE !
revised the submittal date to August 31, 1993, at which time, GE did submit I the final Tier 1 material. '
I j
.j j
i 9309230051 930917 PDR ADDCK 05200001 o IIO '
A .PDR_
(71
--: s
! September 17, 1993
.These repeated GE slippages may impact the schedule for issuance of both the FSER and FDA.
Origine!SkedDyf Stephen S. Koenick, Project Engineer Standardization Project Directorate Associate Directorate for Advanced Reactors '
and License Renewal Office of Nuclear Reactor Regulation t
cc: A. Chaffee L. Pilisco G. Imbro DISTRIBUTION:
. Docket File -
PDR PDST R/F RBorchardt JNWilson CPoslusny SNinh PShea Of 0FC: LA:PDST:ADAR PM:PDST:ADAR CS[PfST:ADAR ,
NAME: PSheag SKoenick:sg Jhdson DATE: 09/g /93 09/$[93 09/h/93 ;
0FFICIAL RECORD COPY: DH.SK P
I
-