September 17, 1993 j
Docket No.52-001 MEMORANDUM FOR:
T. Murley G. Lainas C. Rossi F. Miraglia J. Roe
.R.
Zimmerman i
W. Russell J. Zwolinski B. Boger J. Partlow E. Adensam C. Thomas D. Crutchfield B. Grimes F. Congel 1
W. Travers J. Wiggins E.' Butcher i
F. Gillespie B. D. Liaw W. Bateman,_EDO S. Varga A. Thadani M. Slosson J. Calvo M. Virgilio Operations Center THRd:
R. W. Borchardt, Director VStandardizationProjectDirectorate Associate Directorate for Advanced Reactors i
and License' Renewal Office of Nuclear Reactor Regulation FROM:
Stephen S. Koenick, Project Engineer Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
DAILY HIGHLIGHT GE Nuclear Enerav (GE) Advanced Boilina Water Reactor (ABWR)
GE indicated yesterday-that they would not.be able to meet the September 13, i
1993, date for its certified ABWR SSAR submittal. The revised submittal date is September 17, 1993, for the main body of the SSAR with document control room receipt by-September 20.
GE also stated that a' complete package of the full size drawings and P&ID's will be sent on September 20 1993, and will be received.on September 21, 1993.
According to SECY-93-097, the complete final certified ABWR SSAR was originally scheduled to be submitted by July 31, 1993.
Subsequently, GE revised the submittal date to August 31, 1993, at which time, GE did submit I
the final Tier 1 material.
j
.jj i
9309230051 930917 PDR ADDCK 05200001 IIO '
o A
.PDR_
(71
s
! September 17, 1993
.These repeated GE slippages may impact the schedule for issuance of both the FSER and FDA.
Origine!SkedDyf Stephen S. Koenick, Project Engineer Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation t
cc:
A. Chaffee L. Pilisco G. Imbro DISTRIBUTION:
. Docket File PDR PDST R/F RBorchardt JNWilson CPoslusny SNinh PShea Of CS[PfST:ADAR 0FC:
LA:PDST:ADAR PM:PDST:ADAR NAME: PSheag SKoenick:sg Jhdson 09/$[93 09/h/93 09/g /93 DATE: