Submits Daily Highlight.Ge Will Not Be Able to Meet 930913 Date for Certified ABWR Ssar Submittal.Revised Submittal Date Is 930917 for Main Body of Ssar W/Document Control Room Receipt by 930920
ML20057B640
Person / Time
Site: 05200001
Issue date: 09/17/1993
From: Stephen Koenick
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9309230051
Download: ML20057B640 (2)


Text

3 h ,,,,, og UNITED STATES 8 n- NUCLEAR REGULATORY COMMISSION

'g ;y WASHINGTON, D. C. 20555 j

?g / September 17, 1993 j Docket No.52-001 MEMORANDUM FOR: T. Murley G. Lainas C. Rossi F. Miraglia J. Roe .R. Zimmerman i

W. Russell J. Zwolinski B. Boger J. Partlow E. Adensam C. Thomas D. Crutchfield B. Grimes F. Congel 1 W. Travers J. Wiggins E.' Butcher i F. Gillespie B. D. Liaw W. Bateman,_EDO S. Varga  :

A. Thadani M. Slosson '

J. Calvo M. Virgilio Operations Center THRd: R. W. Borchardt, Director VStandardizationProjectDirectorate Associate Directorate for Advanced Reactors i and License' Renewal Office of Nuclear Reactor Regulation FROM: Stephen S. Koenick, Project Engineer Standardization Project Directorate  !

Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT GE Nuclear Enerav (GE) Advanced Boilina Water Reactor (ABWR)

GE indicated yesterday-that they would not.be able to meet the September 13, i 1993, date for its certified ABWR SSAR submittal. The revised submittal date  !

is September 17, 1993, for the main body of the SSAR with document control room receipt by-September 20. GE also stated that a' complete package of the full size drawings and P&ID's will be sent on September 20 1993, and will be received.on September 21, 1993.

According to SECY-93-097, the complete final certified ABWR SSAR was originally scheduled to be submitted by July 31, 1993. Subsequently, GE  !

revised the submittal date to August 31, 1993, at which time, GE did submit I the final Tier 1 material. '

I j

.j j

i 9309230051 930917 PDR ADDCK 05200001 o IIO '

A .PDR_

(71

--: s

! September 17, 1993

.These repeated GE slippages may impact the schedule for issuance of both the FSER and FDA.

Origine!SkedDyf Stephen S. Koenick, Project Engineer Standardization Project Directorate Associate Directorate for Advanced Reactors '

and License Renewal Office of Nuclear Reactor Regulation t

cc: A. Chaffee L. Pilisco G. Imbro DISTRIBUTION:

. Docket File -

PDR PDST R/F RBorchardt JNWilson CPoslusny SNinh PShea Of 0FC: LA:PDST:ADAR PM:PDST:ADAR CS[PfST:ADAR ,

NAME: PSheag SKoenick:sg Jhdson DATE: 09/g /93 09/$[93 09/h/93  ;

0FFICIAL RECORD COPY: DH.SK P

I

-