, pr ## '

q UNITED STATES 8' n NUCLEAR REGULATORY COMMISSION i

,-. ,j WASHINGTON, D. C 20%5

%*****/ January 25, 1993 Docket No.52-001 .

APPLICAN1: GE Nuclear Energy Company (GE)

PROJECT: Advanced Boiling Water Reactor (ABWR)

SUBJECT:

SUMMARY

OF MEETING WITH GE HELD ON JANUARY 8, 1993 A public meeting was held between the Nuclear Regulatory Commission (NRC) staff and GE Nuclear Energy (CE) at the NRC office in Rockville, Maryland, on January 8, 1993. The purpose of this meeting was to discuss the status of various open items in Chapter 14 of the draft final safety evaluation report (DFSER) for the ABWR. Enclosed is a list of attendees.

GE opened the meeting by presenting a summary of the status of open items in DFSER Chapter 14. GE stated they believed the only remaining open items were:

the specification of acceptance criteria for pre-operational tests; the level 1 and 2 test program criteria for pre-operational tests; and the additions to the pre-operational pr'erequisite sections. GE stated that they had addcd some terms to the level 1 and 2 test program criteria, and that work was ongoing on the pre-operational prerequisite sections.

GE discussed with the staff some concerns it had involving post-fuel load Tier 1 information. GE requested a clarification of what was needed for post-fuel load in Tier 1 (non-inspections, tests, analyses, and acceptance criteria (ITAAC)) information, which the staff agreed to provide. GE questioned whether or not test descriptions needed to be included in Tier 1 information and whether or not the test abstracts in DFSER Chapter 14 were adequate. GE stated it thought it had met the requirements of Regulatory Guide (RG) 1.68, but would like early feedback from the staff on this issue.

The staff stated that it was currently comparing the Tier 1 and 2 information with that contained in Standard Safety Analysis Report Chapter 14, and in RG 1.68. The staff also stated that they were in the process of re-reviewing DFSER Chapter 14 in light of the new information available on the issue of ITAAC. The staff stated that any-deficiencies in Chapter 14 would be noted and conveyed to GE. The staff stated it-was still in the process of reviewing the package of supplemental fuel load information it had received from GE in an effort to resolve that open item.

E' _

9301280250 93012b

~'

'"" ^

PDR -A00CK 05200001 A PDR b(/ q

.- :I l

January 25, 1993-

~

GE stated that they would submit the remaining'open items from DiSER Chap-ter 14 to the staff by the end of-January 1993.

(Original signed by)

Michael T. Janus, Project Engineer Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

As stated-cc w/ enclosure:

See next page DISTRIBUTION:

Docket File PDST R/F TMurley/FMiraglia DCrutchfield PDR WTravers JNWilson MJanus CPoslusny BHuffman JThompson _

TBoyce PShea JMoore, 15B18 GGrant, 17G21 ACRS (11)

EJordan, MNBB 3701 GBagchi, 7H15 RBorchardt BPerch, 8H7-TJKim, 8022 BGramm, 9Al .

g gg j-0FC: LA:P *ADAR PE:PDST:ADAR PM:(bST:ADAR SC:PREB:DRII~SCIDST:ADAR NAME: PShea MJanus:tzdP' CPoslusny 'BGramm JN DATE: Ol&g 3 01/25 /93 01/p/93 01/ts'/93 [o@Vikson 5 /93 0FFICIAL RECORD COPY: MTGSM108.MJ

  • GE Nuclear Energy Docket No.52-001 cc: Mr. Patrick W. Marriott, Manager Mr. Joseph Quirk Licensing & Lonsulting Services GE Nuclear Energy GE Nuclear Energy General Electric Company 175 Curtner Avenue 175 Curtner Avenue, Mail Code 782 San Jose, California 95125 San Jose, California 95125 Mr. Robert Mitchell General Electric Company 175 Curtner Avenue San Jose, California 95125 Mr. L. Gifford, Program Manager Regulatory Programs GE Nuclear Energy 12300 Twinbrook Parkway -

Suite 315 Rockville, Maryland 20852 Director, Criteria & Standards Division Office of Radiation Programs U. S. Environmental Protection Agency 401 M Street, S.W. '

Washington, D.C. 20460 Mr. Daniel F. Giessing U. S. Department of Energy NE-42 Washington, D.C. 20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Room 8002 Washington, D.C. 20503 _

Mr. Frank A. Ross U.S. Department of Energy, NE-42 Office of LWR Safety and Technology 19901 Germantown Road Germantown, Maryland 20874 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C. 20006 Marcus A. Rowden, Esq.

Fried, Frank, Harris, Shriver & Jacobson 1001 Pennsylvania Avenue, N.W.

Suite 800 Washington, D.C. 20004 Jay M. Gutierrez, Esq.

Newman & Holtzinger, P.C.

1615 L Street, N.W.

Suite 1000 Washington, D.C. 20036

d GE ABWR DFSER CHAPTER 14 MEETING JANUARY 8, 1993

[LME Q3GAlJIZATION Chester Poslusny NRR/ADAR/PDST Michael Janus NRR/ADAR/PDST Bob Grann NRR/DRIC T. J. Kim NRR/0GCB John Chambers GE _

D e Enclosure