Summary of 921217 Meeting W/Ge Re Discussion on Status of Testing Programs Under Development by GE to Support Design of Sbwr.List of Attendees & RAI Responses Encl
ML20126F404
Person / Time
Site: 05200004
Issue date: 12/28/1992
From: Jacqueline Thompson
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9212300295
Download: ML20126F404 (5)


Text

k)def tf om my ff

'A umitD STATES 4

NUCLEAR REGULATORY COMMISSION g

)

n n

),

j wasumorou, o.c. aosss

%*****.e t

December 28, 1992

)

Docket No.52-004 APPLICANT:

GE Nuclear Energy (GE)

PROJECT:

Simplified Boiling Water Reactor (SBWR)

SUMMARY

OfHEETINGWITHGEON5bkbfi5[17,1992

SUBJECT:

A pubile meeting was held between Nuclear Regulatory Commission (NRC) and GE Nuclear Energy-(GE) technical staff on December 17, 1992, in the NRC office in Rockville, Maryland.

The purpose of the meeting was to discuss the status of the testing programs under develo) ment by GE to support the design of the SBWR. Enclosure 1 is a list of tie staff and GE participants who attended this meeting.

Some of the major GE test programs currently in progress were summarized and discussed during this meeting. These test programs support the decay heat removal from containment and inventory control features of the SBWR.

The programs discussed during the meeting included the PANTHERS test (a full-scale performance and mechanical test of the isolation condenser (IC) and r'ssive containment cooling system (PCCS) heat exchanger component, the University test 3rograms (HIT / Berkeley) related to condensation heat transfer experiments for tie purpose of developing correlations for use in modeling the performance of the IC and PCCS, the PANDA test (a full-height 1/25 scale low-pressure integral system test of the passive safety systems), and the G!RAffE tests (a scaled low-pressure test of a heat exchanger for both the IC and PCCS modes of containment heat removal). Other GE test programs mentioned during the meeting included the full-height, volume-scaled test of the gravity-driven cooling system at GE's GIST facility.

The staff requested that GE formally address the status and future milestone schedules for the entire SBWR test program.

Included in the request was the l.

matrix testing and completion schedules on each of the test programs and how each of the specific test programs fit into the overall certification test program that support the design certification of the SBWR. GE agreed to provide this information to the staff by January 8, 1993.

ee 3 any7 i.<.

.x v

^

f JP OC 'O O

A

-2 December 28, 1992 in addition, a number of responses to the staff's requests for additional information (RAls) were submitted to the staff during the meeting.

A list of these RAI responses are provided in Enclosure 2.

Copies of these responses arc obtainable through the public docurrent raom.

Sincerely, (Original signed by)

John Thompson, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office or Nuclear Reactor Regulation

Enclosures:

As stated cc w/enucsures:

See next page D1S'iR1BVilD!i:

Docket file PDCT R/F TMurley/fl!1raglia,12GlB 0Crutchfield PDR Wiravers RPlersco Jf1 Wilson Jihompson CPosiusny IBoyce PShea ACRS, (10)

JMoore, 15B18 EJordan, 3701 GGrant, EDO JKudrick, 801 RPerch, 8l17 WBeckner, 10E4 WBurton, 8D1 JLyons, 801 RBarrett, 801 L5notkin, RES Tlee, RES RLobel, 17G21 JMonninger, 8D1 Afhadani, 8E2 MRuuin, 8E23 A[

OTC:

LA:PDST:ADAR PM:PDST :ADAR

/kC:Pd:ADAR NAME: PShes M Jihempron JNW{lson DATE: 12p J92 12/2f/92 12/p)92 OfflCIAL RECORD COPY:

DOCUMENT NAME:

TESTING

General Electric Company Docket No.52-004 cc:

Mr. Patrick W. Harriott, Manager Licensing & Consulting Services GE Huclear Energy 175 Curtner Avenue San Jose, California 95125 Mr. Robert Mitchell General Electric Company 175 Curtner Avenue San Jose, California 95114 Mr. L. Gifford, Program Manager Regulatory Programs GE Nuclear Energy.

12300 Twinbrook Parkway Suite 315 Rockville, Maryland 20852 Director, Criteria & Standards Division Office of Radiation Programs-U. S. Environmental Protection Agency 401 M Street, S.W.

Washington, D.C.

20460 Mr. Daniel F. Giessing 4

U. S. Department of Energy NE-42 Weshington, D.C.

20585

MEETING ATTENDEES SBWR CERTlflCATION TESilHG HEETING DECEMBER 17, 1992 NAML AFFILIATION John Thompson NRR/ADAR/PDST Jerry Wilson NRR/ADAR/PDST Richard Barrett NRR/DSSA/SCSB Louis Shotkin RES/DSR/RPSB Tim Lee RES/DSR/RPSB Richard Lobel NRR/DSSA/SCSB John Monninger NRR/DSSA/SCSB Jack Kudrick NRR/DSSA/SCSB Ashok Thadani NRR/ DST Mark Rubin NRR/SRXB Jeffrey Bacchier GE Paul Billig GE Atam Rao GE Douglas Glohtz GE

GE RES'JSES TO REQUESTS FOR ADDITIONAL lilFORMATION (RAls) 1 Document titled, "PCC test plan and procedures," SIET 00096 ED 91 Rev. A, S. Botti, F. Mazzacurati.

40 pages, 2.

r' ~

  • tled, " Isolation condenser and passive containment condenser l

w

- e ts,"

GE Document Number 23A6999, Rev. 1.

59 pages.

.ne 1st JSME/ASME Joint International Conference on 3.

Occ mering, Vol. 1, November 4-7, 1991.

Pages 257-287.

Nuclear En:.

l li 4.

GE ili istinu co neam conoensation measurements at MIT, by Mici n

. ay, November 12, 1 &, 5 page:..

6.

Predaedings o r tne International Conference on Multiphase Flows,

'91-T(ukuba, Leptember 24-27, 1991, Tsukuba, Japan.

Pages 183-190.

6.

Occument titled, " Technical Specification for PCC Instruments Installa-A4 1

tion," S. Gandolfi et. al., 51 pages.