Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23242A328 | 1 September 2023 | Amendment No. 233 Correction | |
ML23188A129 | 26 July 2023 | Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 | Post Accident Monitoring Nondestructive Examination Surveillance Frequency Control Program |
ML23122A302 | 20 July 2023 | Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 | Anticipated operational occurrence |
ML23087A076 | 13 July 2023 | Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Surveillance Frequency Control Program |
ML22364A024 | 1 March 2023 | R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 | Fire Protection Program |
ML22305A699 | 28 December 2022 | Issuance of Amendment Nos. 231 and 231 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 | Post Accident Monitoring Nondestructive Examination Surveillance Frequency Control Program |
ML22210A031 | 30 August 2022 | Issuance of Amendments Nos. 230, 230, 230, and 230, Respectively, Regarding Adoption of Technical Specifications Task Force Traveler (TSTF) 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Safe Shutdown Surveillance Frequency Control Program |
ML22173A181 | 11 August 2022 | Issuance of Amendment No. 229 to Remove License Condition | Anticipated operational occurrence Internal Flooding Hydrostatic Probabilistic Risk Assessment Pressure and Temperature Limits Report Exemption Request |
ML22173A214 | 10 August 2022 | Issuance of Amendments Nos. 228 and 228 Revision of Technical Specifications for the Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Surveillance Frequency Control Program |
ML22145A586 | 3 June 2022 | R. E. Ginna Correction to Pages Issued for Amendments Nos. 225, 225, 227, 227, & 148, Respectively, Regarding Issues Identified in Westinghouse Documents | |
ML22115A212 | 12 May 2022 | Summary of April 11, 2022, Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding a Future Amendment to Place One High Burnup Lead Test Assembly Into the Byron, Unit 2, Reactor | |
ML22095A270 | 12 May 2022 | Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications | Ultimate heat sink |
ML22090A086 | 29 April 2022 | Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position | Safe Shutdown Water Inventory Control Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Recently irradiated fuel Fire Protection Program |
ML22098A051 | 11 April 2022 | 2 Cycle 25 High Burnup Lead Test Assembly NRC Pre-Submittal Meeting on April 22, 2022 (EPID L-2022-LRM-0022) (Slides) | |
ML22026A489 | 22 March 2022 | Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary | Anticipated operational occurrence Nonconservative Technical Specifications Fire Protection Program Power change |
ML22021B659 | 1 February 2022 | Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) | |
ML22021B660 | 1 February 2022 | Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Aging Management Annual Radioactive Effluent Release Report Safeguards Contingency Plan Preemption Authority License Renewal Subsequent License Renewal Fuel cladding Liquid penetrant Fire Protection Program Scaffolding Unidentified leakage Power Uprate |
ML22031A276 | 1 February 2022 | Issuance of Indemnity Agreement Amendments-Enclosure 2 | |
ML21314A218 | 18 January 2022 | Audit Plan in Support of Review of License Amendment Request Regarding the Ultimate Heat Sink | Ultimate heat sink Earthquake |
ML21347A038 | 13 January 2022 | Issuance of Amendments to Revise Reactor Coolant Leakage Requirements | Packing leak Cyber Security Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML21154A046 | 13 July 2021 | Issuance of Amendments Nos. 222 and 222 Revision of Technical Specifications for the Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Surveillance Frequency Control Program |
ML21090A015 | 7 April 2021 | Correction to Amendment Nos. 219 and 219 Regarding Revision of Technical Specifications 5.6.5, Core Operating Limits Report (COLR) | |
ML21060B281 | 2 April 2021 | Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating | Safe Shutdown Stroke time Anticipated operational occurrence Surveillance Frequency Control Program Nonconservative Technical Specifications |
ML21054A008 | 10 March 2021 | Issuance of Amendment Nos. 220 and 220 One-Time Deferral of Steam Generator Tube Inspections | Anticipated operational occurrence Nondestructive Examination Foreign Material Exclusion Pandemic Coronavirus |
ML21013A005 | 4 February 2021 | Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML20317A001 | 28 December 2020 | Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) | Coatings |
ML20245E419 | 24 September 2020 | Issuance of Amendments Nos. 218 and 218 Revision of Technical Specifications for the Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Enforcement Discretion Surveillance Frequency Control Program Earthquake |
ML20246G865 | 21 September 2020 | Issuance of Amendment Nos. 222 and 222 One-Time Extension of Unit No. 2 Steam Generator Inspections (COVID-19) | Pandemic Coronavirus COVID-19 |
ML20163A046 | 18 September 2020 | Issuance of Amendments Nos. 217, 217, 221, and 221, Revise Technical Specification 5.6.6 to Allow Use of Areva Np Topical Report BAW-2308 | Post Accident Monitoring Hydrostatic Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Exemption Request |
ML20167A007 | 11 September 2020 | R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues | Surveillance Frequency Control Program Fire Protection Program |
ML20149K698 | 10 September 2020 | Issuance of Amendment Nos. 215, 215, 219, and 219 Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Coatings Incorporated by reference Aging Management Large early release frequency Moisture barrier Grace period |
ML20153A804 | 31 July 2020 | Co. - Issuance of Amendments Revising Emergency Action RA3 | |
ML20141L636 | 10 July 2020 | Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 | Time of Discovery High winds Fire Barrier Internal Flooding Probabilistic Risk Assessment Cyber Security Large early release frequency Safeguards Contingency Plan Turbine Missile Fire Protection Program |
ML20134H940 | 8 July 2020 | Issuance of Amendments Revising the High Radiation Area Administrative Controls | High Radiation Area Offsite Dose Calculation Manual Cyber Security Annual Radioactive Effluent Release Report Process Control Program Safeguards Contingency Plan Deep Dose Equivalent Fire Protection Program Scaffolding |
ML20118C429 | 9 June 2020 | Issuance of Amendments Revision of Technical Specifications for the Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Surveillance Frequency Control Program Earthquake |
ML20111A000 | 1 May 2020 | Issuance of Amendment No. 209, Revision Technical Specification 5.5.9, Steam Generator (SG) Program, for One-Time Revision to Frequency of SG Tube Inspections (Exigent Circumstances) | Pandemic Coronavirus COVID-19 |
ML20021A070 | 6 April 2020 | Issuance of Amendments to Delete License Conditions for Decommissioning Trusts | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Cyber Security Preemption Authority Fire Protection Program |
ML20034G546 | 12 March 2020 | Issuance of Amendments Revising Instrument Testing and Calibration Definitions | Shutdown Margin Probabilistic Risk Assessment Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
ML19331A725 | 14 February 2020 | Issuance of Amendments Revising Emergency Action Levels | High winds Ultimate heat sink Earthquake Fuel cladding |
ML19266A527 | 8 October 2019 | Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications | Cyber Security Safeguards Contingency Plan Offsite Circuit Fire Protection Program |
ML19190A081 | 28 August 2019 | Issuance of Amendments Regarding Limiting Condition of Operation for Inoperability of Snubbers | Probabilistic Risk Assessment Large early release frequency Earthquake |
ML19170A311 | 19 June 2019 | Redacted Braidwood Station, Units 1 & 2, and Byron Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Appendix 5.1 (Public Version Pages 1-76 and 129-287) | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Emergency Lighting Earthquake Fire Protection Program Fire Watch Scaffolding |
ML19168A216 | 17 June 2019 | Redacted Byron Station, Units 1&2, Amendment 28 to Fire Protection Report, Chapter 2.4, Safe Shutdown Analysis (Public Version Pages 1-20 and 1626-1643) | Hot Short Safe Shutdown Boric Acid Shutdown Margin Fire Barrier |
ML19168A119 | 17 June 2019 | Redacted Braidwood Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Chapter 2.4, Safe Shutdown Analysis. (Public Version Pages 1-19 and 1726-1742) | Hot Short Safe Shutdown Boric Acid Shutdown Margin Fire Barrier |
RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control | 14 June 2019 | Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control | Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Scram Discharge Volume Process Control Program |
ML19038A017 | 3 April 2019 | Issuance of Amendment No. 207 Regarding Use of Accident Tolerant Fuel Lead Test Assemblies | Anticipated operational occurrence |
ML18302A227 | 12 December 2018 | Issuance of Amendments No. 200 and 205 Regarding Axial Flux Difference Technical Specifications | Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding Power change |
ML18291A980 | 8 November 2018 | Issuance of Amendment Nos. 199 Regarding Use of TORMIS for Assessing Tornado Missile Protection | Ultimate heat sink Probabilistic Risk Assessment Tornado Generated Missile Tornado Missile Protection TORMIS Earthquake |
ML18264A092 | 22 October 2018 | Issuance of Amendment Nos. 198, 198, 204, and 204, Respectively, Regarding Adoption of Title 10 of the Code of Federal Regulations Section 50.69 CAC Nos. MG0201, MG0202, MG0203, and MG0204; EPID-L 2017-LLA-0285) | Safe Shutdown High winds Mission time Internal Flooding Probabilistic Risk Assessment Cyber Security Incorporated by reference Large early release frequency Spent Fuel Pool Instrumentation Earthquake Fire Protection Program |
ML18206A282 | 2 August 2018 | Issuance of Amendments to Relocate the Staff Qualification Requirements | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |