Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2 November 2023Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear PowerSafe Shutdown
High winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Large early release frequency
Flooding Focused Evaluation
Earthquake
Commercial Grade
Maintenance Rule Program
Pandemic
Turbine Missile
COVID-19
Offsite Circuit
Seismic Walkdown Report
RA-18-0090, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors17 February 2023Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
Large early release frequency
Turbine Missile
Seismic Walkdown Report
RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b16 February 2023License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
FLEX
Fukushima Dai-Ichi
Seismically rugged
Surveillance Frequency Control Program
Large early release frequency
Battery sizing
Flooding Focused Evaluation
Earthquake
Commercial Grade
Pandemic
Turbine Missile
COVID-19
Offsite Circuit
Seismic Walkdown Report
Manual Operator Action
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition24 February 2022Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing DefinitionSafe Shutdown
Shutdown Margin
Packing leak
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
Unidentified leakage
RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position18 January 2022Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Recently irradiated fuel
Power Uprate
RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits20 December 2021License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) LimitsHydrostatic
Aging Management
License Renewal
Power Uprate
Measurement Uncertainty Recapture
RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility14 December 2021William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations FacilityFuel cladding
Minimum staff
RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO9 June 2021Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCOSafe Shutdown
Qualified Offsite Circuit
Surveillance Frequency Control Program
Offsite Circuit
RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description8 July 2019License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program DescriptionCoatings
RA-18-001, McGuire Nuclear Station, Units 1 and 2 - Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating.10 July 2018McGuire Nuclear Station, Units 1 and 2 - Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating.
RA-18-0015, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating.10 July 2018Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating.Surveillance Frequency Control Program
Offsite Circuit
MNS-18-001, Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri Inoperable31 May 2018Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri InoperableShutdown Margin
Anticipated operational occurrence
ML18130A80710 May 2018Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical SpecificationsPost Accident Monitoring
Surveillance Frequency Control Program
Stress corrosion cracking
Recently irradiated fuel
RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications10 May 2018Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical SpecificationsPost Accident Monitoring
Surveillance Frequency Control Program
Stress corrosion cracking
Recently irradiated fuel
MNS-18-017, Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs26 February 2018Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVsSurveillance Frequency Control Program
Manual Operator Action
MNS-17-026, Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles8 December 2017Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated MissilesSafe Shutdown
Ultimate heat sink
Tornado Missile
Probabilistic Risk Assessment
Finite Element Analysis
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
TORMIS
Turbine Missile
Overspeed trip
RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing7 November 2017Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing
MNS-17-031, License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition14 September 2017License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition
RA-17-0035, Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating.20 July 2017Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating.Safe Shutdown
High winds
Ultimate heat sink
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Offsite Circuit
RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules18 July 2017Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application RulesTime of Discovery
Missed surveillance
MNS-17-023, Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies25 May 2017Response to Request for Additional Information to License Amendment Request Permanent Extension of Type a and Type C Leak Rate Test Frequencies
ML17122A1162 May 2017Catawba and McGuire - License Amendment Request Proposing Changes to Technical Specification 3.8.1, AC Sources - Operating.
RA-17-0003, Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers11 January 2017Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force TravelersHigh Radiation Area
Anticipated operational occurrence
Time to boil
Surveillance Frequency Control Program
Fuel cladding
Offsite Circuit
Overspeed trip
Thermal fatigue
MNS-16-092, License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies19 December 2016License Amendment Request to Revise Technical Specifications Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesBoric Acid
High winds
Non-Destructive Examination
Offsite Dose Calculation Manual
Internal Flooding
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Aging Management
Local Leak Rate Testing
Large early release frequency
Moisture barrier
License Renewal
MNS-16-091, License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity.8 December 2016License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity.GOTHIC
ML16305A14120 October 2016Document Transmittal Regarding Issue MNS FOL U-2, Rev. 3Safe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
Measurement Uncertainty Recapture
RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces27 September 2016Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement ProcessPost Accident Monitoring
Surveillance Frequency Control Program
Stress corrosion cracking
Recently irradiated fuel
MNS-16-046, License Amendment Request for Technical Specification 3.6.14, Divider Barrier Integrity30 June 2016License Amendment Request for Technical Specification 3.6.14, Divider Barrier IntegritySafe Shutdown
Enforcement Discretion
Control of Heavy Loads
Fuel cladding
MNS-16-039, Submittal Revising Attachment s of License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program26 April 2016Submittal Revising Attachment s of License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection ProgramHot Short
Probabilistic Risk Assessment
Fire Protection Program
MNS-15-068, License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.24 March 2016License Amendment Request to Technical Specification (TS) 3.6.13, Ice Condenser Doors.Surveillance Frequency Control Program
Operability Determination
Fuel cladding
MNS-16-015, License Amendment Request (LAR) for One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval18 February 2016License Amendment Request (LAR) for One-Time Extension of Appendix J Type a Integrated Leakage Rate Test IntervalBoric Acid
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Coatings
Aging Management
Local Leak Rate Testing
Large early release frequency
Moisture barrier
License Renewal
MNS-15-099, Submittal Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection Program14 January 2016Submittal Regarding License Amendment Request to Implement a Risk-Informed Performance-Based Fire Protection ProgramSafe Shutdown
Probabilistic Risk Assessment
Fire Protection Program
MNS-16-002, Proposed Technical Specifications (TS) Amendment TS 3.7.10, Control Room Area Chilled Water System (Mns), and TS 3.7.11, Control Room Area Chilled Water System (CNS)7 January 2016Proposed Technical Specifications (TS) Amendment TS 3.7.10, Control Room Area Chilled Water System (Mns), and TS 3.7.11, Control Room Area Chilled Water System (CNS)Post Accident Monitoring
Enforcement Discretion
Surveillance Frequency Control Program
Recently irradiated fuel
ML15258A0589 September 2015Amendment 280Safe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
Measurement Uncertainty Recapture
ML15258A0599 September 2015Renewed Facility Operating LicenseSafe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
Measurement Uncertainty Recapture
ML15258A0558 September 2015Renewed Facility Operating LicenseSafe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
Measurement Uncertainty Recapture
ML15258A0578 September 2015Mcgurie Nuclear Station - MNS-TS-1.1 Amendment 280/260 DistributionShutdown Margin
Pressure Boundary Leakage
Unidentified leakage
MNS-15-069, Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating.28 August 2015Duke Energy Carolinas, LLC (Duke Energy), McGuire Nuclear Station, Unit 1 - License Amendment Request for One-Time Change to Technical Specification 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating.Mission time
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Maintenance Rule Program
Fuel cladding
Grace period
RA-15-0020, License Amendment Request and 10 CFR 50.12 Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding20 August 2015License Amendment Request and 10 CFR 50.12 Exemption Request for Use of Optimized Zirlo Fuel Rod CladdingPost Accident Monitoring
Exemption Request
Fuel cladding
RA-15-001, Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Foot15 July 2015Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, FootnTornado Missile
Power Uprate
Measurement Uncertainty Recapture
RA-15-0013, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 1115 July 2015License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11Tornado Missile
Power Uprate
Measurement Uncertainty Recapture
MNS-15-025, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation9 July 2015License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation
MNS-15-026, License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System Degraded Condition - Drawing MCFD-2574-03.01, Rev. 11, Flow Diagram of Nuclear Service.30 June 2015License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System Degraded Condition - Drawing MCFD-2574-03.01, Rev. 11, Flow Diagram of Nuclear Service.
ML15191A02530 June 2015License Amendment Request for Temporary Changes to Technical Specifications for Correction of an 'A' Train Nuclear Service Water System (Nsws) Degraded ConditionSafe Shutdown
Ultimate heat sink
Mission time
Tornado Missile
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Surveillance Frequency Control Program
Foreign Material Exclusion
Spent Fuel Pool Instrumentation
Earthquake
Maintenance Rule Program
Turbine Missile
Fuel cladding
Offsite Circuit
Manual Operator Action
ML15175A44824 June 2015Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6Surveillance Frequency Control Program
ML15175A44724 June 2015Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6Past operability
Surveillance Frequency Control Program
Operability Determination
ML15175A44524 June 2015Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6Stroke time
Past operability
Surveillance Frequency Control Program
Operability Determination
Power Operated Valves
ML15175A44224 June 2015Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6