IR 05000261/2023004 | 31 January 2024 | Integrated Inspection Report 05000261/2023004 | |
IR 05000400/2023004 | 30 January 2024 | Integrated Inspection Report 05000400/2023004 | |
IR 05000335/2023010 | 26 January 2024 | NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 | Commercial Grade Dedication |
L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | 25 January 2024 | Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) | |
ML24009A243 | 25 January 2024 | Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Exemption Request |
ML24009A271 | 24 January 2024 | Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule | |
IR 05000335/2023004 | 24 January 2024 | Integrated Inspection Report 05000335/2023004 and 05000389/2023004 | |
L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years | 18 January 2024 | Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years | |
L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump | 8 January 2024 | Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump | |
ML23354A005 | 8 January 2024 | Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 | |
IR 05000324/2023011 | 26 December 2023 | NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management License Renewal Fire Protection Program |
L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update | 15 December 2023 | Quality Assurance Topical Report (FPL-1) Revision 30 Update | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Process Control Program Operability Determination Safeguards Contingency Plan License Renewal Maintenance Rule Program Fire Protection Program Grace period Power Uprate |
L-2023-179, Unusual or Important Environmental Event - Turtle Mortality | 14 December 2023 | Unusual or Important Environmental Event - Turtle Mortality | |
IR 05000324/2023402 | 14 December 2023 | Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 | |
L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 | 12 December 2023 | License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 | |
ML23342A090 | 8 December 2023 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Condition Adverse to Quality Operability Determination License Renewal Maintenance Rule Program |
IR 05000261/2023420 | 30 November 2023 | Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) | Safeguards Contingency Plan |
IR 05000261/2023010 | 28 November 2023 | Fire Protection Team Inspection Report 05000261/2023010 | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management |
L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654 | 28 November 2023 | Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, | Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Incorporated by reference FLEX Severe Accident Management Guideline Earthquake Deep Dose Equivalent Minimum staff Fire Protection Program Grace period Overexposure |
ML23332A177 | 28 November 2023 | Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Recently irradiated fuel Power change |
ML23297A026 | 27 November 2023 | Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections | Coatings Incorporated by reference |
L-2023-162, Response to 50.69 2nd Round of Rals | 21 November 2023 | Response to 50.69 2nd Round of Rals | Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi |
ML23317A346 | 14 November 2023 | Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Fire Protection Program |
IR 05000400/2023003 | 9 November 2023 | Integrated Inspection Report 05000400/2023003 | Enforcement Discretion Probabilistic Risk Assessment Met Tower Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program |
IR 05000261/2023003 | 7 November 2023 | Integrated Inspection Report 05000261 2023003 and 07200060 2023001 | Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Overtravel Maintenance Rule Program Fire Protection Program Substantial potential for overexposure Power change Overexposure |
IR 05000335/2023003 | 6 November 2023 | Integrated Inspection Report 05000335/2023003 and 05000389/2023003 | Stroke time Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program |
IR 05000324/2023003 | 1 November 2023 | Integrated Inspection Report 05000324/2023003 and 05000325/2023003 | Commercial Grade Dedication Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
ML23270B888 | 23 October 2023 | Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 | Probabilistic Risk Assessment Large early release frequency |
IR 05000324/2023010 | 17 October 2023 | Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 | |
IR 05000325/2023401 | 16 October 2023 | Security Baseline Inspection Report 05000324 and 05000325 2023401 | |
ML23226A086 | 12 October 2023 | Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b | Anticipated operational occurrence Surveillance Frequency Control Program |
ML23346A132 | 6 October 2023 | Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published | Pandemic COVID-19 Siren |
ML23234A170 | 3 October 2023 | Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications | Incorporated by reference |
ML23275A110 | 2 October 2023 | License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 | Boric Acid Shutdown Margin Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Probabilistic Risk Assessment Missed surveillance Surveillance Frequency Control Program Nonconservative Technical Specifications Fuel cladding Recently irradiated fuel Power change Power Uprate |
L-2023-131, Subsequent License Renewal Application - Second Annual Update | 28 September 2023 | Subsequent License Renewal Application - Second Annual Update | Boric Acid Aging Management License Renewal |
L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 26 September 2023 | Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Internal Flooding Probabilistic Risk Assessment FLEX |
ML23256A088 | 25 September 2023 | Issuance of Alternative to Steam Generator Welds | Hydrostatic Probabilistic Risk Assessment Incorporated by reference Finite Element Analysis |
IR 05000335/2023301 | 20 September 2023 | NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 | |
L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report | 20 September 2023 | Corrections to the 2022 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report | 18 September 2023 | Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report | 14 September 2023 | Correction to the 2020 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 11 September 2023 | Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Multiple Spurious Operation FLEX B.5.b |
L-2023-108, Report of 10 CFR 50.59 Plant Changes | 11 September 2023 | Report of 10 CFR 50.59 Plant Changes | Turbine Missile |
L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report | 6 September 2023 | Corrections to the 2021 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 | 6 September 2023 | Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Tornado Missile Hydrostatic Missed surveillance Surveillance Frequency Control Program Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change Downpower Unidentified leakage |
ML23219A004 | 1 September 2023 | Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 | Subsequent License Renewal |
ML23195A078 | 29 August 2023 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Stress corrosion cracking Pressure Boundary Leakage Fire Protection Program Unidentified leakage Operational leakage |
IR 05000400/2023005 | 23 August 2023 | Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) | Cyber Security |
ML23235A055 | 23 August 2023 | Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) | Safe Shutdown Fitness for Duty Exemption Request COVID-19 Fire Protection Program |
IR 05000324/2023005 | 23 August 2023 | Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) | Commercial Grade Dedication Cyber Security License Renewal |