RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) | 10 January 2024 | Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) | |
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX | 8 January 2024 | Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX | Packing leak Offsite Dose Calculation Manual Operating Basis Earthquake Exemption Request Earthquake Pressure Boundary Leakage Grace period Unidentified leakage Operational leakage |
RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval | 4 January 2024 | Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval | |
RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. | 12 December 2023 | Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. | Exemption Request Pressure Boundary Leakage Grace period Unidentified leakage Operational leakage |
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 4 December 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Exemption Request |
RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report | 16 November 2023 | End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report | Nondestructive Examination Flow Accelerated Corrosion |
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 16 November 2023 | RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power | 2 November 2023 | Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power | Safe Shutdown High winds Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Qualified Offsite Circuit Incorporated by reference FLEX Fukushima Dai-Ichi Seismically rugged Design basis earthquake Large early release frequency Flooding Focused Evaluation Earthquake Commercial Grade Maintenance Rule Program Pandemic Turbine Missile COVID-19 Offsite Circuit Seismic Walkdown Report |
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | 1 November 2023 | Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | Exemption Request Siren |
RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report | 25 September 2023 | Refuel 27 (C1 R27) Inservice Inspection (ISI) Report | |
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | 20 September 2023 | Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | Met Tower Exemption Request |
RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks | 28 August 2023 | Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks | |
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination Weld Overlay Finite Element Analysis |
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination |
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | 7 July 2023 | Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record | 28 June 2023 | 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record | Incorporated by reference |
RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications | 19 June 2023 | License Amendment Application to Revise Control Room Cooling Technical Specifications | Post Accident Monitoring Enforcement Discretion Surveillance Frequency Control Program Recently irradiated fuel |
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | 7 June 2023 | Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | |
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | 30 May 2023 | Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
RA-23-0105, Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core | 4 May 2023 | Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core | Boric Acid Shutdown Margin |
RA-23-0118, Cycle 29, Revision 1, Core Operating Limits Report (COLR) | 3 May 2023 | Cycle 29, Revision 1, Core Operating Limits Report (COLR) | Boric Acid Shutdown Margin |
RA-23-0117, Report of Changes to Duke Energy McGuire Emergency Plan Annex | 1 May 2023 | Report of Changes to Duke Energy McGuire Emergency Plan Annex | |
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 2022 | 26 April 2023 | Duke Energy Annual Radiological Environmental Operating Report - 2022 | Time of Discovery Grab sample Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Earthquake Chernobyl |
RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 | 26 April 2023 | Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 | |
RA-23-0046, Annual Radioactive Effluent Release Report - 2022 | 24 April 2023 | Annual Radioactive Effluent Release Report - 2022 | Annual Radioactive Effluent Release Report |
RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change | 24 April 2023 | Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change | Safe Shutdown Time of Discovery Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Slow transfer Anticipated operational occurrence Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Operability Determination Battery sizing License Renewal Earthquake Commercial Grade Power Operated Valves Turbine Missile Offsite Circuit Fire Watch Power change Overspeed trip Manual Operator Action |
RA-23-0091, Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 4 | 13 April 2023 | Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 4 | Safe Shutdown Time of Discovery Health Physics Network High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Safeguards Contingency Plan Exemption Request Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change Unidentified leakage |
RA-23-0036, Biennial Decommissioning Financial Assurance Reports | 30 March 2023 | Biennial Decommissioning Financial Assurance Reports | |
RA-23-0040, Onsite Property Insurance Coverage | 30 March 2023 | Onsite Property Insurance Coverage | |
RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 30 March 2023 | 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) | 30 March 2023 | Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) | Decommissioning Funding Plan Authorized possession limits |
RA-23-0084, Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Rev. 4 | 29 March 2023 | Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Rev. 4 | Boric Acid Shutdown Margin |
RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report | 16 March 2023 | Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report | |
RA-23-0083, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 2 | 16 March 2023 | Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 2 | Boric Acid Shutdown Margin |
RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds | 28 February 2023 | Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds | |
RA-23-0065, Report of Changes to McGuire EAL Technical Basis Document | 23 February 2023 | Report of Changes to McGuire EAL Technical Basis Document | Earthquake |
RA-18-0090, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 17 February 2023 | Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi Large early release frequency Turbine Missile Seismic Walkdown Report |
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 17 February 2023 | Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Weld Overlay Hydrostatic Finite Element Analysis Flow Accelerated Corrosion Stress corrosion cracking |
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 16 February 2023 | Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Stress corrosion cracking Pressure Boundary Leakage Unidentified leakage Operational leakage |
RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 16 February 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds High Radiation Area Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Qualified Offsite Circuit FLEX Fukushima Dai-Ichi Seismically rugged Surveillance Frequency Control Program Large early release frequency Battery sizing Flooding Focused Evaluation Earthquake Commercial Grade Pandemic Turbine Missile COVID-19 Offsite Circuit Seismic Walkdown Report Manual Operator Action |
RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI) | 15 February 2023 | End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI) | |
RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 2 February 2023 | Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | 1 February 2023 | License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | Enforcement Discretion Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-22-0608, Refuel 25 (C2R25) Inservice Inspection (ISI) Report | 25 January 2023 | Refuel 25 (C2R25) Inservice Inspection (ISI) Report | Boric Acid |
RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 23 January 2023 | Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | |
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | 5 December 2022 | Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | |
RA-22-0331, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1 | 22 November 2022 | Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1 | Boric Acid Shutdown Margin |
RA-22-0312, Report of Changes to McGuire Emergency Plan Annex | 26 October 2022 | Report of Changes to McGuire Emergency Plan Annex | |
RA-22-0303, End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report | 25 October 2022 | End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report | Nondestructive Examination |
RA-22-0291, Report of Changes to Emergency Plan Implementing Procedures | 17 October 2022 | Report of Changes to Emergency Plan Implementing Procedures | |