CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule15 August 2024(CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update ScheduleIncorporated by reference
Exemption Request
CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality5 August 2024(Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to ImpracticalityVT-2
CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 526 June 2024(Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5Safe Shutdown
Loop seal
Mission time
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Earthquake
Power-Operated Valves
Grace period
Thermography
CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 018 June 2024(Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0Safe Shutdown
Boric Acid
Stroke time
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Earthquake
Thermography
CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval30 May 2024(Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year IntervalNondestructive Examination
CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator16 May 2024(CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator
CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters29 April 2024(Cpnpp), Registration of Dry Spent Fuel Storage Canisters
CP-202400107, (CPNPP) - 2023 Annual Radiological Environmental Operating Report18 April 2024(CPNPP) - 2023 Annual Radiological Environmental Operating ReportOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Chernobyl
CP-202400099, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters9 April 2024(CPNPP) - Registration of Dry Spent Fuel Storage Canisters
CP-202400092, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program1 April 2024(CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) ProgramProbabilistic Risk Assessment
CP-202400089, Property Damage Insurance25 March 2024Property Damage Insurance
CP-202400087, (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable21 March 2024(CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-IsolatableThermal fatigue
CP-202400085, (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation7 March 2024(CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationExemption Request
CP-202400073, (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator4 March 2024(CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator
CP-202400072, (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation29 February 2024(Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring InstrumentationPost Accident Monitoring
CP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown28 February 2024(Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During ShutdownQualified Offsite Circuit
Offsite Circuit
CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program28 February 2024(Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) ProgramProbabilistic Risk Assessment
CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions23 February 2024Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions
CP-202400063, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)12 February 2024(CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)
CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 131 January 2024License Renewal Application Revision 0 - Supplement 3, Revision 1
CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)29 January 2024(CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)
CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 213 December 2023(Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2Safe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Open Phase Condition
Large early release frequency
Seismic Walkdown Report
CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation12 December 2023(Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring InstrumentationPost Accident Monitoring
CP-202300494, License Renewal Application Revision 0, Supplement 36 December 2023License Renewal Application Revision 0, Supplement 3Boric Acid
Finite Element Analysis
Aging Management
License Renewal
CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation20 November 2023License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear InstrumentationShutdown Margin
Probabilistic Risk Assessment
CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements12 October 2023Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements
CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 44 October 2023Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4Boric Acid
Fire Barrier
Coatings
Aging Management
Stress corrosion cracking
License Renewal
Subsequent License Renewal
Through-Wall Leak
Fire Protection Program
CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program15 September 2023(CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) ProgramIncorporated by reference
CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule24 August 2023(CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update ScheduleIncorporated by reference
Exemption Request
CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)17 August 2023(Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)
CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report17 August 2023(CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day ReportNondestructive Examination
Operational leakage
CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 01815 August 202310CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018Operator Manual Action
CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1121 August 2023(Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112
CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 327 July 2023Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3Boric Acid
Fire Barrier
Coatings
Nondestructive Examination
Aging Management
Stress corrosion cracking
Eddy Current Testing
Moisture barrier
License Renewal
Subsequent License Renewal
Through-Wall Leak
Fire Protection Program
CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)18 July 2023(Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)Health Physics Network
Fukushima Dai-Ichi
CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 112 July 2023Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Aging Management
Intergranular Stress Corrosion Cracking
Stress corrosion cracking
License Renewal
Earthquake
Pressure Boundary Leakage
Pressure boundary leak
Dissimilar Metal Weld
Stretch Power Uprate
Affidavit
Water hammer
CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 220 June 2023Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2Boric Acid
Fire Barrier
Aging Management
Fire Protection Program
CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements15 June 2023Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System RequirementsSafe Shutdown
CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 113 June 2023Response to Request for Additional Information Regarding License Renewal Application - Set 1
CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review6 June 2023Response to Request for Additional Information - License Renewal Application Environmental Review
CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-0525 May 2023Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05
CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application8 May 2023Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal ApplicationSafe Shutdown
License Renewal
CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)4 May 2023(CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)Shutdown Margin
CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report27 April 2023(Cpnpp), 2022 Annual Radiological Effluent Release ReportAnnual Radioactive Effluent Release Report
Annual Radiological Effluent Release Report
CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report27 April 2023(Cpnpp), 2022 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
CP-202300165, License Renewal Application Revision 0 - Supplement 224 April 2023License Renewal Application Revision 0 - Supplement 2Boric Acid
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Coatings
Finite Element Analysis
High Energy Line Break
Aging Management
Stress corrosion cracking
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
EVT-1
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Dissimilar Metal Weld
Stretch Power Uprate
CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements20 April 2023License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems RequirementsSafe Shutdown
Operator Manual Action
Surveillance Frequency Control Program
Overspeed trip
CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments20 April 2023ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments
CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)20 April 2023Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)
CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-00119 April 2023Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency