 Issue dateTitleTopic
ML18152B44517 August 1999Comment on Draft Rg DG-4006, Demonstrating Compliance with Radiological Criterial for License Termination.
ML20148M65118 June 1997Comment Opposing Proposed Suppl to Bulletin 96-001 That Would Request Licensees to Take Action to Ensure Continued Operability of Control RodsShutdown Margin
L-95-045, Comment on Proposed Rules 10CFR2,50 & 51 Re Decommissioning of Nuclear Power Reactors19 October 1995Comment on Proposed Rules 10CFR2,50 & 51 Re Decommissioning of Nuclear Power Reactors
ML18153A7581 September 1995Comment Supporting Review of Revised NRC SALP ProgramSystematic Assessment of Licensee Performance
ML18153A73028 April 1995Comment Supporting Proposed GL Re Pressure Locking & Thermal Binding of safety-related power-operated Gate ValvesStroke time
Backfit
ML20080M11227 February 1995Comment Re Proposed Suppl 5 to GL 88-20 IPEEE for Severe Accident Vulnerabilities. Proposed GL Suppl Should Indicate That Licensees Can Use Llnl Hazard Results of NUREG-1488 Re Revised Hazard Estimates Instead of NUREG/CR-5250
ML20076H96411 October 1994Comment Opposing Proposed Rule Re Pilot Program for NRC Recognition of Good Performance by Npps.Encourages NRC to Consider Comments Submitted by Nuclear Energy Institute on Behalf of Nuclear Power Industry
ML20073M07523 September 1994Comment on Proposed Rules 10CFR30,40,70 & 72 Re Clarification of Decommissioning Funding Requirements. Permitting Access to Funds Only on Semiannual Basis Seems Unnecessarily Restrictive
ML20069L52913 June 1994Comment Supporting Proposed Rulemaking 50-60 Re Petition for Rulemaking & Changes to 10CFR50.54
ML20029D82529 April 1994Comment Supporting Elimination of Proposed 5-yr Implementation Schedule & Believes That Current Programs Adequate to Maintain Containment IntegrityVT-2
ML20069G67730 December 1993Petition for Rulemaking PRM-50-59 Requesting Change to 10CFR26.80,10CFR50.54(p)(3),10CFR50.54(t) & 10CFR73.55(g)(4)Fitness for Duty
Systematic Assessment of Licensee Performance
ML20046D03826 July 1993Comment on Proposed Rules 10CFR170 & 171, FY91 & 92 Proposed Rule Implementing Us Court of Appeals Decision & Rev of Fee Schedules;100% Fee Recovery,FY93. Supports Rule
ML20045D80314 June 1993Comment on Proposed Rules 10CFR50 & 54, FSAR Submittals. Endorses Change in Regulation to Eliminate Confusion Re Two Refs to Existing Reporting Requirement
ML20044G19724 May 1993Comment Supporting Draft Insp Procedure Re Commercial Grade Procurement & Dedication
ML20044E57219 May 1993Comment Supporting Proposed Generic Ltr for Relocation of TS Tables on Instrument Response Time Limits
ML20044D3277 May 1993Comment Opposing Proposed GL Availability & Adequacy of Design Bases Info
ML20125B6143 December 1992Exemption from Requirements of 10CFR50,app a Re GDC-2 & 10CFR50.49 Re Environ Qualification of Electric Equipment Important to Safety for Nuclear Power PlantsSafe Shutdown
Tornado Missile
Design basis earthquake
Exemption Request
ML20099E10229 July 1992Comment Supporting Proposed Rule 10CFR50 Re Minor Mods to Nuclear Power Reactor Event Reporting Requirements
ML20095J68823 April 1992Comment Opposing Draft Reg Guide DG-1022, Emergency Planning & Preparedness for Nuclear Power Plants
ML20077R51614 August 1991Comment Supporting Petition for Rulemaking PRM-20-20 Re Reduced Total Effective Dose Equivalent to Individual Members of Public from 0.5 Rem (5 Msv) to 0.1 Rem (1 Msv)
ML20058D47519 October 1990Comment Supporting Proposed Rules 10CFR2,50 & 54 Re Nuclear Power Plant License RenewalLicense Renewal
ML20235N85314 February 1989Comment Supporting Chapter 1 Re Policy Statement on Exemptions Below Regulatory Concern.Policy Development for Criteria for Release of Radioactive Matl Needed for Development of Consistent Waste Mgt Practices
ML20235P3318 February 1989Comment Opposing Proposed Rules 10CFR50 & 55 Re Educ & Experience Requirements for Senior Reactor Operators & Supervisors at Nuclear Power Plants
ML20205Q15028 October 1988Comment on Proposed Rule 10CFR50 Re NUREG-1317, Regulatory Options for Nuclear Plant License Renewal. Safety Sys Functional Insps & Configuration Mgt Programs Support Renewal Basis as Opposed to Relicensing ProcessBackfit
ML20150A9004 July 1988Comment Opposing Proposed Rule 10CFR50 Re leak-before-break Technology.Further Use of Subj Technology for ECCS Would Reduce Safety Assurances & Safety Benefits.Experience Shows That pipe-thinning Progresses Faster than Expected
ML20150F1392 July 1988Comment Opposing Proposed Rule 10CFR50 Re Expansion of Applicability of Leak Before Break Technology to Functional & Performance Requirements for ECCS & Environ Qualification
ML20150B0001 July 1988Comment Opposing Proposed Rule 10CFR50 Re leak-before-break (LBB) Technology.Pipes Do Not Always Leak Before Breaking. NRC Has Accepted Faulty Assumptions as Facts Reaching Conclusion That LBB Eliminates Need for Insp.Addl Info EnclEarthquake
Backfit
ML20150A90530 June 1988Comment Opposing Proposed Rule 10CFR50 Re leak-before-break Technology for safety-related Equipment.Nrc Reliance on leak-before-break Is Irrational Response to Very Real Safety Problem.Nrc Should Implement Mandatory Piping InspEarthquake
ML20236P5859 November 1987Transcript of 871109 Briefing in Washington,Dc Re Facility Steam Generator Tube Rupture Event.Pp 1-56.Supporting Documentation EnclGrab sample
Nondestructive Examination
ML20235S93825 September 1987Comments on Draft NUREG-1150, Reactor Risk Ref Document. Results Are More Pessimistic than Results Obtained Under Idcor Program.Comment on NUREG-4550 EnclSafe Shutdown
ML20212E16625 February 1987Transcript of 870225 Briefing in Washington,Dc Re Facility Incident.Pp 1-82.Viewgraphs EnclNondestructive Examination
Earthquake
Fatality
ML20151B42724 February 1987Comment Opposing Proposed Rule 10CFR50 Re Licensing of Nuclear Power Plants Where State &/Or Local Govts Decline to Cooperate in Offsite Emergency PlanningChernobyl
ML20138N5311 November 1985Memorandum & Order Affirming ASLB 850903 Initial Decision Authorizing Director of NRR to Issue License Amend for North Anna to Permit Receipt & Storage of 500 Spent Fuel Assemblies from Surry Power Station.Served on 851101
ML20133K68018 October 1985Forwards Notice of Withdrawal of Appearance in Proceeding. Requests Svc List Be Revised to Include Client Under Listed Address.W/O Encl
ML20133K71718 October 1985Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl
ML20138A9529 October 1985Notice of Withdrawal of Appearance in Proceeding.Certificate of Svc Encl
ML20133F4249 October 1985Order Stating That ASLB 850903 Initial Decision Authorizing NRR to Amend OL to Permit Receipt & Storage of Spent Fuel Should Not Be Deemed Final,Pending Further Order. Served on 851009
ML20134N6983 September 1985Initial Decision LBP-85-34 Authorizing NRR to Issue Amends to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel Assemblies from Surry.Initial Decision Effective Immediately.Served on 850904Stolen
Fatality
ML20134N4383 September 1985Order Granting Licensee 850621 Request to Correct Transcript.Proposed Transcript Corrections & Certificate of Svc Encl.Served on 850904
ML20129K12518 July 1985Brief in Support of NRC 850718 Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Authorizing Issuance of Amend to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel Assemblies
ML20129K12818 July 1985Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Authorizing NRR to Issue Amend to Licenses NPF-4 & NPF-7 to Permit Receipt & Storage of 500 Spent Fuel AssembliesFatality
ML20129F82312 July 1985Reply Opposing Concerned Citizens of Louisa County post- Hearing Brief.Licensee Proposed Findings of Sabotage & Human Error Not Addressed.Challenge of NRC EIS Conclusion Unnecessary.Certificate of Svc Encl
ML20209F0028 July 1985Post-hearing Brief Re Issues Raised at ASLB 850521 & 22 Evidentiary Hearings.Nrc Required by NEPA to Evaluate Alternative of Constructing & Operating Dry Cask Storage Facility,But Failed to Perform Even Cursory Review
ML20128H0798 July 1985Order Granting Concerned Citizens of Louisa County 850627 Motion for 7-day Extension Until 850708 to File Proposed Findings of Fact & Conclusions of Law.Served on 850708
ML20209F2048 July 1985Proposed Findings of Fact & Conclusions of Law Re Application for Amend to Ol,Authorizing Licensee to Ship 500 Spent Nuclear Fuel Assemblies from Surry Power Station to North Anna Station.Certificate of Svc Encl
ML20128G94727 June 1985Motion for Extension of 850701 Deadline to File Proposed Findings of Fact & Conclusions of Law.Addl Wk Required Due to Addl Legal Duties.Certificate of Svc Encl
ML20127F04521 June 1985Post-hearing Brief Requesting Board Find in Util Favor Re Proposed OL Amend Authorizing Receipt & Storage of Up to 500 Spent Nuclear Fuel Assemblies.No Basis from Sabotage or Human Error Considerations for Denying Proposed Amend
ML20127F05121 June 1985Proposed Findings of Fact & Conclusions of Law Re Util 820713 Application to Amend Ol,Authorizing Receipt & Storage of Up to 500 Spent Nuclear Fuel Assemblies.Unsigned,Undated Order & Certificate of Svc EnclStolen
ML20128A77322 May 1985Transcript of 850522 Hearing in Charlottesville,Va.Pp 313-364.Supporting Documentation EnclFatality
ML20125C31921 May 1985Staff Exhibit S-2,consisting of Undated Safety Evaluation Re Increasing Spent Fuel Storage Capacity.Proposed Mods to Spent Fuel Pool & Transshipment/Storage of Spent Fuel AcceptableBoric Acid
Safe Shutdown Earthquake
Operating Basis Earthquake
Control of Heavy Loads
Fuel cladding