Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000272/202400230 July 2024Integrated Inspection Report 05000272/2024002 and 05000311/2024002Internal Flooding
Enforcement Discretion
Functionality Assessment
Aging Management
Significance Determination Process
Operability Determination
Pressure Boundary Leakage
Fire Protection Program
Power change
Operational leakage
IR 05000354/202400230 July 2024Integrated Inspection Report 05000354/2024002High Radiation Area
Stroke time
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Feedwater Heater
Integrated leak rate test
Operability Determination
Liquid penetrant
Fire Protection Program
Power change
Inattentive
IR 05000272/202450112 June 2024and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501Siren
IR 05000272/202401016 May 2024Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010Safe Shutdown
Very Low Safety Significance Issue Resolution
Fire Protection Program
IR 05000354/20240018 May 2024Integrated Inspection Report 05000354/2024001Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
Coast down
IR 05000354/20240107 May 2024Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010Commercial Grade Dedication
Probabilistic Risk Assessment
Temporary Modification
Aging Management
Large early release frequency
IR 05000272/20240017 May 2024Integrated Inspection Report 05000272/2024001 and 05000311/2024001Stroke time
Internal Flooding
Probabilistic Risk Assessment
Functionality Assessment
Open Phase Condition
Operability Determination
Fire Protection Program
Downpower
Operability Assessment
IR 05000272/20230045 February 2024Integrated Inspection Report 05000272/2023004 and 05000311/2023004
IR 05000354/20230041 February 2024Integrated Inspection Report 05000354/2023004Shutdown Margin
High Radiation Area
Internal Flooding
Enforcement Discretion
Operating Basis Earthquake
Functionality Assessment
Locked High Radiation Area
Missed surveillance
Significance Determination Process
Operability Determination
Fire Protection Program
IR 05000272/202340122 January 2024Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401
IR 05000354/202340122 January 2024Material Control and Accounting Program Inspection Report 05000354/2023401
IR 05000272/202300313 November 2023Integrated Inspection Report 05000272/2023003 and 05000311/2023003Boric Acid
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Maintenance Rule Program
Biofouling
Through Wall Leak
Fire Protection Program
Operability Assessment
IR 05000354/20230037 November 2023Integrated Inspection Report 05000354/2023003Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Scram Discharge Volume
Operability Determination
Fire Protection Program
Downpower
IR 05000272/202301012 October 2023Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010Safe Shutdown
Cyber Security
Significance Determination Process
Fire Protection Program
IR 05000272/202340212 October 2023and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only)Affidavit
IR 05000272/202300531 August 2023Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005)Fitness for Duty
Cyber Security
IR 05000354/202300531 August 2023Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005)Fitness for Duty
Cyber Security
License Renewal
IR 05000272/20230029 August 2023Integrated Inspection Report 05000272/2023002 and 05000311/2023002Safe Shutdown
Boric Acid
High Radiation Area
Fire Barrier
Internal Flooding
Fire impairment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Operability Determination
COVID-19
Fire Protection Program
Fire Watch
Dissimilar Metal Weld
Incremental Core Damage Probability Deficit
Power change
Operability Assessment
IR 05000354/20230103 August 2023Biennial Problem Identification and Resolution Inspection Report 05000354/2023010Safe Shutdown
Safe Shutdown Earthquake
Functionality Assessment
Operability Determination
IR 05000354/20230023 August 2023Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001Shutdown Margin
Packing leak
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
COVID-19
Fire Protection Program
IR 05000272/20230013 May 2023Integrated Inspection Report 05000272/2023001 and 05000311/2023001Safe Shutdown
Boric Acid
Enforcement Discretion
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Aging Management
Significance Determination Process
Design basis earthquake
Operability Determination
License Renewal
Fire Protection Program
Downpower
IR 05000272/20233011 May 2023Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301
IR 05000354/20230111 May 2023Commercial Grade Dedication Report 05000354/2023011Commercial Grade Dedication
IR 05000354/202300126 April 2023Integrated Inspection Report 05000354/2023001Safe Shutdown Earthquake
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Scram Discharge Volume
Operability Determination
Fire Protection Program
Power change
Downpower
IR 05000272/20230117 March 2023Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011Aging Management
IR 05000272/20220061 March 2023Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006)Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
COVID-19
IR 05000354/20220061 March 2023Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000272/202200431 January 2023Integrated Inspection Report 05000272/2022004 and 05000311/2022004Safe Shutdown
Boric Acid
Mission time
Internal Flooding
Enforcement Discretion
Functionality Assessment
FLEX
Aging Management
Significance Determination Process
Operability Determination
License Renewal
Fire Protection Program
Downpower
Loss of condenser vacuum
IR 05000354/202200424 January 2023Integrated Inspection Report 05000354/2022004High Radiation Area
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
FLEX
Operability Determination
Fire Protection Program
IR 05000272/20220116 January 2023Design Basis Assurance Inspection (Programs) Inspection Report 05000272/2022011 and 05000311/2022011Power-Operated Valves
ML22335A0411 December 2022Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for InformationCommercial Grade Dedication
IR 05000272/20220039 November 2022Integrated Inspection Report 05000272/2022003 and 05000311/2022003Ultimate heat sink
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Missed surveillance
Significance Determination Process
Surveillance Frequency Control Program
Feedwater Heater
Eddy Current Testing
Operability Determination
Fire Protection Program
Grace period
IR 05000354/20220033 November 2022Integrated Inspection Report 05000354/2022003Internal Flooding
Temporary Modification
Functionality Assessment
Scram Discharge Volume
Operability Determination
Fire Protection Program
Downpower
Coast down
IR 05000354/202230124 October 2022Initial Operator Licensing Examination Report 05000354/2022301
IR 05000354/202240214 October 2022Cyber Security Inspection Report 05000354/2022402 - Cover Letter OnlyCyber Security
Affidavit
IR 05000272/202240214 October 2022Cyber Security Report 05000272/2022402 and 05000311/2022402 - Cover Letter OnlyCyber Security
Affidavit
IR 05000354/20220128 September 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000354/2022012Scram Discharge Volume
Containment Hardened Vent
Power-Operated Valves
IR 05000272/202200531 August 2022Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
COVID19
IR 05000354/202200531 August 2022Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2022005)Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
COVID19
IR 05000354/202200210 August 2022Integrated Inspection Report 05000354/2022002Safe Shutdown
Ultimate heat sink
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Finite Element Analysis
Condition Adverse to Quality
High Energy Line Break
Significance Determination Process
Operability Determination
Through-Wall Leak
Fire Protection Program
IR 05000272/20220028 August 2022Integrated Inspection Report 05000272/2022002 and 05000311/2022002Safe Shutdown
Boric Acid
Packing leak
High Radiation Area
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
FLEX
B.5.b
Missed surveillance
Surveillance Frequency Control Program
Operability Determination
Moisture barrier
Fire Protection Program
Power change
Overspeed trip
Thermography
IR 05000272/202240121 July 2022and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only)Affidavit
IR 05000272/202250114 June 2022and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2022501, 05000272/2022501, and 05000311/2022501Earthquake
Siren
IR 05000272/20220014 May 2022Integrated Inspection Report 05000272/2022001 and 05000311/2022001Stroke time
Internal Flooding
Functionality Assessment
Missed surveillance
Operability Determination
Fire Protection Program
Operability Assessment
Unidentified leakage
IR 05000354/20220012 May 2022Integrated Inspection Report 05000354/2022001Stroke time
Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
Power change
Downpower
IR 05000272/202230127 April 2022Initial Operator Licensing Examination Report 05000272/2022301 and 05000311/2022301
IR 05000354/202201016 March 2022Triennial Fire Protection Inspection Report 05000354/2022010Safe Shutdown
Probabilistic Risk Assessment
Fire impairment
Significance Determination Process
Fire Protection Program
Fire Watch
IR 05000272/202101310 March 2022Evaluation of Changes, Tests, and Experiments Baseline IR 05000354/2021013, 05000272/2021013 and 05000311/2021013 & ISFSI IR 07200048/2021001 Related to PSEG Evals of Stations & Planned Wind Port Manufacturing FacilitySignificance Determination Process
IR 05000354/20210062 March 2022Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2021006)Cyber Security
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000272/20210062 March 2022Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006)Cyber Security
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19