Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML16067A1442016-01-28028 January 2016 SEP-ISI-PNPS-002, Rev 2, Pilgrim, Fifth Ten-Year Interval Inservice Inspection (Isi/Iwe) Program Plan. ML15237A2582015-08-20020 August 2015 Refueling Outage (RFO)-20, In-Service Inspection (ISI) Owners Activity Report (OAR-1) Submittal ML14091A4072014-03-25025 March 2014 Relief Request PRR-25 Rev. 1, Proposed Alternative, Request for Relief for Temporary Acceptance of a Flaw in Salt Service Water (SSW) System Pipe Spool JF29-8-4 ML11230A9192011-08-0505 August 2011 Revised Relief Request (PRR)-21, Contingency Repair Plan for Reactor Pressure Vessel (RPV) Standby Liquid Control Nozzle Weld, RPV-N14-1 ML11235A7292011-07-27027 July 2011 Refueling Outage (RFO)-18 In-Service Inspection (ISI) Owner'S Activity Report (OAR-1) Submittal ML0924505922009-08-24024 August 2009 Submittal of Refueling Outage (RFO) -17 In-Service Inspection (ISI) Owners Activity Report (OAR)-1 CNRO-2009-00003, Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activ2009-03-17017 March 2009 Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activities ML0811507162008-04-16016 April 2008 Request for Approval of Proposed Relief Request VR-4A to Extend 5-Year Test Interval on a One-Time Basis for One Main Steam Safety Valve RV-203-4A, Transmittal of Inservice Testing Relief Request No. RV-07, Letter No. 2.08.021 ML0721802372007-07-31031 July 2007 Refueling Outage 16, Inservice Inspection (ISI) Summary Report ML0714301882007-05-16016 May 2007 Third Ten-Year ISI Interval Relief Request, PRR-42, Examinations of Component Welds with Less than Essentially 100% Examination Coverage ML0521602742005-07-29029 July 2005 Inservice Inspection Summary Report for Refuel Outage 15 ML0507404042005-03-0707 March 2005 2005 On-Line and Refueling Outage (RFO) - 15 Inservice Inspection (ISI) Plan ML0506303972005-02-24024 February 2005 Fourth Ten-Year In-service Testing (IST) Program, IST Relief Request PR-03 (TAC N0.MB8779) ML0416203922004-06-0202 June 2004 Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station, Fourth Ten-Year In-service Testing (IST) Program, IST Relief Requests: PR-03 (TAC No. MB8779), VR-03 (MB8777), VR-04 (MB8778), and VR-06 (MB8780) JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs2004-04-14014 April 2004 Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs ML0325911412003-09-0808 September 2003 Startup Test Report Cycle 15 ML0322500572003-08-0101 August 2003 Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Summary Report ML0707902282003-07-0808 July 2003 RF014 ISI Summary Report for NRC Submittal with Attachment ML0715602512003-04-27027 April 2003 CR-PNP-2003-01618 with Supporting Report (with Redacted Notes) 1st Page for Inspector ML0311301182003-04-14014 April 2003 2003 On-Line and Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Plan 2016-01-28
[Table view] Category:Letter
MONTHYEARML24344A0692024-12-0909 December 2024 Proof of Financial Protection 10 CFR 140.15 IR 05000293/20240032024-11-20020 November 2024 Decommissioning International, Llc., Pilgrim Nuclear Power Station - NRC Inspection Report 05000293/2024003 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) L-24-008, Reply to a Notice of Violation EA-2024-0232024-03-29029 March 2024 Reply to a Notice of Violation EA-2024-023 IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) 2024-09-18
[Table view] |
Text
SEn tergy Entergy Nuclear Operations, Inc, Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 August 20, 2015 U.S. Nu~clear Regulatory Commission ATTFN: Document Control Desk Washington, -DC 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Pilgrim Refueling Outage (RFO)-20 In-Service Inspection (ISI) Owners Activity Report (OAR-I) Submittal LETTER NUMBER: 2.15.060
Dear Sir or Madam:
By this letter Entergy submits to the NRC the attached Pilgrim Nuclear Power Station (PNPS)
In-Service Inspection (ISI) Owners Activity Report (OAR-I) for Operating Cycle 20.
This report has been prepared in accordance with ASME Section XI 2001 with 2003 addenda and NRC approved Code Case N-532-5, and has been certified by the Authorized Nuclear Inservice Inspector (AN II) attesting that all code-required examinations and repair/replacement activities at PNPS during Cycle 20 were performed in accordance with the requirements of the ASME XI Code.
There are no new commitments made in this letter.
If you have any questions regarding the information contained in this letter, please contact me at (508) 830-8323 or Murray Williams at (508) 830-8275.
Sincerely, Everett P. (Chip) Perkins, 'r.
Regulatory Assurance Manager EPP/mw
Attachment:
Engineering Report No. PNpS-RPT-15-00003, Rev. 0 "PNPS Owners Activity Report (OAR-I) for Cycle 20" (3 pages)
Letter Number: 2.15.060 Page 2 of 2 cc: Mr. Richard Guzman, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-802 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-1 415 NRC Senior Resident Inspector Pilgrim Nuclear Power Station
Attachment To PNPS Letter 2.15.060 Engineering Report No. PNPS-RPT-15-00003, Rev. 0 "PNPS Owners Activity Report (OAR-I) for Cycle 20" (3 pages)
FOURTH INTERVAL PNPS-RPT-1 5-00003 THIRD PERIOD REFUEL OUTAGE 20 ATTACHMENT 9.1 ENGINEERING REPORT COVER SHEET & INSTRUCTIONS Engineering Report No. PNPS-RPT-I15-00003 Rev 0 Page 1 of 3 ENTERGY NUCLEAR Engineering Report Cover Sheet Engineering Report
Title:
PNPS OWN*2ERS ACTIVITY REPORT (OAR-I) FOR CYCLE 20 Engineering Report Type:.
New [] Revision LI Cancelled LI Superseded Superseded by:
LI Applicable Site(s)
LI 1P3 LI JAF LI PNPS LI VY LI wpo LI AuNOI LI ANO2 LI ECH LI GGNS [] RBS WF3 [] PLP LI EC No. N/_AA RepOrt Origin: []Entergy LI Vendor Vendor Document No.: N/A Quality-Related: [] Yes [] No Prepared by: R. Pardee / ** 'A4.* Date: _:29z-/:-
Responsible Engineer (Print Naine/Sign)
Reviewed by: K. Bienvenue / K- t41kL Date:
Reviewer (Print Name/Sign)
Approved by: Elizabeth York (HSB) ~ z)f//*7*Date:
ANII (Print Name/Sign) #*.r4yio./,*t**-
Approved by: 7-2q -I Supervisor / Manager (Print Name/Sign) page 1 of 3 page of 3EN-DC-i147 Rev.6
FOURTH INTERVAL PN PS-RPT-1 5-00003 THIRD PERIOD REFUEL OUTAGE 20 FORM OAR-I OWNERS ACTIVITY REPORT Report Number PNPS-RPT-1 5-00003 Plant PILGRIM NUCLEAR POWER STATION. 600 Rocky Hill Road. Plymouth, MA 02360 (Name and Address of Plant)
Plant Unit 1 Commercial Service Date June 8. 1972 Refueling Outage Number 20 th Current Inspection Interval- 4 (1st, 2nd, 3rd, 4th, Other)
Current Inspection Period 3rd (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the Inspection Plan 1998 Edition, 2000 Addi enda Date and Revision of Inspection Plan: PNPS ISI Proaqram Plan. No. SEP-ISI-PNPS-001 Rev.3 Edition and Addenda of ASME Section Xl applicable to Repairs and Replacements, ifdifferent than the Inspection Plan 2001 Edition. 2003 Addenda Code Cases used for inspection and evaluation: N-51 3-4, N-71 6, N-702 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made inthis report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RFO20 conform to the requirements of Section XI.
Signed R. Pardee / Sr Engineer *_ Date -. -/
Owner or Owner' s designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by HSB Global Standards have inspected the components described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all the activities represented by this report in accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commisin //'* 'p FT//.*'I A,*-C_
-- =*__*/_"* National Board, State, Provi'nce, and Edndorsements Insl)e*s Sig*ture d.*
/*,,#/*-J Date Date / 0~
EN-DC-147 Rev.6 page 2 page of 3 2 of 3 EN-DC-147 Rev.6
FOURTH INTERVAL PNPS-RPT-1 5-00003 THIRD PERIOD REFUEL OUTAGE 20 TABLE 1 ITrEMS wrlTH FLAWS OR RELEVANT CONDITI*ONS THAT REQUIRED EVALUATI[ON FOR CONTI[NUED SERVICE Examination Category and Item Number Itern Description Evaluation Description D-B 1 D2.10 Salt Service Water pipe spool JF2g-8-4 thru-wall Through-wall leakage of carbon steel service water pipe spool due leakage to localized degradation of internal rubber lining was evaluated and determined operable but degraded/nonconforming with compensatory measures (CR-PNP-2014-081 5). The leakage was determined to be a housekeeping concern only as the leak was located downstream of the RBCCW and TBCCW heat exchangers and therefore did not impact the ability of the Salt Service Water system to perform its safety function. The flaw was evaluated using methodology detailed in Code Case N-5I13-4 and was submitted for NRC approval in relief request PRR-25 (Entergy letter 2.14.023 dated 3/5/14). The condition was corrected in May 2014 during a
_______________lant shutdown when the spool was replaced.
E-A I El .11 IWE General Visual Walkdown areas of Primary containment determined to be operable with the degraded degraded primary containment coatings conditions accepted for continued service with continued monitoring. Debris loading for ECCS suction strainers was evaluated and determined to be acceptable based on actual weight of debris (flaking paint) compared to design allowable limits (CR-
_____________________________________________PNP-201 5-4375).
TABLE 2 ABSTRACT OF REPAIRIREPLACEMENT ACTIVITIES REQUI[RED FOR CONTI[NUED SERVICE Code Class I[tem Description Date RepairlReplacement
______ Description Of Work Completed Plan Number 3 Replacement Salt Service Water pipe spool JF2g-8-4 5/16114 375247-06
_________ _____________replaced ______
1 Replacement Feedwater check valve 6-CK-62A hinge 5117/14 365394-02 & 365394-18
_________ _____________pin covers replaced______
I Replacement RPV washers at stud locations 23, 24 & 5/19/15 413547-01
_____ ________ _____ ____ 43.__ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
page 3 of 3 page of 3EN-DC-147 Rev.6