---Entergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 July 29, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Pilgrim Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Summary Report REFERENCE 1. Entergy Letter No. 2.05.018, Pilgrim Station 2005 On-Line and Refueling Outage (RFO) - 15 Inservice Inspection (ISI) Plan, dated March 7, 2005 LETTER NUMBER: 2.05.062

Dear Sir or Madam:

The enclosed report provides a tabulation of all inservice examinations and code repairs/replacements performed at Pilgrim Station from the end of RFO-14 through RFO-15.

The scope of RFO-15 inservice inspection was described in Reference 1. Copies of examination vendor reports and data sheets are retained at Pilgrim Station for NRC review, if required.

This submittal fulfills the requirements of ASME Section Xl, 1989 Edition, Paragraph IWA-6230.

There are no commitments contained in this letter.

If you have any questions regarding the information contained in this letter, please contact me at (508) 830-8403.

Sincerely,

_D Bryan S. Ford Manager, Licensing

Enclosure:

Inservice Inspection Summary Report for Refuel Outage 15 at Pilgrim Nuclear Power Station, dated April 2005 (32 pages)

,4'1 205062

Entergy Nuclear Operations, Inc. Letter Number: 2.05.062 Pilgrim Nuclear Power Station Page 2 cc: Mr. James Shea, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. NRC, Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station 205062

I RFO15 INSERVICE INSPECTION

SUMMARY

REPORT FOR REFUEL OUTAGE 15 AT PILGRIM NUCLEAR POWER STATION APRIL 2005 Prepared by Date Z Approved b ye DateE Aty 8foiS:7t V -- 7/l9q

Table of Contents 1.0 Executive Summary 1.1 Tables Table 1 Scheduled ISI Examinations Performed On-line Prior to RFO#15 by Entergy and Washington Group International Table 2 Scheduled ISI Examinations Performed During RFO#15 by Entergy, General Electric and Washington Group International Table 3 Scheduled RFO15 Flow-Accelerated Corrosion Examinations Table 4 Miscellaneous ISI Visual Examinations Performed 2003-2005 Table 5 Miscellaneous NDE Examinations Performed 2003-2005 Table 6 RFO15 ISI and FAC Maintenance Requests Table 7 ISI Corrective Action Documents 2003-2005 2.0 NIS-1 and NIS-2 Code Report Forms for ASME XI Repairs and Replacements 2.1 RFO15 NIS-1 Form 2.2 RFO15 NIS-2 Forms 3.0 Referenced ISI Vendor and Data Reports (on file at Pilgrim) 3.1 Washington Group International Final Report of Inservice Examinations at Pilgrim Station prior to and during Refueling Outage 15 (2 volumes) 3.2 General Electric ISI Final Report for PNPS RFO15 Nozzle and RPV Head Examinations (2 volumes) 3.3 Framatome and IHI Southwest Corp. Final Report of Reactor Pressure Vessel Shell Weld Examinations at Pilgrim Station during Refueling Outage 15 (1 volume) 3.4 General Electric Corp. Final Report of Invessel Examinations at Pilgrim Station during Refueling Outage 15 (1 volume) 3.5 RFO15 Miscellaneous ISI Data Reports by Entergy (1 volume) 3.6 General Electric Equipment Certifications for PNPS RFO15 ISI Nozzle and RPV Head Examinations (1 volume)

1.0 EXECUTIVE

SUMMARY

This report documents the inservice inspection (ISI), preservice inspection (PSI) and augmented examinations performed at Pilgrim Nuclear Power Station (PNPS) for the period from the end of Refueling Outage 14 to the end of Refueling Outage 15. The examinations performed for all ASME Section XI code categories are included in the third period of the Third Ten Year Inspection Interval of the PNPS ISI Program. RFO#15 is the final refueling outage in Pilgrim Station's third inspection interval.

Pilgrim has inspected Class 1 category B-J and B-F welds since 2001 (RFO13) using a partial-scope Risk-Informed ISI Program in accordance with NRC Safety Evaluation Report (TAC No. MB0841) as detailed in NRC letter to Entergy 1.1.01.046. Pilgrim also employs BWRVIP-75 scheduling guidelines for Category C, D and E austenitic stainless steel piping welds in accordance with the NRC Safety Evaluation Report (TAC No. MA5012) dated September 15, 2000 as an alternative to Generic Letter 88-01 inspection schedules.

Tvpes of examinations performed:

  • ASME XI inservice and preservice visual, surface and volumetric examinations of piping, bolting, valves and supports.
  • ASME XI subsection IWE visual and ultrasonic examinations of containment per PNPS procedure NE 15.14.
  • Augmented UT examinations of high energy piping for flow-assisted corrosion (FAC) per Generic Letter 89-08 and Specification M-577.
  • Visual examination of invessel Core Spray piping and spargers, jet pumps, shroud, shroud supports, steam dryer, guide rods, surveillance specimen holders and vessel interior surfaces in accordance with BWRVIP guidelines.
  • System pressure tests for ISI Class 1, 2 and 3 components for the third period of the Third Ten Year Interval ISI Program.

Examination Details Piping, bolting and valve examinations were conducted in accordance with ASME Section XI 1989 edition, Code Case N-491 for supports and Entergy letter to NRC 1.2.05.018 which provided the scope of the on-line and RFO#15 outage examinations. Containment examinations were performed in accordance with ASME XI 1992 edition with 1992 Addenda subsection IWE as modified by the Code of Federal Regulations. Washington Group International (WGI) Corp. was the vendor for a portion of the online scope and all non-vessel manual ISI examinations performed during the refueling outage. Framatome Corp. performed all Reactor Pressure Vessel vertical shell weld ultrasonic examinations during RFO15. General Electric Corp. performed all nozzle (automated and manual ultrasonic) and RPV head weld ultrasonic and invessel visual (IVVI) examinations during the outage. Entergy Quality Assurance personnel performed the balance of on-line examinations prior to RFO#15.

Regarding Entergy letter 1.2.05.018, "Pilgrim Station 2005 On-Line and RF015 Inservice Inspection (ISI) Plan":

All scheduled code examinations described in the ISI plan letter were completed.

The remaining four RPV vertical shell welds were examined during RFO15 using the Framatome/IHI AIRIS remote scanning tool to the maximum extent possible given the access restrictions caused by the presence of the shroud repair tie-rods.

A total of 34 ultrasonic examinations for the detection of flow-assisted corrosion on carbon steel piping were performed in accordance with Generic Letter 89-08.

Various system pressure tests for ISI Class 1, 2 and 3 piping were conducted for the third period of the Third Interval ISI Program.

A total of 35 Condition Reports were issued which are tabulated in Table 7. Some of the findings are detailed below:

  • A fabrication-related indication of rejectable size was detected in RFO15 during automatic UT examination of the N2F safe end dissimilar metal weld (CR-PNP-2005-1916). The indication was determined to be lack of fusion created by the welding process during installation in 1984. The indication was located mid-wall and was not connected to the pipe inside surface.
  • Two RPV head welds were found in RFO15 to contain UT indications of rejectable size (CR-PNP-2005-1870 & 1871). These indications were non-ID connected, fabrication-related 'Upjohn'-type indications caused by the vertical progression welding process used during construction.
  • A rejectable UT indication was detected in SBLC socket weld B-1 1-79 in RF015 as part of the risk-informed ISI Program at PNPS (CR-PNP-2005-1639). An excavation of the weld revealed the source of the UT indication to be lack of fusion between weld passes during installation. The weld was subsequently replaced.
  • A number of RPV safe end welds in RFO15 were found to have wall thickness in some areas less than the screening criteria provided by Engineering (CR-PNP-2005-1657, 1770, 1830 & 1893). Upon evaluation, it was determined that none of the areas had wall thickness values that were less than design minimums.
  • A number of Recirculation system N1 and N2 nozzle-to-safe end dissimilar metal welds (CR-PNP-2005-1827 & 1895) had existing surface profile conditions that prevented automated UT scanning equipment from obtaining the PDI-required UT coverage of >90% in the circumferential scan direction (for axial indications). In areas where grinding could improve UT coverage, the adverse weld profile conditions were reduced to the maximum extent possible without approaching design minimum wall thickness values in order to maximize UT coverage.
  • The capped CRD return N10 nozzle-to-safe end weld 3-I-1 was overlaid with Inconel 52 after leakage was discovered mid-cycle in October 2003 (CR-PNP-2003-3719). The leak occurred at the location of a previous weld repair made during installation of the Inconel nozzle cap in 1977. The weld overlay received all code-required preservice NDE examinations and was pressure tested prior to returning to service.

In-Vessel Examinations (by General Electric)

All code in-vessel visual examinations stated in Entergy Letter to NRC #ELNRC 1.2.05.018 were completed during RFO15. The report of all in-vessel inspection activities performed at Pilgrim Station during RFO15 has been provided to EPRI for inclusion in the BWRVIP database.

Containment Examinations (IWE)

Augmented and program examinations were performed for the containment IWE examination program in accordance with PNPS procedure NE 15.14 and ASME XI 1992 edition with 1992 Addenda as modified by the Code of Federal Regulations.

1.1 TABLES Table 1 ISI EXAMINATIONS PERFORMED ON-LINE PRIOR TO RF015 by Entergy and Washington Group International

.COMPONENT DESCRIPTION. ".'..CATEGORY -SYSTEM DRAWING- EXAM 14-P215A-HL PUMP INTEGRAL ATTMT C-C CS ISI-P215A MT GB-14-22HL1 (4) SUPPORT LUGS C-C Cs ISI-I-14-2B VT-1 ALTERNATE GB-14-28HL2(4) SUPPORT LUGS C-C Cs ISI-1-14-2A MT DB-23-51 HL1 (4) SUPPORT LUGS C-C HPCI ISI-1-23-5 MT HL-23-69HL1 (24) SUPPORT LUGS C-C HPCI ISI-1-23-3 MT 10-P203A-HL PUMP INTEGRAL ATTMT C-C RHR ISI-P203A MT HB-10-83PS PIPE STANCHION C-C RHR ISI-1-10-1B MT HL-10-79PS PIPE STANCHION C-C RHR ISI-1-10-5BSH1 MT GB-14-3-4D PIPE TO WELDOLET C-F-2 Cs ISI-I-14-2B MT HD-14-F91 TEE TO REDUCER C-F-2 Cs ISI-1-14-2A MT UT HL-23-4-1 B ELBOW TO REDUCER C-F-2 HPCI ISI-1-23-3 MT UT HE-26-F170 PIPE TO ELBOW C-F-2 RCIC ISI-1-13-5 MT UT HE-26-F238 VALVE TO PIPE C-F-2 RCIC ISI-1-13-5 MT UT GB-10-10-2C TEE TO REDUCING ELBOW C-F-2 RHR ISI-1i 0-5BSH2 MT UT GB-10-F179 VALVE TO PIPE C-F-2 RHR ISI-I--0-4BSH1 MT UT GB-10-F239 ELBOW TO PIPE C-F-2 RHR ISI-1-10-4BSH2 MT UT GB-10-F28 REDUCING ELBOW TO ELBOW C-F-2 RHR ISI-1-1 0-5BSH2 MT UT GB-10-F45 PIPE TO ELBOW C-F-2 RHR ISI-1-1 0-4BSH2 MT UT GB-10-F52A PIPE TO ELBOW C-F-2 RHR ISI-1-10-4BSH1 MT UT GB-10-F70 ELBOW TO TEE C-F-2 RHR ISI-1-1 0-4BSH1 MT UT HB-10-3003-2-2 PIPE TO ELBOW C-F-2 RHR ISI--i10-1C MT UT HB-10-F79 VALVE TO ELBOW C-F-2 RHR ISI-1-10-1C MT UT HL-10-F107 ELBOW TO PIPE C-F-2 RHR ISI-1-10-4ASHI MTUT HL-10-F200R VALVE TO PIPE C-F-2 RHR ISI-1-10-4ASHI MT UT HL-10-F73 PIPE TO NOZZLE C-F-2 RHR ISI-1-10-5BSH1 MT UT HL-10-F76 ELBOW TO NOZZLE C-F-2 RHR ISI-1-10-5BSHI MT UT GB-14-VBW36A-1 VALVE BODY WELD C-G CS ISI-1-14-2A MT GB-14-VBW36A-2 VALVE BODY WELD C-G Cs ISI-1-1 4-2A MT GB-i0-VBW67A-1 VALVE BODY WELD C-G RHR ISI-1-10-3A MT GB-10-VBW67A-2 VALVE BODY WELD C-G RHR ISI-1-1 0-3A MT GL-10-VBW23A-1 VALVE BODY WELD C-G RHR ISI-1-1 0-4ASH2 MT GL-i0-VBW23A-2 VALVE BODY WELD C-G RHR ISI-1-1 0-4ASH2 MT i 9-E206A-HL HX INTEGRAL ATTMT D-B RBCCW ISI-E206A VT-3 HE-30-29PS STANCHION D-B RBCCW ISI-1-30-2SH2 VT-3 HE-30-31 HL HANGER LUG D-B RBCCW ISI-1-30-2SH2 VT-3 HE-30-438PS STANCHION D-B RBCCW ISI-1-30-ISH1 VT-3 HE-30-439PS STANCHION D-B RBCCW ISI-1-30-1 SH1 VT-3 HE-30-43HL(4) HANGER LUGS D-B RBCCW ISI-1-30-I SH2 VT-3 HE-30-57HL HANGER LUG D-B RBCCW ISI-1-30-1 SH1 VT-3 HE-30-61 HL HANGER LUG D-B RBCCW ISI-1-30-ISHI VT-3 HE-30-61 PS STANCHION D-B RBCCW ISI-1-30-2SHI VT-3 HE-30-63HL HANGER LUG D-B RBCCW ISI-1-30-2SH1 VT-3 Page 1 of 2

Table 1 ISI EXAMINATIONS PERFORMED ON-LINE PRIOR TO RF015 by Entergy and Washington Group International COMPONENT -'.- DESCRIPTION: i-l. : .; - - CATEGORY-- . SYSTEM HE-30-64HL HANGER LUG D-B RBCCW ISI-1-30-2SHI VT-3 H-50-1-TORUSBAY1 TORUS SUPPORTS F-A CONT CIA175SHI & CIA-62-4 VT-3 IWE H-3-1 -17 RIGID SUPPORT F-A CRD 151-1-3-i VT-3 H-14-1-33 RIGID HANGER F-A CS ISI+1-4-213 VT-3 H-23-1-11 SPRING HANGER F-A HPCI ISI-1-23-2 VT-3 H-23-1-3 RIGID HANGER F-A HPCI ISI-1-23-5 VT-3 H-23-1-8 SPRING HANGER F-A HPCI ISI-1-23-2 VT-3 H-23-1 -P205 PUMP SUPPORT F-A HPCI ISI-1-23-4 VT-3 H-19-1 -E206A HT EX SUPPORT F-A RBCCW ISI-E206A VT-3 H-30-1-119 RIGID HANGER F-A RBCCW ISI-I30-1 SH1 VT-3 H-30-1 -E122A HT EX SUPPORT F-A RBCCW ISI-E1 22A VT-3 H-30-1-E209A HT EX SUPPORT F-A RBCCW ISI-E209A VT-3 H-30-1-P202A PUMP SUPPORT F-A RBCCW ISI-P202A VT-3 H-1 0-1 -12 SPRING HANGER F-A RHR ISI-1-1 0-513SH2 VT-3 H-10-1-120 SPRING HANGER F-A RHR ISI-I-iO-i13 VT-3 H-10-1-155 SPRING HANGER F-A RHR ISI-1-i10-4ASH1 VT-3 H-10-1-164 RIGID HANGER F-A RHR ISI-1-i 0-41BSH2 VT-3 H-10-1-280 LATERAL RESTRAINT F-A RHR ISI-1-10-4ASH1 VT-3 H-10-1-55 RIGID SUPPORT F-A RHR ISI-I-10-213 VT-3 H-10-1 -92S SPRING HANGER F-A RHR S+15Ii0-313 VT-3 H-10-1-SG17 LATERAL RESTRAINT F-A RHR S+15Ii0-213 VT-3 H-10-1 -SGI 8 RESTRAINT F-A RHR 15S-I-i10-2A VT-3 H-10-1 -SGi9 RESTRAINT F-A RHR ISI-1-1O-1B VT-a H-10-1 -SG22 LATERAL RESTRAINT F-A RHR 15S--1i10-3A VT-3 H-29-1-25 RIGID HANGER F-A SSW ISI+I29-1S5H2 VT-3 Page 2 of 2

Table 2 ISI EXAMINATIONS PERFORMED DURING RF015 by Entergy, General Electric and Washington Group International

COMPONENT 7,_____' DESCRIPTION'
_ *-S CATEGORY - SYSTEM - - DRAWING - 'EXAM 'I RPV-BH-C1 HEAD CIRCUMF WELD B-A RPV ISI-1-54-3 UT RPV-BH-M1 MERID HEAD WELD 40 B-A RPV ISI-1-54-3 UT RPV-BH-M10 MERID HEAD WELD 65 B-A RPV ISI-1-54-3 UT RPV-BH-M11 MERID HEAD WELD 125 B-A RPV ISI-1-54-3 UT RPV-BH-M12 MERID HEAD WELD 185 B-A RPV ISI-1-54-3 UT RPV-BH-M13 MERID HEAD WELD 245 B-A RPV ISI-1-54-3 UT RPV-BH-M14 MERID HEAD WELD 305 B-A RPV ISI-1-54-3 UT RPV-BH-M2 MERID HEAD WELD 85 B-A RPV ISI-1-54-3 UT RPV-BH-M3 MERID HEAD WELD 130 B-A RPV ISI-1-54-3 UT RPV-BH-M4 MERID HEAD WELD 175 B-A RPV ISI-1-54-3 UT RPV-BH-M5 MERID HEAD WELD 220 B-A RPV ISI-1-54-3 UT RPV-BH-M6 MERID HEAD WELD 265 B-A RPV ISI-1-54-3 UT RPV-BH-M7 MERID HEAD WELD 310 B-A RPV 1S1-1-54-3 UT RPV-BH-M8 MERID HEAD WELD 355 B-A RPV ISI-1-54-3 UT RPV-BH-M9 MERID HEAD WELD 5 B-A RPV ISI-1-54-3 UT RPV-HF-240-360 HEAD TO FLANGE B-A RPV ISI-1-54-2 MT UT RPV-L-1-338A LOWER INTERMEDIATE SHELL VERTICAL WELD B-A RPV IS1-1-54-1 UT RPV-L-1-338C LOWER INTERMEDIATE SHELL VERTICAL WELD B-A RPV ISI-1-54-1 UT RPV-L-2-338A LOWER SHELL VERTICAL WELD B-A RPV 1SI-1-54-1 UT RPV-L-2-338C LOWER SHELL VERTICAL WELD B-A RPV ISI-1-54-1 UT RPV-TH-C HEAD CIRCUMF WELD B-A RPV ISI-1-54-2 UT RPV-TH-M4 MERID HEAD WELD 135 B-A RPV ISI-1-54-2 UT RPV-TH-M5 MERID HEAD WELD 180 B-A RPV ISI-1-54-2 UT RPV-TH-M6 MERID HEAD WELD 225 B-A RPV ISI-1-54-2 UT RPV-TH-M7 MERID HEAD WELD 270 B-A RPV ISI-1-54-2 UT RPV-TH-M8 MERID HEAD WELD 315 B-A RPV ISI-1-54-2 UT RPV-N1 B-NIR NOZZLE INNER RADIUS B-D RPV 1SI-1-54-1 UT RPV-N1 B-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-1 UT RPV-N2G-NIR NOZZLE INNER RADIUS B-D RPV ISI-1-54-1 UT RPV-N2G-NV NOZZLE TO VESSEL B-D RPV 1S1-1-54-1 UT RPV-N2H-NIR NOZZLE INNER RADIUS B-D RPV IS1-1-54-1 UT RPV-N2H-NV NOZZLE TO VESSEL B-D RPV 1S1-1-54-1 UT RPV-N2K-NIR NOZZLE INNER RADIUS B-D RPV ISI-1-54-1 UT RPV-N2K-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-1 UT RPV-N7A-NIR NOZZLE INNER RADIUS B-D RPV ISI-1-54-2 UT RPV-N7A-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-2 UT RPV-N7B-NIR NOZZLE INNER RADIUS B-D RPV ISI-1-54-2 UT RPV-N7B-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-2 UT RPV-N8-NIR NOZZLE INNER RADIUS B-D RPV ISI-1-54-2 UT RPV-N8-NV NOZZLE TO VESSEL B-D RPV 1S1-1-54-2 UT RPV-N11-NV PART PENET NOZZLE B-E RPV 1S1-1-12-ISHI VT-2 RPV-N14-NV PART PENET NOZZLE B-E RPV 151-I-1l-1 EVT-2 RPV-N15A-NV PART PENET NOZZLE B-E RPV ISI-1-54-1 EVT-2 RPV-N15B-NV PART PENET NOZZLE B-E RPV ISI-1-54-1 EVT-2 RPV-N16A-NV PART PENET NOZZLE B-E RPV ISI-1-54-1 EVT-2 Page 1 of 4

Table 2 ISI EXAMINATIONS PERFORMED DURING RF015 by Entergy, General Electric and Washington Group International

[COMPONENT -, ;, t- _ " '. .: - .. 17 DESCRIPTION ; - :;: -- - ,-z , , -, , , c CATEGORY i-, -SYSTEM. DRAWING . t , , . -EXAM 7 RPV-N16B-NV PART PENET NOZZLE B-E RPV ISI-1-54-1 EVT-2 14-A-10A VALVE TO PIPE B-F Cs ISI-1-14-1 UT 14-A-3 PIPE TO REDUCER B-F Cs ISI-1-14-1 AUTO UT 14-B-10A VALVE TO PIPE B-F Cs ISI-1-14-1 UT 14-B-3 PIPE TO REDUCER B-F Cs ISI-1-14-1 AUTO UT 14-A-1 SAFE END TO NOZZLE B-F RPV ISI-1-14-1 AUTO UT 14-B-1 SAFE END TO NOZZLE B-F RPV ISI-1-14-1 AUTO UT 2R-NI B-1 NOZZLE TO SAFE END B-F RPV ISI-1-2R-A AUTO UT 2R-N2D-1 SAFE END TO NOZZLE B-F RPV ISI-1-2R-A AUTO UT 2R-N2E-1 SAFE END TO NOZZLE B-F RPV ISI-1-2R-A AUTO UT 2R-N2F-1 SAFE END TO NOZZLE B-F RPV ISI-1-2R-B AUTO UT 2R-N2G-1 SAFE END TO NOZZLE B-F RPV ISI-1-2R-B AUTO UT 2R-N2J-1 SAFE END TO NOZZLE B-F RPV ISI-I-2R-B AUTO UT RPV-Nl6B-R-2 SAFE END TO REDUCER B-F RPV ISI-1-54-4 UT RPV-N14-1 SAFE END TO NOZZLE B-F SBLC ISI-1-1 1-1 PT RPV-CB-37-56 CLOSURE BUSHINGS B-G-1 RPV ISI-1-54-2 VT-1 RPV-CHN-37-56 CLOSURE HEAD NUTS B-G-1 RPV ISI-I-54-2 VT-1 RPV-CS-37-56 CLOSURE STUDS B-G-1 RPV ISI-1-54-2 UT RPV-CW-37-56 CLOSURE WASHERS B-G-1 RPV ISI-I-54-2 VT-1 RPV-FT-37-56 THREADS IN FLANGE B-G-1 RPV ISI-1-54-2 UT RPV-HB-41 CLOSURE STUDS B-G-1 RPV ISI-1-54-2 UT RPV-HB-42 CLOSURE STUDS B-G-1 RPV ISI-1-54-2 UT RPV-HB-43 CLOSURE STUDS B-G-1 RPV ISI-1-54-2 UT RPV-HB-44 CLOSURE STUDS B-G-1 RPV ISI-1-54-2 UT 14-VB-1400-6A VALVE BOLTING B-G-2 Cs ISI-1-14-1 VT-1 14-VB-1400-9A VALVE BOLTING B-G-2 Cs ISI-1-14-1 VT-1 6-VB-62A VALVE BOLTING B-G-2 FW ISI-I-6-1 VT-1 6-VB-62B VALVE BOLTING B-G-2 FW ISI-1-6-1 VT-1 2-VB-202-5B VALVE BOLTING B-G-2 RECIRC ISI-1-2R-B VT-1 2-VB-63A VALVE BOLTING B-G-2 RECIRC ISI-1-2R-A VT-1 2-VB-64A VALVE BOLTING B-G-2 RECIRC ISI-1-2R-A VT-i 2-VB-64B VALVE BOLTING B-G-2 RECIRC ISI-1-2R-B VT-1 12-VB-1201-39 VALVE BOLTING B-G-2 RWCU ISI-1-12-1SH2 VT-1 12-VB-1201-65 VALVE BOLTING B-G-2 RWCU ISI-1-12-1 SH2 VT-1 12-VB-1201-82 VALVE BOLTING B-G-2 RWCU ISI-1-12-2 VT-i 14-A-10 PIPE TO ELBOW B-J Cs ISI-1-14-1 UT 14-A-19 VALVE TO PIPE B-J Cs ISI-1-14-1 UT 14-A-9A ELBOW TO PIPE B-J Cs ISI-1-14-1 UT 14R-A-1 1 PIPE TO VALVE B-J Cs ISI-1-t4-1 UT 14R-B-21A PIPE TO PIPE B-J Cs ISI-I-i4-i UT 6-N4A-12 REDUCER TO PIPE B-J FW ISI-1-6-t UT 6-N4A-13 TEE TO REDUCER B-J FW ISI-1-6-t UT 6-N4B-11 TEE TO ELBOW B-J FW ISI-1-6-1 UT i-C-15 FLUED HEAD TO PIPE B-J MS ISI-1-I-1 SH2 UT 1-D-15 FLUED HEAD TO PIPE B-J MS ISI-1-I-1 SH2 UT Page 2 of 4

Table 2 ISI EXAMINATIONS PERFORMED DURING RF015 by Entergy, General Electric and Washington Group International ECOMPONENT  :. DESCRIPTION - CATEGORY -SYSTEM .DRAWING  ; EXA 1-SD-10R PIPE TO VALVE B-J MS ISI-11-1SH2 UT 2R-N2K-2 PIPE TO SAFE END B-J RECIRC ISI-1-2R-B UT 10-IA-14 PIPE TO FLUED HEAD B-J RHR ISI-1-10-1 UT 10-IA-15 VALVE TO PIPE B-J RHR ISI-I-10-1 UT IOR-IA-12 PENETRATION TO ELBOW B-J RHR ISI-1-10-1 UT 12R-0-23 ELBOW TO PENETRATION B-J RWCU ISI-1-12-1SH1 UT B-11-75 PIPE TO PIPE B-J SBLC ISI-1-11-1 PT UT B-11-78 PIPE TO ELBOW B-J SBLC ISI-I-11-1 PT UT B-1 1-79 ELBOW TO PIPE B-J SBLC ISI-1-111 PTUT 6-N4A-9HLI (8) SUPPORT LUG B-K-1 FW ISI-1-6-1 MT EB-23-VBW4-1 VALVE BODY WELD B-M-1 HPCI ISI-1-23-1 UT EB-23-VBW4-2 VALVE BODY WELD B-M-1 HPCI ISI-1-23-1 UT RPV INTERIOR VESSEL INTERIOR B-N-1 RPV N/A VT-3 RPV CSS CORE SUPPORT STRUCT B-N-2 RPV N/A VT-3 RPV INT ATTACH - BELTLINE REG INTERIOR ATTACHMENTS WITHIN BELTLINE B-N-2 RPV N/A VT-1 REGION RPV INT ATTACH - NON-BELT RPV INTERIOR ATTACHMENTS OUTSIDE B-N-2 RPV N/A VT-3 BELTLINE REGION RPV-CRD-HSG-2 CRD HOUSING WELD B-O RPV N/A PT RPV-CRD-HSG-2 CRD HOUSING WELD B-O RPV N/A PT RPV-CRD-HSG-3 CRD HOUSING WELD B-O RPV N/A PT RPV-CRD-HSG-4 CRD HOUSING WELD V-0RPV N/A PT CLASS1 HYDRO CLASS i HYDRO B-P VARIOUS VARIOUS VT-2 GB-24-F34 PIPE TO VALVE C-F-i Cs ISI-1-14-23 PT UT EB-23-F58R VALVE TO PIPE C-F-2 HPCI ISI-I-23-2 MTVUT SLT RHR-13 PRESSURE BOUNDARY C-H RHR ISI-I-1S-1C VT-2 SLT MS-2 SRV DISCHARGE INSIDE TORUS D-B Ms ISI-I-1-2SH1 VT-3 HE-A0-SS12HL HANGERLUG D-B RBCCW ISI-I1-0-2SH1 VT-2 IWE-ANNDRN-080 ANNULUS DRAINS(2) AT 80 AZ. E-C CONT ISI-IWE-AUG-1 VT-2 IWE-ANNDRN-270 ANNULUS DRAINS(2) AT 170 AZ. E-C CONT ISI-IWE-AUG-1 VT-2 IWE-ANNDRN-260 ANNULUS DRAINS(2) AT 260 AZ. E-C CONT ISI-IWE-AUG-1 VT-2 IWE-ANNDRN-350 ANNULUS DRAINS(2) AT 350 AZ. E-C CONT ISI-IWE-AUG-i VT-2 IWE-CB-GIBS225 CONTAINMENT BOLTING E-G CONT N/A VT-1 IWE IWE-CB-GXB2315 CONTAINMENT BOLTING E-G CONT N/A VT-1 IWE IWE-CB-X2 CONTAINMENT BOLTING E-G CONT N/A VT-1 IWE IWE-CB-X200A CONTAINMENT BOLTING E-G CONT N/A VT-1 IWE IWE-CB-X213B CONTAINMENT BOLTING E-G CONT N/A VT-1 IWE IWE-CB-X35B CONTAINMENT BOLTING E-G CONT N/A VT-1 IWE IWE-CB-X35C CONTAINMENT BOLTING E-G CONT N/A VT-i IWE H-50-1-315GIBS DRYWELL STABILIZER F-A CONT ISI-IWE-AUG-1 VT-3 IWE H-6-1 107 SPRING HANGER F-A FW ISI-1-6-1 VT-3 H-6-1-107 SPRING HANGER F-A FW ISI-1-6-1 VT-3 H-1-1-HA4 SPRING HANGER F-A MS ISI-1-1-ISHI VT-3 H-i-1-HD4 SPRING HANGER F-A Ms IS1-1-1-ISH1 VT-3 H-30-1-SS12 SNUBBER F-A RBCCW ISI-I-30-2SH1 VT-3 Page 3 of 4

Table 2 ISI EXAMINATIONS PERFORMED DURING RF015 by Entergy, General Electric and Washington Group International COMPONENT DESCRIPTION -  :;'  ;" - CAGORY 'SYST-M DRAWING -7; AM H-2-1-SS3 SNUBBER F-A RECIRC ISI-1-2R-A VT-3 H-10-1-176 SPRING HANGER F-A RHR ISI-I-10-1A VT-3 H-54-1-1 RPV SUPPORT F-A RPV N/A VT-3 H-12-1-96 GUIDE F-A RWCU ISI-I-12-1SH2 VT-3 H-1-1-37 RIGID HANGER F-A-CL4 MS ISI-1-1-1SH2 VT-3 Page4of4

Table 3 FLOW ACCELERATED CORROSION EXAMINATIONS PERFORMED ONLINE AND DURING RF015 by Washington Group International

C' , . . ; II g FAC COMPONENT FAC DESCRIPTION SYSTEM -SCHEDULE - SAFETY-RELATED '

358 EE-7-3-3-1 E MAIN STEAM 10.75 OUTAGE NO 180 (20-) EE-1 5-1T MAIN STEAM 20 OUTAGE NO 300 EBC(A)-1 2-1 E MAIN STEAM 4.5 OUTAGE NO 353.2 PS-1 2TP MAIN STEAM 6.625 OUTAGE NO 350 DE6-13-5-1 E FEEDWATER 12.75 OUTAGE NO 366 DE6-21 1 E FEEDWATER 10.75 OUTAGE NO 307.1 DE6-12-2-1 EP FEEDWATER 4.5 OUTAGE NO 128.2 dcs (2") DCA12-2P RWCU 2.375 OUTAGE YES 346 Wts (2") DCA12-2P RWCU 2.375 OUTAGE YES 376 ELBOW DIS of M01301-60 RCIC 2.375 ONLINE YES 271.1 HF(A)-16-2N EXTRACTION STEAM 24 OUTAGE NO 193 HF16-FSK-4-3E EXTRACTION STEAM 1.9 OUTAGE . NO 383 B CONDENSER NOZZLE 15 EXTRACTION STEAM 1.9 OUTAGE NO 302 HF16-FSK-1 -1E EXTRACTION STEAM 1.9 OUTAGE NO 176 E-103B HTR NOZZLE HEATER VENTS & DRAINS 24 OUTAGE NO 290.2 30" SE ELBOW E101-A HEATER VENTS & DRAINS 30 OUTAGE NO 290.3 30" NE ELBOW E101-A HEATER VENTS & DRAINS 30 OUTAGE NO 290.4 30" NW ELBOW E101-A HEATER VENTS & DRAINS 30 OUTAGE NO 360 HE17-8-5-2E HEATER VENTS & DRAINS 6.625 OUTAGE NO 281.1 E-103B HEATER SHELL HEATER VENTS & DRAINS n/a OUTAGE NO 276 A CONDENSER NOZZLE 47 HEATER VENTS & DRAINS 6.625 OUTAGE NO 373 E-105B HEATER SHELL HEATER VENTS & DRAINS n/a OUTAGE NO 371 HE17-32-6-1 E HEATER VENTS & DRAINS 2.875 OUTAGE NO 372 HE17-39-2-1 E HEATER VENTS & DRAINS 12.75 OUTAGE NO 237 H17-35-2-1E HEATER VENTS & DRAINS 12.75 OUTAGE NO 388 HE17-42-3-2E HEATER VENTS & DRAINS 2.875 OUTAGE NO 325 HE17-FSK-P-124-10E HEATER VENTS & DRAINS 2.375 OUTAGE NO 382 B CONDENSER NOZZLE 45 HEATER VENTS & DRAINS 12.75 OUTAGE NO 389 HE17-8-6-1 E HEATER VENTS & DRAINS 6 OUTAGE NO 1141115 GE-18-21-3-1 E CONDENSATE 14 OUTAGE NO 395 GE18-19-3-1E CONDENSATE 14 OUTAGE NO 154 GE-18-21-4-1E CONDENSATE 14 OUTAGE NO 385 10%-M13-62-5 CONDENSATE 10.75 ONLINE NO 386 10"-M13-58-7 CONDENSATE 10.75 ONLINE NO 381 MD25-M4393-1 CONDENSER VENTS & DRAINS 2.375 OUTAGE NO 380 MD25-M3927-1 CONDENSER VENTS & DRAINS 2.375 OUTAGE NO Page 1 of 1

Table 4 MISCELLANEOUS VISUAL EXAMINATIONS PERFORMED 2003-2005

- MAI NTENANCE DATASHEET 'COMPONENT . 'SYSTEM.- EXAM .:DATE- - REQUEST VT-29-03013 SLT SSW-2 & 3 SSW VT-2 7/21/2003 N/A VT-30-03029 SLT RBCCW-1 & 7 RBCCW VT-2 7/21/2003 NWA VT-29-03012 SLT SSW-1 SSW VT-2 7/22/2003 N/A VT-30-03030 SLT RBCCW-1 RBCCW VT-2 8/18/2003 N/A VT-30-03032 SLT RBCCW-3 RBCCW VT-2 8/1812003 N/A VT-30-03033 SLT RBCCW-4 RBCCW VT-2 8/18/2003 NIA VT-30-03031 SLT RBCCW-2 RBCCW VT-2 8/19/2003 N/A VT-30-03028 PSV-4031 RBCCW VT-2 8/21/2003 02104456 03-V-392 2-13 x 1/2 CAP SCREW CRD VT-1 9/2312003 N/A VT-54-03018 RPV HEAD VENT PIPING RPV VT-2 10/4/2003 03117342,03109752 VT-3-03004 CRD #30-35 AND UNDERVESSEL (VENTS) CRD VT-2 10/9/2003 03110875 VT-4-03001 AO-220-52 RPV VT-2 10/9/2003 03117422 VT-54-03019 N10 NOZZLE OVERLAY REPAIR RPV VT-2 10/9/2003 03117570 VT-54-03020 HEAD VENT PIPING RPV VT-2 10/9/2003 03109629 VT-30-04002 SLT RBCCW-15 RBCCW VT-2 12117/2003 N/A VT-30-04003 SLT RBCCW-13 RBCCW VT-2 12/17/2003 N/A VT-30-04004 SLT RBCCW-1 1 RBCCW VT-2 12J17/2003 N/A VT-30-04005 SLT RBCCW-10 RBCCW VT-2 12/17/2003 N/A VT-30-04006 SLT RBCCW-9 RBCCW VT-2 12/17/2003 NIA VT-30-04007 SLT RBCCW-8 RBCCW VT-2 12117/2003 N/A VT-30-04008 SLT RBCCW-7 RBCCW VT-2 12/17/2003 N/A VT-30-04009 SLT RBCCW-6 RBCCW VT-2 12/17/2003 N/A VT-29-04001 H-29-1-1321SA SSW VT-3 1/20/2004 02103161 04-V-001 40STUDS1 3/8"-6x10SA-193-Gr.BMRIRNo.'s76-175(1),92-4115(3)PIL-17630 MS VT-1 01/29/04 N/A 04-V-002 5 STUDS 1 1/8" 12x6 A-193 Gr. B7 MRIR No.'s 97-6567,94-4394 PIL-19242 MS VT-1 01/29104 NIA 04-V-003 19 HEX NUTS 1 3/8" A-194 Gr.7 MRIR No.'s82-469,76-175,81-857 PIL-18618 MS VT-1 01/29/04 N/A 04-V-004 16 NUTS 1 1/8"-12 SA-194 Gr.7 MRIR No. 00-9579 PIL-18716 MS VT-1 01/29104 N/A VT-29-04002 P-208D PUMP DISCHARGE SSW VT-2 21612004 03102364 VT-30-04001 TBCCW PIPING 11 POINTS FOR IGSCC TBCCW VT-2 3/212004

  • 02107205 VT-10-04001 SLT RHR-7 RHR VT-2 3/2312004 N/A VT-10-04002 SLT RHR-6 RHR VT-2 3/23/2004 N/A VT-10-04003 SLT RHR-9 RHR VT-2 3/23/2004 N/A VT-10-04005 SLT RHR-10 RHR VT-2 3/23/2004 N/A VT-10-04006 SLT RHR-8 RHR VT-2 3/23/2004 N/A VT-10-04007 SLT RHR-3 RHR VT-2 3/2312004 NWA VT-10-04010 SLT RHR-1 RHR VT-2 3/2312004 N/A VT-30-04013 SLT RBCCW-1 RBCCW VT-2 3/2312004 N/A VT-30-05003 SLT-RBCCW-3 RBCCW VT-2 3/23/2004 NIA VT-30-05004 SLT-RBCCW-5 RBCCW VT-2 3/23/2004 N/A VT-30-05005 SLT-RBCCW-12 RBCCW VT-2 312312004 N/A VT-1-04001 H-1-1 -SA3 MS VT-3 3/24/2004 03101431 VT-29-04003 29-HO-3834 SSW VT-2 3/24/2004 04102581 VT-1-04002 SRV 203-3A PILOT ONLY MS VT-2 3125/2004 03101431 VT-1-04003 SRV 203-3D PILOT ONLY MS VT-2 3/25/2004 03101432 VT-2944004 TBCCW HX E-122A & VALVES SSW VT-2 4/20/2004 P9800147 VT-14-04001 SLT CS-1 CS VT-2 8/3/2004 N/A VT-14-04004 SLT CS-6 CS VT-2 8/3/2004 N/A VT-14-04006 SLT CS-8 CS VT-2 8/3/2004 N/A Page 1 of 4

Table 4 MISCELLANEOUS VISUAL EXAMINATIONS PERFORMED 2003-2005 MAINTENANCE

[DATASHEET COMPONENT SYSTEM. EXAM .DATE REQUEST.,

VT-14-04005 SLT CS-7 Cs VT-2 8/23/2004 N/A VT-10-04004 SLT RHR-2 RHR VT-2 8/24/2004 N/A VT-10-04008 SLT RHR-5 RHR VT-2 8/24/2004 N/A VT-10-04009 SLT RHR-3 RHR VT-2 8/24/2004 N/A VT-10-04011 SLT RHR-1 RHR VT-2 8/24/2004 N/A VT-10-04012 SLT RHR-7 RHR VT-2 8/24/2004 N/A VT-23-04002 SLT HPCI-1 HPCI VT-2 8/24/2004 NWA VT-23-04003 SLT HPCI-4 HPCI VT-2 8/24/2004 N/A VT-23-04004 SLT HPCI-3 HPCI VT-2 8/24/2004 N/A VT-23-04005 SLT HPCI-2 HPCI VT-2 8/24/2004 N/A VT-23-04006 SLT HPCI-5 HPCI VT-2 8/24/2004 N/A VT-1-05001 MSIV 2A,B,C,D TO R. B. WALL MS VT-2 9/2112004 N/A VT-6-04001 SLT FW-1 FW VT-2 9/21/2004 N/A VT-14-04002 SLT CS-5 CS VT-2 9/23/2004 N/A VT-14-04003 SLT CS-4 CS VT-2 9/23/2004 N/A VT-14-4007 SLT CS-3 CS VT-2 9/23/2004 N/A VT-14-04008 SLT CS-2 CS VT-2 9/23/2004 N/A VT-14-04009 SLT CS-1 CS VT-2 9/23/2004 N/A VT-29-04005 29-CK-3880B SSW VT-2 9/24/2004 03102361 04001 VOID SLT RCIC-5 RCIC VT-2 10/15/2004 N/A 04002 VOID SLT RCIC-4 RCIC VT-2 10/15/2004 N/A 04003 VOID SLT RCIC-3 RCIC VT-2 10/15/2004 N/A 04004 VOID SLT RCIC-2 RCIC VT-2 10/15/2004 N/A 04005 VOID SLT RCIC-1 RCIC VT-2 10/15/2004 N/A VT-13-04006 SLT RCIC-1 RCIC VT-2 10/15/2004 N/A VT-13-04007 SLT RCIC-2 RCIC VT-2 10/15/2004 N/A VT-1 3-04008 SLT RCIC-3 RCIC VT-2 10/15/2004 N/A VT-13-4009 SLT RCIC-4 RCIC VT-2 10/15/2004 N/A VT-13-04010 SLT RCIC-5 RCIC VT-2 10/15/2004 N/A VT-30-04012 SLT RBCCW-7 RBCCW VT-2 12/15/2004 N/A VT-29-04006 SLT SSW-1 SSW VT-2 12/29/2004 N/A VT-30-04010 SLT RBCCW-7 RBCCW VT-2 12/2912004 N/A VT-1 1-04001 SLT SLC-1 SBLC VT-2 12/30/2004 N/A VT-30-04011 SLT RBCCW-1 RBCCW VT-2 12/30/2004 N/A VT-13-05001 SLT RCIC-2 RCIC VT-2 1/10/2005 N/A VT-i 1-05001 SLT SLC-3 SBLC VT-2 1/12/2005 N/A VT-1 1-05002 SLT SLC-1 SBLC VT-2 1/12/2005 N/A VT-30-45001 P-202B RBCCW VT-2 1/24/2005 04108826 VT-23-05001 SLT-HPCI-2 HPCI VT-2 2/23/2005 N/A VT-10-05002 SLT-RHR-1 RHR VT-2 3/2/2005 N/A VT-10-05003 SLT-RHR-4 RHR VT-2 3/2/2005 N/A VT-10-05004 SLT-RHR-2 RHR VT-2 3/2/2005 N/A VT-10-05015 SLT-RHR-1 RHR VT-2 3/2/2005 N/A VT-30-05002 SLT-RBCCW-8 RBCCW VT-2 3/2/2005 N/A VT-54-05001 aC-1A, B. C, E. H, J. L, 0, P SCREWS VT-1 4/1/2005 N/A VT-30-05015 19-E206A-HL RBCCW VT-3 4/5/2005 04112867 VT-30-05017 H-19-1-E206A RBCCW VT-3 4/5/2005 04112867 VT-23-05002 H-23-1 -P205 HPCI VT-3 4/6/2005 04112868 Page 2 of 4

Table 4 MISCELLANEOUS VISUAL EXAMINATIONS PERFORMED 2003-2005

.... -. ;C DATASHEET' ---  : 'COMP COMPONENT -

- SYSTEM EXAM DATE- MAINTEQANES-REGUEST VT-14-05001 H-14-1-33 Cs VT-3 4/11/2005 04112869 VT-30-05016 HE-30-61 PS RBCCW VT-3 4/11/2005 04112867 VT-30-0501 8 H-30-E-122A RBCCW VT-3 4/12/2005 04112867 VT-30-05019 HE-30-438PS RBCCW VT-3 4/12/2005 04112867 VT-14-05002 GB-14-22HL1(4) Cs VT-1 4/13/2005 04112869 VT-30-05021 HE-30-61HL RBCCW VT-3 4/13/2005 04112867 VT-30-05020 H-30-1 -119 RBCCW VT-3 4/1412005 04112867 VT-1-05005 RV-203-3D MS VT-1 4/17/2005 3108857 VT-1-05006 RV-203-3D MS VT-3 4/17/2005 3108857 VT-1-05007 RV-203-3D MS VT-3 4/18/2005 3108857 VT-50-05010 IWE-ANNDRN-80,170,260, AND 350 CONT VT-2 4/20/2005 03116650 VT-10-05021 SLT-RHR-12

  • RHR VT-2 412512005 03116630 VT-29-05004 JF-29-15-7, JF-29-15-9, 29-HO-3818, 29-HO-3817, 29-HO-3881B SSW VT-2 4/26/2005 04108872 VT-29-05005 JF-29-9-8A, JF-29-9-8B, 29-HO-3B, 29-HO-5B, 29-HO-3837,29-HO-3839, JF-29-9-2 SSW VT-2 4/26/2005 04108872 VT-30-05024 30-HO-46 RBCCW VT-2 4/26/2005 04108878 VT-30-05025 30-HO-47 RBCCW VT-2 4/26/2005 04108878 VT-30-05026 30-HO-45 RBCCW VT-2 4/26/2005 04108878 VT-10-05017 SLT-RHR-13 RHR VT-2 4/27/2005 03116630 VT-6-05005 6-VB-62A FW VT-3 4/27/2005 03116641 VT-1 1-05003 B-11-79 SLC VT-2 4/28/2005 05106774 VT-1 1-05004 SLT-SLC-2 SLC VT-2 4/28/2005 04109022 VT-1 1-05005 SLT-SLC-3 SLC VT-2 4/28/2005 04109022 VT-1 1-05006 SLT-SLC-4 SLC VT-2 4/28/2005 04109022 VT-29-05002 H-29-1-1065 SSW VT-3 4128/2005 4118127 VT-6-05002 6-CK-62A FW VT-1 4/28/2005 03109387 VT-6-05003 6-VB-62B FW VT-1 4/28/2005 03109387 VT-14-05003 14-VB-1400-6A CS VT-1 4/29/2005 03116643 VT-1 4-05004 14-VB-1400-9A CS VT-1 4/29/2005 03116643 VT-30-05022 H-30-1-SS12 RBCCW VT-3 4/29/2005 03116635 VT-30-05023 HE-30-SS12HL RBCCW VT-3 4/29/2005 03116635 VT-3-05002 SS-3-25-03 CRD VT-3 4/30/2005 3119361 VT-6-05006 6-VB-62A FW VT-3 4/30/2005 03116641 VT-50-05012 IWE-ANNDRN-80.170,260. AND 350 CONT VT-2 5/212005 03116650 VT-29-05003 JF-29-2-1A, SSW VT-2 5/3/2005 04108873 VT-10-05019 MO-1 001 -23A to MO-1 001 -26A RHR VT-2 5/4/2005 05101192 VT-10-05018 SLT-RHR-13 RHR VT-2 5/512005 03116630 VT-10-05020 SLT-RHR-1 RHR VT-2 5/5/2005 N/A VT-10-05022 SLT-RHR-14 RHR VT-2 5/5/2005 03116630 VT-10-05023 SLT-RHR-14 RHR VT-2 5/5/2005 03116630 VT-1 0-05024 SLT-RHR-2 RHR VT-2 5/5/2005 03116630 VT-1-05008 SLT MS-2 MS VT-3 5/5/2005 03116636 VT-i 1-05007 B-1i1-79R SLC VT-2 5/7/2005 05108176 VT-3-05003 SLT-CRD-1 CRD VT-2 5/9/2005 03116624 VT-3-05004 SLT-CRD-1 CRD VT-2 5/9/2005 03116624 VT-3-05005 SLT-CRD-2 CRD VT-2 5/9/2005 03116624 VT-3-05006 SLT-CRD-2 CRD VT-2 519/2005 03116624 VT-3-05007 SLT-CRD-3 CRD VT-2 5/9/2005 03116624 VT-3-05008 SLT-CRD-4 CRD VT-2 5/9/2005 03116624 Page 3 of 4

Table 4 MISCELLANEOUS VISUAL EXAMINATIONS PERFORMED 2003-2005

-7,- *

- MAINTENANCE -:

DATASHEET COMPONENT SYSTEM: EXA DATE -REQUEST!

VT-54-05006 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05007 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05008 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05009 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05010 CLASS 1 HYDRO VARIOUS VT..2 519/2005 03116624 Vr-54-0501 1 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05012 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-0501 3 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-0501 4 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-0501 5 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624

'JT-54-0501 6 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05017 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05018B CLASS 1 HYDRO VARIOUS VT-2 519/2005 03116624 VT-54-0501 9 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05020 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05021 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 VT-54-05022 CLASS 1 HYDRO VARIOUS VT-2 5/9/2005 03116624 Page 4 of 4

Table 5 Miscellaneous NDE Examinations Performed 2003-2005

-- .. .CODE - - 7 AINTENANCE7 IDATASHEET . COMPONENT.. SYS.'NO. ,-CAT.. EXAM -- DATE -:REQUEST.: -1 03-E-399 INITIAL FLAW- 3-1-1R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F UT 101912003 03117570 03-E-422 FINAL PSI UT -- 3-1-1 R (N1O NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F UT 10/9/2003 03117570 03-P-402 3-1-1R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F PT 10/912003 03117570 03-P-403 3--1-R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F PT 10/9/2003 03117570 03-P-405 3-1-1R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F PT 1019/2003 03117570.

03-P-407 3--1RF (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F PT 10/9/2003 03117570 03-P-409 3-1-1R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F PT 10/9/2003 03117570 03-P-419 FINALPT-3-I-1R(N1ONOZZLEOVERLAYINPROCESSEXAMS) RPV B-F PT 10/9/2003 03117570 03-P-423 3-1-1R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F PT 10/9/2003 03117570 03-P-428 3-1-1R(N1ONOZZLEOVERLAYINPROCESSEXAMS) RPV B-F PT 101912003 03117570 03-U-401 3-1-1R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F UT 10/9/2003 03117570 03-U-404 3-1-1R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F UT 10/9/2003 03117570 03-U-406 3--11R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F UT 10/9/2003 03117570 03-U-408 3-I-1 R(NIO NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F UT 10/9/2003 03117570 03-U-418 3-1-1R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F UT 10/9/2003 03117570 03-U-420 FINALUTTD-3-1-1R(N1ONOZZLEOVERLAYINPROCESSEXAMS) RPV B-F UT 10/9/2003 03117570 03-U-424 3-1-1R (N10 NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F UT 10/9/2003 03117570 03-U-427 3--1-R (N1O NOZZLE OVERLAY INPROCESS EXAMS) RPV B-F UT 10/9/2003 03117570 04-U-005 JF29-15-9 S.S.W. Spool SSW N/A UT 02/08104 04100606 04-P-015 FW 19900838-1 (Valve HO-45) RHR 2 PT 08/28104 19900838 04-P-016 FW 19900838-2A (Valve HO-45) RHR 2 PT 08/31/04 19900838 05-M-002 SSW SPOOL JF29-2-1A SSW N/A MT 1/28/2005 04112440 05-M-004 SSW SPOOL JF29-2-1A/B SSW N/A MT 1/29/2005 04112440 05-M-005 SSW SPOOL JF29-2-1A SSW N/A MT 1/31/2005 04112440 05-M-006 SSW SPOOL JF29-2-1B SSW N/A MT 2/1/2005 04112440 05-M-003 SSW SPOOL JF29-2-4A SSW N/A MT 2/2/2005 04118035 05-M-007 SSW SPOOL JF29-3-4AIB SSW N/A MT 2/4/2005 04117967 05-M-008 SSW SPOOL JF29-2-1A SSW N/A MT 2/5/2005 04112440 05-M-009 SSW SPOOL JF29-2-4A SSW N/A MT 2/5/2005 04118035 05-M-012 SSW SPOOL JF29-3-4B SSW N/A MT 2/7/2005 04117967 05-M-01 1 SSW SPOOL JF29-9-8A/8B SSW N/A MT 2/8/2005 04112861 05-M-014 SSW SPOOL JF29-9-8A/8B SSW N/A MT 2/11/2005 04112861 05-M-015 SSW SPOOL JF29-15-9 SSW N/A MT 2/11/2005 04118127 05-M-016 SSW SPOOL JF29-9-2 SSW N/A MT 2/11/2005 04118336 05-M-013 SSW SPOOL JF29-3-4A SSW N/A MT 2/14/2005 04117967 05-M-018 SSW SPOOL JF29-9-2 SSW N/A MT 2/16/2005 04118336 05-M-019 SSW SPOOL JF29-15-9 SSW N/A MT 2/16/2005 04118127 05-P-020 RCIC VENT LINE RCIC N/A PT 2/25/2005 03117562 05-P-021 30-HO-119 RBCCW NA PT 312312005 04101887 05-P-022 HO-1001-198 RHR N/A PT 312312005 05101296 05-P-031 HCU-30-47 CRD N/A PT 4/19/2005 02122049 05-P-032 HCU-30-47 CRD N/A PT 4/20/2005 02122049 Page 1 of 1

Table 6 RF015 ISI and FAC MAINTENANCE REQUESTS ISHW UNECILD-  :

77 .-

MR ' ISI OUTAGE MR. --SYSTEM

- 3116623 SSW

- 3116649 CRD

- 3116626 RWCU

- 3116650 CONT 4112870 3116643 Cs 4112869 3116642 CS

- 3116641 FW 4112868 3116640 HPCI

- 3116636 MS 4112867 31i6635 RBCCW 3116634 RBCCW 3116633 RCIC

- 3116632 RECIRC 4112865 3116631 RHR 4112863 3116630 RHR

- 3116627 RPV NOZZLES

- 3116628 REFUEL FLOOR ISI

- 3116625 SBLC

- 3116629 RPV VERTICAL SHELL WELDS (FRAMATOME)

-- 3116403 'WI

- 3116716 REMOVE INSUL FROM N14, N15 & N16 NOZZLES 3116624 CLASS 1 HYDRO

-- 4109173 NOZZLE EXAM SCOPE EXPANSION CONTINGENCY

- 5102931 SBLC N14 NOZZLE WELD OVERLAY CONTINGENCY

- 3105799 WELD OVERLAY CONTINGENCY

- 4102437 REMOVE BLOCKOUT A-9A BLOCKS 4112143 - CHILD MR TO SET UP 2 AUTO UT CONTROL STATIONS FAC ONLNE ---- -

CHILD MR FAC OUTAGE MR SYSTEM -

- 3117163 CONDENSATE

_ 3117159 EXTRACTION STEAM

- 3117164 FEEDWATER 3117162 MAIN STEAM/MS Aux

--- 3117160 HEATER VENTS& DRAINS

-- 3117161 RWCU

- 4106270 RCIC Page 1 of 1

Table 7 ISI CORRECTIVE ACTION DOCUMENTS 2003-2005

... .. 7-.--,

r. '-' i FCR NUMBER  ; ;- COMONNT - - - - SYSTEM DISPOSIT;ON REMARKS-2003.3719 CRD Return Nozzle N10 Cap has thru wall pressure boundary leakage RPV REPAIR WELD OVERLAY INSTALLED 2005-1304 Undocumented design change made to hanger H-23-1-8 HPCI ACCEPT-AS-IS ER 05108585 2005-1520 FAC point 128.2 below Tscr RWCU ACCEPT-AS-IS 2005-1536 Snubber H-2-1-SS-3 piston setting out of tolerance RECIRC ACCEPT-AS-IS 2005-1608 4 of 10 steam dryer tie-bars have cracked welds RPV REPAIR WELDS REPAIRED PER ER#05106713 2005-1639 Indication found during scheduled ISI UT exam of B-I 1-79 weld SBLC REPAIR 2005-1657 N2E exam found spot location below min wall RECIRC ACCEPT-AS-IS 2005-1666 Two through wall holes found on FAC point 290.2 EXTRACTION REPAIR STEAM 2005-1754 Two UT transducers failed during auto UT of N2E safe end weld EXTRACTION FAULTY MAIN UMBILICAL STEAM CABLE REPLACED 2005-1759 FAC point 290.2 below Tscr RECIRC REPAIR 2005-1770 2R-N2G-1 noted two areas below min wall RECIRC ACCEPT-AS-IS 2005-1827 2R-N2G-1 weld crown surface profile RECIRC ACCEPT-AS-IS 2005-1830 2R-N2J-1 below min wall RECIRC ACCEPT-AS-IS 2005-1839 Loose bolt discovered on hanger H-6-1 -101 FEEDWATER REWORK 2005-1857 Debris discovered in annulus near Jet pump #4 on vessel side RPV REMOVE DEBRIS DEBRIS REMOVED 2005-1860 Individual struck by falling lead blanket N/A CONDITION CORRECTED 2005-1870 UT on RPV-TH-M4 identified one indication RPV ACCEPT-AS-IS FABRICATION FLAW (UPJOHN INDICATION) 2005-1871 UT on RPV-TH-M5 Identified one indication RPV ACCEPT-AS-IS FABRICATION FLAW (UPJOHN INDICATION) 2005-1888 Jet pump wedges 16 and 17 found in full down position. Jet pump wedge 16 not making RPV ACCEPT-AS-IS CONDITION EVALUATED; RK WELDS EXAMINED contact with its seating surface 2005-1890 Metallic debris found In RPV annulus on shroud support ledge during IWI adjacent to RPV REMOVE DEBRIS DEBRIS REMOVED jet pumps 11, 12, and 13 2005-1893 Core Spray weld 14-A-3 below min wall CORE SPRAY ACCEPT-AS-IS 2005-1895 Weld crown surface profile conditions on RPV-N2G-1 and RPV-N2J-1 RECIRC ACCEPT-AS-IS 2005.1914 SBLC weld B-I 1-79 failed preservice UT exam SBLC REPAIR WELD REPLACED Page 1 of 2

Table 7 ISI CORRECTIVE ACTION DOCUMENTS 2003-2005 CR NUMBER - . .: COMPONENT . -- SYSTEM DISPOSION REMARKS 2005-1916 Indication observed on nozzle to safe end weld on 2R-N2F-1 RECIRC ACCEPT-AS-IS MID-WALL FABRICATION FLAW (LACK OF FUSION) 2005-1965 Debris discovered In annulus area of Jet pump #7 on vessel side RPV REMOVE DEBRIS DEBRIS REMOVED 2005-1979 Metallic debris found in RPV annulus on shroud support ledge during IVVI Inspections RPV REMOVE DEBRIS DEBRIS REMOVED adjacent to Jet Pump #4 2005-1980 Loose nuts/studs on IWE-CB-X2 CONTAINMENT REWORK 2005-1982 Crack on structural lug fillet welds (6-N4A-9HL1 (8)) FEEDWATER ACCEPT-AS-IS ER 05107476 2005-2024 Metallic debris found In RPV annulus on shroud support ledge during IWI inspections RPV REMOVE DEBRIS DEBRIS REMOVED adjacent to Jet Pump #7 2005-2059 Water on 1400-9A valve bonnet CORE SPRAY ACCEPT-AS-IS NOT PRESSURE BOUNDARY LEAKAGE 2005-2120 FAC point 366 below Tmin FEEDWATER ACCEPT-AS-IS 2005-2137 Lower end of the 210 degrees Surveillance Sample Holder not properly engaged to the RPV REWORK CAPSULE PROPERLY SECURED lower bracket 2005-2139 Additional debris found In RPV annulus on shroud support ledge during IWI RPV REMOVE DEBRIS DEBRIS REMOVED inspections adjacent to Jet Pump #14 2005-2253 FAC point 290.3 below Tscr EXTRACTION ACCEPT-AS-IS STEAM 2005-2384 S8LC weld B-1 1-79 visual linear Indiction in weld removal area SBLC REWORK FABRICATION WORKMANSHIP ISSUE Page 2 of 2

2.0 NIS-1 and NIS-2 Code Report Forms 2.1 RFO15 NIS-1 Form

FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner Entergv (Name and Address of Owner)
2. Plant Pilgrim Nuclear Power Station. 600 Rocky Hill Road. Plymouth. MA 02360 (Name and Address of Plant)
3. Plant Unit #1 4. Owner Certificate of Authorization (if required) N/A
5. Commercial Service Date 12-9-72 6. National Board Number for Unit 20763
7. Components Inspected Component or Manufacturer Manufacturer or National Appurtenance or Installer Installer Serial No. State or Province No. Board No.

Reactor Vessel Combustion Piping Eng. Bechtel 66107 66207 20763 Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 in. x 11 in.,

(2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Page 1 of 2

FORM NIS-i (back)

8. ExaminationDates 5-14-03 to 5-9-05 9. InspectionIntervalfrom 6-30-95 to 6-30-05
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. SEE ISI

SUMMARY

REPORT

11. Abstract of Conditions noted. SEE ISI

SUMMARY

REPORT

12. Abstract of Corrective Measures Recommended and Taken. SEE ISI

SUMMARY

REPORT AND NIS-2 FORMS.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Date 0FULN 2.S' 200* Signed Enterev Byv 79 /

Owner EP&CManager I ,fyeZ()

Certificate of Authorization No. (if applicable) N/A Expiration Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors anopr4$Ie State or Province of MA and employed by Hartford Steam Boiler Inspection and Insurance Co. of Hartford. CT have inspected the components described in this Owner's Data Report during the period of 5-14-03 to 5-9-05 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied concerning the examinations and corrective measures described in this Owner's Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date:  ?/;Zp/orS rnmmins/nnlA4///9/64,4Bj. l MA I/*I Inspector's Signature National Board, State, Province, and No.

Page 2 of 2

2.2 RFO15 NIS-2 Forms Entergy Pilgrim Nuclear Power Station Form NIS-2 Owner's Report For Repairs or Replacements of Items/Components from RFO14 Close to RFO15 Close Prepared by:

4Ni 4 2A 1 Senior ISI Engineer Approved by: EP&C 7/Z/I4 tP&C Manager go , eoz1cf Approved by: ANII ANII

FORM MS-2 OWNER'8 REIOR FOR REPANRREPLACEMENT ACTMTY As Required by the Provions of the ASME Code, Secton XI

1. Own Entergy Louisiana, Inc. Dts - V /c U S 639 Loyola Ave. New Orleans, LA 70113 Shoot 1 d Enterey Nuclear Generation Company 2Pe* y~Zayna t e4o" Qtn unit 1 600 Rocky Hill Rd. Plymouth, HA 02360 See Attached NIS-2 Smary Form Ad&~ XW*AfrWhp*Me OMNSf PAL. No. Job No mm.
  • PfotM~dby WD^ Pilgrim Nuclear Power Station Typ Code "bW N/A 600 Rocky Hill Rd. Plymouth, MA 02360 E¢hknDat N/A

. M~kb dn at Sysm See Attached NIS-2 Su-ary Form L () Apikable Cwdfwam Cods ANSTLB ....iLE7L Edtko .N Addrdw W '.-

.Code cae b)Appkabb Edmon otSection Xa ULld for Rop I/Repl omet ty 89 i)Appncmbiseclon ) Cods Came N-416-1 IL kIentfcation of Co.ompo Nudwee Code No n of 1d NWae, M m'ag Sd Yew PM. or A8ME d CompOW"t Uanbucr Seu Nmm No. Othw knadfcaon Suht Imbftd Yes or Nol

7. DuakXo of Wodit Tea Condued: Hoota D* Pneumic 0 Nomd Opeqat Prsure 0 Exempt 0 Ohe 0 Prewsae psi Ted Ts - F NOTE: Supplemental sheets In form of nfht sketches. or drAwngs may be used, provided (1) dn Is In xKll InK.(2) Infomation In koenal through a on this report 1 Induded on each sheut endP3) sech sheet Is numbered and number of sheet Is recorded it the top of this farm.

7190 This form Ia ney be otaWnd from the Oidw DOL. ASIA. 22 Law Oe. DOs 230. Pailsid NJ 07-2300.

  • EO3O0

FORM NIS-2 (Back) 9, . PRmarks Rf-e Attichf.1e NT5q-9 5qnmrnirv Pnrm Applicable Manufacturer's Data Reports to be attached

  • Refer to NIS-2 Summary Table for additional code cases.

CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this repair/replacement conforms repair or replacement to the rules of the ASME Code,Section XI.

Type Code Symbol Stamp. NI A Certificate of Authorization No. N/A I expiration Date. N/A Signed fln AE -Pe/1t), G0ec I )ate J7tLYt. y2-  ?

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of MA and employed by HSBCT of Hartford, CT have inspected the components described in this Owner's Data Report during the period of 5-14-03 to 5-9-05, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied concerning the examinations and corrective measures described in this Owner's Data Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions IVA1195, A91V' iT /,<s7 Inspect r's Signature National Board, State, Provincc, and Endorsements Date: 7/;tt 200S

FORM NIS-2 OWNER'S

SUMMARY

REPORT FOR REPAIR OR REPLACEMENTS from RFO14 Close to RFO15 Close PILGRIM NUCLEAR POWER STATION Rocky Hill Road, Plymouth, MA Construction Code B31.1, 1967 Edition, No Addenda, No Code Case Repaired ASME -

-.. Name of . Entergy or Nat. MR. Year Replacement or Code - Te.:

Name of Component System',',, Mfg. Mfg. N .. Brd. No. Number Built . Replacement

. Stamped Description of Work Performed- Conducted Pump bowl and columns SSW Gould P-208B 03102361 2003/2004 Replacement Y Replace pump bowl & columns VT-2 Valve SSW Pratt --- 29-HO-3817 P9900454 --- Replacement N Replace valve & bolting VT-2 Valve SSW Pratt --- 29-HO-3881B 05102257 --- Replacement N Replace valve & bolting VT-2 Valve SSW Pratt --- 29-HO-3818 P9900455 -_ Replacement N Replace valve & bolting VT-2 Support SSW Patterson = H-29-1-1065 04108127 --- Modification N baseplate VT-3 Valve SSW 29-HO-3B 04109557 Replacement N Replace gate valve with ball valve VT Valve SSW -- --- 29-HO-3B 04109557 --- Replacement N Replace gate valve with ball valve VT-2 Valve RBCCW --- --- 30-HO-47 04104817 Replacement N Replace valve & bolting VT-2 Valve RBCCW Pratt --- 30-HO-46 04104215 Replacement N Replace valve & bolting V T-2 .

Valve RBCCW Powell ... 30-CK-421 P9401162 --- Replacement N Replace pressure retaining parts VT-2 Pump mechanical seal RBCCW Flowserve P-202B 04108826 Replacement N Rebuild mechanical seal VT-2 RPV N10 nozzle weld 3-1-1 RPV CE 66107 20763 03117491 1969 Repair Y overlay VT-2 Bolting SSW --- --- Spool JF29-16-2 03101383 --- Replacement N Replace bolting l Contract Safety Relief Valve MS TrogkteifVrge Taft lTogt lBod MX Body SvINg SIN RV203-X YRpceeaby No. 2 0013 1987 Replacement Y Replace seat by welding VT-2 Tagt SIN 1054 Safety Relief Valve pilot Ms Rc replaced RV203-3A 03101431 -- Replacement Y Replace pilot VT-2 Rok w ith 1208 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Target SIN 1049 Safety Relief Valve pilot MS replaced RV203-3D 03101432 --- Replacement Y Replace pilot and bolting VT-2 Rock with 1040 .

Support MS Bergen- H-1-1-SA3 03101431 Modification N Modify support by coping flange of VT-3 Patterson beam CRD Bolting CRD GE --- HCU 30-35 drive 03110875 Replacement N Replace CRD drive bolting (6) VT-2 RPV Head Vent valve RPV --- 4-HO-48 03109752 --- Replacement N Replace valve and piping PT VT-2 RPV Head Vent valve RPV --- 4-HO-49 03113124 --- Replacement N Replace valve and piping. PT VT-2 Page 1 of 4

FORM NIS-2 OWNER'S

SUMMARY

REPORT FOR REPAIR OR REPLACEMENTS from RF014 Close to RF015 Close PILGRIM NUCLEAR POWER STATION Rocky Hill Road, Plymouth, MA Construction Code B31.1, 1967 Edition, No Addenda, No Code Case Nameof' o .Repaired, ASME .

-. MR

,-Nme Year' - Replacement or,- Code,,-ofTest

,Narne of Ct -'System'--' Mfg. 'Mfg. S/ . Brd. No. Number . ' Built Replacement 'Sta mped .escRption of Work Per__r__ed -C_'duced Turbine Stop valve HPCI lKoetin --- HO-2300-23 03115728 --- Replacement N Replace pilot valve and stem ---

Support SSW --- H-29-1-1321SA 02103161 , Replacement N Replace drawing detail Item #11 VT-3 Valve SSW --- ... AO-3925 02103161 _ Replacement N Replace valve and bolting VT-2 Expansion Joint SSW Garlock --- XJ-319 03102364 Replacement N Replace exp. Joint and bolting VT-2 Valve SSW Pratt 29-1H0-3834 04102581 ... Replacement N Replace valve & bolting VT-2 Pump assembly SSW Gould _ P-208D 03102364 2003 Replacement Y Replace pump assembly & exp. VT-2 Valve SSW Crane 29-CK-3880D 03102364 2003 Replacement Y Replace valve and bolting VT-2 Valve SSW Crispin AV-38006 03102364 2003 Replacement Y Replace valve and bolting VT-2 Pump assembly SSW Gould --- P-208E 03102365 2003 Replacement Y Replace pump bowl & columns VT-2 Relief Valve RBCCW Dresser TN-26488 PSV-4031 02104456 2003 Replacement Y Replace valve and bolting VT-2 Valve RBCCW Powell 30-CK-423 P9700015 1967 Replacement N Replace disc and bolting VT-2 Valve RBCCW Powell --- 30-CK-424 P9701281 1967 Replacement N Replace disc and bolting VT-2I Valve bolting SSW --- ... 29-HO-3834 04103280 --- Replacement N Replace bolting Heat Exchanger bolting TBCCW --- --- E-122A P9800147 --- Replacement N Replace bolting, Socket Weld SBLC --- B-1 1-79 05108176, 1970 Replacement N Replace weld per ER 05108177 PT VT-2 Valve_rat9-O-83 05 106774 Replacement R a le tiV Valve SSW Pratt 29-HO-3837 P9600773 _ Replacement N Replace valve & bolting VT-2 Valve SSW Pratt --- 29-11-3839 P9600774 -- Replacement N Replace valve & bolting VT-2 Pipe Spool SSW JF29-9-8A 03121196 2004 Replacement N Replace pipe spool and bolting VT-2 Pipe Spool SSW --- -.- JF29-9-8B 03121196 2004 Replacement N Replace pipe spool and bolting VT-2 Pipe Spool SSW --- --- JF29-2-IA 03121195 2004 Replacement N Replace pipe spool and bolting VT-2 Pipe Spool SSW .. JF29-24B 03121195 2004 Replacement N Replace pipe spool and bolting VT-2 Pipe Spool SSW --- JF29-9-2 03121196 2004 Replacement N Replace pipe spool and bolting VT-2 Pipe Spool SSW --- JF29-3-4A 03101195 2004 Replacement N Replace pipe spool and bolting VT-2 Pipe Spool SSW --- --- JF29-3-4B 03101195 2004 Replacement N Replace pipe spool and bolting VT-2 Pipe Spool SSW --- J-F29-2-4A 03101195 2004 Replacement N Replace pipe spool and bolting VT-2 Valve RBCCW Pratt ... 30-HO-45 04104818 --- Replacement N Replace valve and bolting VT-2 Heat Exchanger RBCCW EFCO S-15577B E-209B 01108097 1968 Repair Y Weld repair channel partition plates PT VT-2 Bolting CONT --- I PIL-11181 03116650 --- Replacement N Replace bolting at GIBBS manway ---

ECP Probe RECIRC ECP Probe 03118647 --- Replacement N Replace ECP probe at P-201 A suctio VT-2 Page 2 of 4

/

FORM NIS-2 OWNER'S

SUMMARY

REPORT FOR REPAIR OR REPLACEMENTS from RF014 Close to RFOI5 Close PILGRIM NUCLEAR POWER STATION Rocky Hill Road, Plymouth, MA Construction Code B31.1, 1967 Edition, No Addenda, No Code Case

.: . :- Nm of Ene,',-', or, Na,,,. ,Repaired,. ASME - -

' .'-e o MR Year Replaceme or Code. -

Name of Component ' System '.Mfg. Mfg. SIN, Brd. No. ':Num'ber Built. .Replkerent " StanoedDe cription ofWorkPerforined Conducted LPRM Detector RPV GE 02S46320 LPRM 36-05 03113937 -- Replacement N Replace LPRM detector string VT-2 LPRM Detector RPV GE 05S92652 LPRM 20-21 03113937 Replacement N Replace LPRM detector string VT-2 LPRM Detector RPV GE 05S92654 LPRM 04-29 03113937 _ Replacement N Replace LPRM detector string VT-2 LPRM Detector RPV GE 05S92651 LPRM 20-37 03113937 --- Replacement N Replace LPRM detector string VT-2 LPRM Detector RPV GE 02S46319 LPRM 44-21 03113937 --- Replacement N Replace LPRM detector string VT-2 Control Rod Drive CRD GE A6713 02-19 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE 7383 02-27 03116574 --- Replacement N Replace CRD and bolting VT- I VT-2 Control Rod Drive CRD GE A8549 06-19 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE 1323 10-07 03116574 --- Replacement N Replace CRD and bolting VT- I VT-2 Control Rod Drive CRD GE 131IA 10-23 03116574 - Replacement N Replace CRD and bolting VT-I .VT-2 Control Rod Drive CRD GE 1648 10-43 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 .

Control Rod Drive CRD GE 1434 14-39 03116574 --- Replacement N Replace CRD and bolting VT-_I VT-2 Control Rod Drive CRD GE 5540 14-43 03116574 -- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A6733 14-47 03116574 --- Replacement N Replace CRD and bolting VT-I' VT-2 ,

Control Rod Drive CRD GE 5304 14-51 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A1053 18-23 03116574 --- Replacement N Replace CRD and bolting VT-1. VT-2 Control Rod Drive CRD GE A8597 18-31 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A3961 22-07 03116574 -- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE 5436 22-11 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A6713 22-19 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE 6642 30-27 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A6485 30-35 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE 7632 30-39 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A8769 30-51 03116574 -- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE 7160 34-15 03116574 --- Replacement N Replace CRD and bolting VT- I VT-2 Control Rod Drive CRD GE A8805 34-39 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE 5685 38-03 03116574 --- Replacement N Replace CRD and bolting VT-i VT-2 Control Rod Drive CRD GE A8820 38-11 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A6663 38-19 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A2056 38-27 03116574 - Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A5293 38-39 03116574 .Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE 1984 38-47 03116574 Replacement N Replace CRD and bolting VT- I VT-2 Page3 of 4

FORM NIS-2 OWNER'S

SUMMARY

REPORT FOR REPAIR OR REPLACEMENTS from RF014 Close to RF015 Close PILGRIM NUCLEAR POWER STATION Rocky Hill Road, Plymouth, MA Construction Code B31.1, 1967 Edition, No Addenda, No Code Case

-- Repaired, -. ASME

- Nmeof Entergy orNa  : MR - Year Replacment'or Code . Ts Nmeof Componen t -System Mfg Mfg.S/N Brd.No. . Number . Built. Replacement Stamped Description of Work Per ormed Conducted Control Rod Drive CRD GE 9011 42-47 03116574 Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE 1377 46-11 03116574 --- Replacement N Replace CRD and bolting VT-I VT-2 Control Rod Drive CRD GE A3936 46-19 03116574 Replacement N Replace CRD and bolting VT-i VT-2 Page 4 of 4