>- Entergy Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment 10 CFR 50.55(g)(5)

August 1, 2003 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Pilgrim Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Summary Report REFERENCE

1.

Entergy Letter No. 2.03.045, Pilgrim Station 2003 On-Line and Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Plan, dated April 14, 2003 LETTER NUMBER:

2.03.094 The enclosed report provides a tabulation of all inservice examinations and code repairs/replacements performed at Pilgrim Station from the end of RFO-13 through RFO-14.

The scope of RFO-14 inservice Inspection was described in Reference 1.

Changes from the RFO-14 ISI Plan (Reference 1) are as follows:

Four recirculation system N2 inlet nozzle dissimilar metal safe-end-welds were not examined due to automated scanner mechanical problems experienced by the inspection vendor. These four welds will be examined In accordance with BWRVIP-75 and Supplement 10 to Appendix VIII/PDI requirements during RFO-15. This exception does not require relief from the ASME Code or 10 CFR 50.55a requirements, as 50.55a and code required examinations have been completed.

4 0'7

Entergy Nuclear Operations, Inc.

Letter Number 2.03.094 Pilgrim Nuclear Power Station Page 2

  • Of the total 12 vertical shell welds, 8 were examined using the IHI AIRIS remote scanning tool as opposed to the 6 scheduled welds.

The entire RPV shell-to-flange weld was examined during RFO-14 from the vessel interior side from two directions using IHI AIRIS tool with Appendix VIIIPDI techniques.

A total of 65 (out of 72) ultrasonic examinations for flow-accelerated corrosion effects were performed in accordance with NRC Generic Letter 89-08.

Seven planned examinations were postponed to RFO-15 due to schedule constraints.

Three jet pump beams were examined for mid-span cracking as part of the in-vessel examination. One core spray weld was examined to IE Bulletin 80-13 sensitivity.

In-service visual examinations of replaced CRD bolting were not performed due to a recent change in 10 CFR 50 that eliminates this inspection requirement for CRD bolting that is not re-used. Pre-service visual examinations of the new bolting were performed.

Copies of examination vendor reports and data sheets are retained at Pilgrim Station for NRC review, if required.

This submittal fulfills the requirements of ASME Section Xl, 1989 Edition, Paragraph IWA-6230 and is in compliance with 10 CFR 50.55(g)(5) requirements.

If you have any questions regarding the information contained in this letter, please contact Bryan Ford at (508) 830-8403.

William J. Riggs

Enclosure:

Inservice Inspection Summary Report for Refuel Outage 14 At Pilgrim Nuclear Power Station, dated April 2003 (35 pages) cc:

Mr. Travis Tate, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. NRC, Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station

II INSERVICE INSPECTION

SUMMARY

REPORT FOR REFUEL OUTAGE 14 AT PILGRIM NUCLEAR POWER STATION APRIL 2003 Prepared by Date Reviewed by (

I f

Date 7./3 /3 Approved by Date 7/s/r3

V Table of Contents 1.0 Executive Summary 1.1 Tables Table 1 Table 2 Table 3 Table 4 Table 5 Table 6 Table 7 ISI Examinations Performed On-line Prior to RFO#14 by Entergy and Scientech Corp.

Augmented Pressure Boundary Only (PBO) Non-Q Visual Examinations per Specificaton M-593 ISI Examinations Performed During RFO#14 by Entergy, Framatome and Scientech Corp.

RF014 Flow-Accelerated Corrosion Examinations RF014 ISI Outage and Online Maintenance Requests Non-scheduled ISI Visual Examinations Performed 2001-2003 RF014 Corrective Action Document listing 2.0 NIS-1 and NIS-2 Code Report Forms for ASME XI Repairs and Replacements 2.1 RF014 NIS-Form 2.2 RFO14 NIS-2 Forms 3.0 Data and Vendor Reports (on file at Pilgrim) 3.1 Scientech (NES) Corp. Final Report of Inservice Examinations at Pilgrim Station during Refueling Outage 14 (1 volume) 3.2 General Electric Corp. Final Report of Invessel Examinations at Pilgrim Station during Refueling Outage 14 (1 volume) 3.3 Framatome and IHI Southwest Corp. Final Report of Reactor Pressure Vessel Shell Weld Examinations at Pilgrim Station during Refueling Outage 14 (1 volume) 3.4 Framatome 2003 Section Xl Inservice Inspection Final Report 3.5 Pilgrim-generated RF014 ISI Data Reports (1 volume)

Page 2 of 35

1.0 EXECUTIVE

SUMMARY

This report documents the inservice inspection (IS1), preservice inspection (PSI) and augmented examinations performed at Pilgrim Nuclear Power Station (PNPS) for the period from the end of Refueling Outage 13 to the end of Refueling Outage 14. The examinations performed for all ASME Section XI code categories are included in the third period of the Third Ten Year Inspection Interval of the PNPS ISI Program.

Pilgrim has inspected Class 1 category B-J and B-F welds since 2001 (RFO13) using a partial-scope Risk-Informed ISI Program in accordance with NRC Safety Evaluation Report (TAC No. MB0841) as detailed in NRC letter to Entergy 1.1.01.046. Pilgrim also employes BWRVIP-75 scheduling guidelines for Category C, D and E austenitic stainless steel piping welds in accordance with the NRC Safety Evaluation Report (TAC No. MA5012) dated September 15, 2000 as an alternative to Generic Letter 88-01 inspection schedules.

Types of examinations performed:

ASME XI inservice and preservice visual, surface and volumetric examinations of piping, bolting, valves and supports.

ASME XI subsection IWE visual and ultrasonic examinations of containment per PNPS procedure QA 20.03 and the General Visual Walkdown of Primary Containment in accordance with PNPS procedure 2.1.8.7.

Augmented manual ultrasonic (UT) examinations for intergranular stress corrosion cracking (1GSCC) per Generic Letter 88-01 as modified by BWRVIP-75.

Augmented UT examinations of high energy piping for flow-assisted corrosion (FAC) per Generic Letter 89-08 and Specification M-577.

  • Visual examination of invessel Core Spray piping in accordance with BWRVIP guidelines, in addition to various other invessel visual examinations.

Augmented UI examination of one Salt Service Water piping spool in accordance with Specification M-591 (Generic Letter 89-13).

System pressure tests for ISI Class 2 and 3 piping for the second period of the Third Interval ISI Program.

Page 3 of 35

Examination Details Piping, bolting and valve examinations were conducted in accordance with ASME Section M 1989 edition, Code Case N-491 for supports and Entergy letter to NRC 1.2.03.45 which provided the scope of the on-line and RF0#14 outage examinations. Containment examinations were performed in accordance with ASME XM 1992 edition with 1992 Addenda subsection IWE as modified by the Code of Federal Regulations. Scientech (NES)

Corp. was the vendor for a portion of the online scope and all non-RPV ISI examinations performed during the refueling outage. Framatome Corp. performed all nozzle and Reactor Pressure Vessel weld examinations during RFQ 14. General Electric Corp. performed all invessel examinations during the outage. Entergy Quality Control personnel performed the balance of on-line examinations prior to RFO#14.

Regarding Entergy letter 1.2.03A5, "Pilgrim Station 2003 On-Line and RF014 Inservice Inspection (ISI) Plan":

All planned examinations described in the ISI plan letter were completed with the exception of certain lVVI examinations and four Recirculation system nozzle-to-safe end dissimilar metal welds (described below).

The examination of four N2 nozzle-to-safe end dissimilar metal welds (N2D, E, F, J nozzles) in accordance with BWRV1P-75 and Supplement 10 Appendix VMIPDI requirements was deferred to RFO 15 due to automated scanner mechanical problems experienced by the ISI inspection vendor.

In addition to the 6 RPV shell vertical welds planned for REO 14 examination, two other vertical shell welds were also examined using the IHI AIRIS remote scanning tool. The remaining 4 vertical shell welds will be examined during RF015.

The entire RPV shell-to-flange weld was examined during RFQ14 from the vessel interior side from two directions using the URI AIRIS tool with Appendix VIIIIPDI techniques.

A total of 65 ultrasonic examinations for flow-assisted corrosion effects were performed in accordance with Generic Letter 89-08. Seven examinations were postponed due to schedule.

Inservice visual examinations of replaced CRD bolting were not performed due to a recent change in 10CFR5O that eliminates this inspection requirement for bolting that is not re-used.

Ultrasonic wall thickness examination was performed (on-line) on one rubber-lined carbon steel Salt Service Water (SSW) pipe spool in accordance with Specification M-591 and Generic Letter 89-13. The planned replacement of 7 SSW pipe spools was completed as part of the SSW Pipe Replacement Project during RF014.

Page 4 of 35

A total of 4 Nonconformance Reports and 2 Condition Reports were issued which are tabulated in Table 7.

Various system pressure tests for ISI Class 2 and 3 piping were conducted for the second period of the Third Interval ISI Program.

In Vessel Examinations (by General Electric)

The report of the invessel activities has been provided to the BWRVIP database maintained by EPRI. A summary of the results is provided here.

All examinations stated in Entergy letter 1.2.03.45 were completed with the following two clarifications. No indications were found.

0 Three jet pump beams were visually examined for mid-span cracking.

One Core Spray weld was examined to IE Bulletin 80-13 sensitivity.

Containment Examinations (BWE)

Augmented and program examinations were performed for the containment IWE examination program in accordance with PNPS procedure QA 20.03 and ASME XI 1992 edition with 1992 Addenda as modified by the Code of Federal Regulations.

Page 5 of 35

Table I ISI EXAMINATIONS PERFORMED ON-LINE PRIOR TO RF014 By Entergy and Scientech Corporation E~~~~~~~~-

E-Ze=_1 10-E2078-N3-2 10-E207B-N3-3 10-E207B-N4-2 10-E207B-N4-3 GB-10-12HL1(4)

GB-10-I9HLI(4)

HB-10-28HL1(2) 3-WSD-5 GB-14-F39 GB-14-F40 HD-1l4-2-2D HD-14-F19 HL-23-F22 1B-1i3-2-11A HD-13-F35 HE-26-F42A GB-10-12-2D GB-10-3002-2-2 GB-10-9-2E GB-10-F1t16 GB-10-Fl53R GB-10-F17 SHELL REINF PLATE NOZZLE REINF PLATE SHELL REINF PLATE NOZZLE REINF PLATE SUPPORT LUGS SUPPORT LUGS 2 HANGER LUGS ELBOW TO PIPE PIPE TO VALVE PUMP TO PIPE REDUCER TO FLANGE VALVE TO ELBOW NOZZLE TO PIPE FLANGE TO ELBOW PIPE TO VALVE ELBOW TO VALVE WELDOLET TO PIPE ELBOW TO PIPE WELDOLET VALVE TO TEE PIPE TO VALVE PIPE TO ELBOW C-B C-B C-B C-B C-C C-C C-C C-F-2 C-F-2 C-G-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 C-F-2 RHR RHR RHR RHR RHR RHR RHR CRD CS CS CS CS HPCI RCIC RCIC RCIC RHR RHR RHR RHR RHR RHR ISI-E207B ISI-E207B ISI-E207B ISI-E207B ISI-1-10-4BSH1 ISI-1-10-4BSH1 ISI-I-10-lB ISI-1-3-1 ISI-1-14-2B ISI-1-14-2B ISI-1-14-2B ISI-1-14-2B ISI-I-23-4 ISI-1-13-3 S1-I--13-2 ISI-1-13-4 ISI-1-10-5BSH1 ISI-1-10-4ASH2 ISI-1-10-4BSH1 ISI-1-10-3A ISI--10-5BSH1 ISI-1-10-4BSH1 MT MT MT MT MT MT MT MT UT MT UT MT UT MT UT MT UT MT UT MT UT MT UT MT UT MT UT MT UT MT UT MT UT MT UT MT UT Page 6 of 35

Table 1 ISI EXAMINATIONS PERFORMED ON-LINE PRIOR TO RF014 By Entergy and Scientech Coxporation Coonent iDescriptiobrn^

C£ategory System T4;omefticim-

=

iz GB-10-F59A DB-23-VBW10-1 DB-23-VBWIO-2 30-El22A-HL 30-E209A-HL HE-30-104PS HE-30-12HL HE-30-238PS HE-30-24HL HE-30-26HL HE-30-27PS HE-30-346HL 29-P208A-HL IWE-TORUS-LOWER-B1 IWE-TORUS-LOWER-B133 IWE-TORUS-LOWER-B5 IWE-TORUS-LOWER-B9 IWE-TORUS-MWL-B1 IWE-TORUS-MWL-B13 PIPE TO VALVE VALVE BODY WELD VALVE BODY WELD HX INTEGRAL ATTMT HX INTEGRAL ATTMT STANCHION HANGER LUG STANCHION HANGER LUG HANGER LUG STANCHION HANGER LUG PUMP INTEGRAL ATTMT AUGMENTED TORUS UT elev.-1 1ft 6in BAY 1 AUGMENTED TORUS UT elev.-11ft 61n BAY 13 AUGMENTED TORUS UT elev.-1 1ft 6in BAY 5 AUGMENTED TORUS UT elev.-1 1ft 6in BAY 9 AUGMENTED TORUS UT AT MWL BAY 1 AUGMENTED TORUS UT AT MWL BAY 13 C-F-2 C-G C-G D-B D-B D-B D-B D-B D-B D-B D-B D-B D-B E-C E-C E-C E-C E-C E-C RHR HPCI HPCI RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW SSW CONT CONT CONT CONT CONT CONT ISI-1-1 0-5BSH2 ISI-1-23-5 ISI-I-23-5 ISI-E122A ISI-E209A ISI-1-30-1SH2 ISI-1-30-1 SH2 ISI-1-30-2SH1 ISI-1-30-2SH1 ISI-1-30-2SH1 ISI-1-30-2SH2 ISI-1-30-2SH1 ISI-1-29-1 SH2 ISI-IWE-AUG-1 ISI-IWE-AUG-1 ISI-IWE-AUG-1 ISI-IWE-AUG-1 ISI-IWE-AUG-1 ISI-IWE-AUG-1 MT UT MT MT VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 UT UT UT UT UT UT Page 7 of 35

Table 1 ISI EXAMINATIONS PERFORMED ON-LINE PRIOR TO RF014 By Entergy and Scientech Corporation

-D=s_

Copnen-t

.Dcipin Caeoy Sytm AmtrcEm.

IWE-TORUS-MWL-B5 IWE-TORUS-MWL-B9 H-SO-1-TORUSBAY5 H-3-1-22 H-3-1-30 H-3-1-38 H-14-1-12 H-14-1-15 H-1 4-1-P21 5A H-23-1-X52 H-26-1-318 H-30-1-63SA H-1 3-1-P206 H-26-1-194 H-26-1-56 H-10-1-106 H-10-1-107S H-10-1-131 H-10-1-179 H-1 0-1-5 H-10-1-54SH AUGMENTED TORUS UT AT MWL BAY 5 AUGMENTED TORUS UT AT MWL BAY 9 TORUS SUPPORTS RESTRAINT RESTRAINT RIGID SUPPORT RIGID HANGER SPRING HANGER PUMP SUPPORT ANCHOR SPRING HANGER ANCHOR PUMP SUPPORT RIGID SUPPORT RIGID HANGER RIGID HANGER RIGID HANGER RIGID HANGER SPRING HANGER SPRING HANGER RIGID HANGER Pal E-C E-C F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A ge 8of35 CONT CONT CONT CRD CRD CRD CS CS CS HPCI HPCI RBCCW RCIC RCIC RCIC RHR RHR RHR RHR RHR RHR ISI-IWE-AUG-1 ISI-IWE-AUG-1 C1A175SH1 &

Cl A-62-4 IS1-1-3-1 ISI-1-3-1 ISI-1-3-1 ISI-1-1 4-2B ISI-1-14-2B ISI-P21 5A ISI-1-23-1 ISI-I-23-4 ISI-1-30-2SH1 ISI-1-13-2 ISI-1-13-5 ISI-1-13-5 ISI-1-10 -5BSH1 ISI-1-1 0-4BSH1 ISI-1-1 0-4BSH1 ISI-1-104BSH1 ISI-1-1 0-1 B ISI-1-1 0-1 B UT UT VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3

Table I ISI EXAMINATIONS PERFORMED ON-LINE PRIOR TO RF014 By Entergy and Scientech Corporation H-10-1-65 SPRING HANGER F-A RHR ISI-1-10-4BSH2 VT-3 H-10-1-94S RESTRAINT F-A RHR ISI-1-10-3B VT-3 H-10-1-96S GUIDE F-A RHR ISI-1-10-3B VT-3 H-10O1-P203A PUMP SUPPORT F-A RHR ISI-P203A VT-3 H-10-1-X51A ANCHOR F-A RHR ISI-I-10-1 VT-3 H-12-1-100 RIGID HANGER F-A RWCU ISI-1-12-2 VT-3 H-12-1-5 GUIDE F-A RWCU ISI-1-12-2 VT-3 H-29-1-36 RIGID HANGER F-A SSW ISI-1-29-1SH2 VT-3 H-29-1-53 RESTRAINT F-A SSW ISI-1-29-1SH1 VT-3 H-29-1-P208A PUMP SUPPORT F-A SSW ISI-1-29-ISH2 VT-3 Page 9 of 35

Table 2 AUGMENTED PRESSURE BOUNDARY ONLY (PBO) NON-Q VISUAL EXAMINATIONS PERFORMED ONLINE PER SPECIFICATION M-593 omoetDeciton-K Sstn smerc Ea H-30-1-102SR H30-1O-1 03SR H-0-1-107 H-0-1i-108SH H-0-1-1i1 4SR H-S0-1-171 H-0-1-174 H-30-1-297 H-30-1-318 H-30-1-95SR H-0-1-98SH H-0-1 -99SA H1-30-1-E206B H-0-1 -E21 1 A H-3O- -E21 6A RIGID SUPPORT RIGID SUPPORT RIGID SUPPORT SPRING HANGER RIGID SUPPORT RIGID SUPPORT RIGID SUPPORT RIGID SUPPORT RIGID SUPPORT RIGID SUPPORT SPRING HANGER ANCHOR HEAT EXCHANGER SUPPORT HEAT EXCHANGER SUPPORT HEAT EXCHANGER SUPPORT RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW RBCCW ISI-1-30-4SH 1 ISI-1-30-4SH1 ISI-1-30-4SHI1 ISI-1-30-4SH1 ISI-1-30-4SH1I ISI-1-30-4SH2 ISI-1-30-5 ISI-1-30-4SHI ISI-1-30-4SH2 ISI-1-30-4SH2 ISI-1-30-4SH2 ISI-1-30-4SH2 ISI-I-30-4SH2 ISI-1-30-5 ISI-1-30-4SH2 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 Page 1Oof35

Table 3 ISI EXAMINATIONS PERFORMED DURING RFO14 By Entergy, Framatome Corporation and Sclentech Corporation Componen

-Deiiiiton

~7KCtgi Ss isometl-Eai RPV--1-38B LOWER INTERMEDIATE SHELL VERTICAL B-RV 5---1 U

RPV-L-1-338B WEDB-A RPV ISI-1-54-1 UT WELD RPV-L-1-339A UPPER SHELL VERTICAL WELD B-A RPV ISI-1-54-1 UT RPV-L-1-339B UPPER SHELL VERTICAL WELD B-A RPV ISI-1-54-1 UT RPV-L-1-339C UPPER SHELL VERTICAL WELD B-A RPV ISI-1-54-1 UT RPV-L-2-338B RPV-L-2-339A RPV-L-2-339B RPV-L-2-339C LOWER SHELL VERTICAL WELD UPPER INTERMEDIATE SHELL VERTICAL WELD UPPER INTERMEDIATE SHELL VERTICAL WELD UPPER INTERMEDIATE SHELL VERTICAL WELD B-A B-A B-A B-A RPV ISI-1-54-1 RPV ISI-1-54-1 RPV ISI-1-54-1 RPV ISI-1-54-1 UT UT UT UT RPV-SF-0-1 20 RPV-SF-1 20-240 RPV-SF-240-360 RPV-N2D-NIR RPV-N2D-NV RPV-N2E-NIR RPV-N2E-NV RPV-N2F-NIR RPV-N2F-NV RPV-N2J-NIR RPV-N2J-NV RPV-N4A-NIR RPV-N4A-NV RPV-N4B-NIR RPV-N4B-NV RPV-N4C-NIR RPV-N4C-NV RPV-N4D-NIR RPV-N4D-NV SHELL TO FLANGE SHELL TO FLANGE SHELL TO FLANGE NOZZLE INNER RADIUS NOZZLE TO VESSEL NOZZLE INNER RADIUS NOZZLE TO VESSEL NOZZLE INNER RADIUS NOZZLE TO VESSEL NOZZLE INNER RADIUS NOZZLE TO VESSEL NOZZLE INNER RADIUS& BORE NOZZLE TO VESSEL NOZZLE INNER RADIUS& BORE NOZZLE TO VESSEL NOZZLE INNER RADIUS& BORE NOZZLE TO VESSEL NOZZLE INNER RADIUS& BORE NOZZLE TO VESSEL B-A B-A B-A B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D B-D RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV RPV IS1-1-54-1 IS1-1-54-1 ISI-1-54-1 1SI-1-54-1 1S51-I54-1 ISI-1-54-1 1S1-1-54-1 ISI-1-54-1 ISI-1-54-1 ISI-1-54-1 1S1-1-54-1 1SI-1-54-1 1SI-1-54-1 ISI-1-54-1 1SI-1-54-1 1S1-1-54-1 ISI-1-54-1 ISI-1-54-1 IS1-1-54-1 UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT UT Page 1 of 35

Table 3 ISI EXAMINATIONS PERFORMED DURING RFO14 By Entergy, Framatome Corporation and Scientech Corporation Combnnt esiptdi 2Ctgry'-kse sbint RPV-N9B-NV RPV-N9B-1 1441-YB-I400-61B I4-VB-1400-9B 23-VB-2301-5 23-VB-2301-7 23-VB-2301 -8 13-VB-1301-17 2R-FB-BP-i A 2R-FB-BPA-1 2R-FB-NIA-7BC-1 2-VB-202-5A 2-VB-63B 10-YB-i1001 -33B 1 0-VB-i1001 -68B 12-VB-1201-80 14-A-17 14-A-18 14R-A-16 14R-B-16 6-N4C-2 6-N4D-2 13-1-16 2R-HA-1 2R-HA-4 10-0-24 10-0-25 NOZZLE TO VESSEL NOZZLE TO SAFE END VALVE BOLTING VALVE BOLTING VALVE BOLTING VALVE BOLTING VALVE BOLTING VALVE BOLTING FLANGE BOLTING FLANGE BOLTING FLANGE BOLTING VALVE BOLTING VALVE BOLTING VALVE BOLTING VALVE BOLTING VALVE BOLTING PIPE TO PENETRATION PIPE TO PIPE PENETRATION TO ELBOW PENETRATION TO ELBOW PIPE TO PIPE PIPE TO PIPE VALVE TO PIPE HEADER TO BEND HEADER TO BEND PIPE TO PIPE PIPE TO PIPE B-D B-F B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-G-2 B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J B-J RPV RPV CS CS HPCI HPCI HPCI RCIC RECIRC RECIRC RECIRC RECIRC RECIRC RHR RHR RWCU CS CS CS Cs FW FW RCIC RECIRC RECIRC RHR RHR ISI-1-54-1 ISI-1-54-4 ISI-1-14-1 ISI-1-14-1 ISI-1-23-1 ISI-1-23-1 ISI-1-23-1 ISI-1-13-1 ISI-1-2R-B ISI-1-2R-A ISI-1-2R-B ISI-1-2R-A ISI-1-2R-B ISI-1-10-1 ISI-1-10-1 ISI-I-12-2 ISI-1-14-1 ISI-1-14-1 ISI-1-14-1 ISI-1-14-1 ISI-1-6-1 ISl-1-6-1 ISI-1-13-1 ISI-1-2R-A ISI-1-2R-A ISI-I-i0-1A ISI-1-10-1A UT UT VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 UT UT UT UT UT UT UT UT UT UT UT Page 12of35

Table 3 ISI EXAMINATIONS PERFORMED DURING RFO14 By Entergy, Framatome Corporation and Scientech Corporation opone De5crip Von::

10R-IA-4 ELBOW TO PIPE 1OR-IA-6 PIPE TO VALVE 1OR-IA-7 VALVE TO PIPE 12-1-26 ELBOW TO PIPE 12-1-27 PIPE TO ELBOW 12-0-28R PIPE TO ELBOW 6-N4B-5HL1(4)

SUPPORT LUG CLASS I HYDRO CLASS 1 HYDRO DC-14-Fl PIPE TO VALVE

,=?

Categry j

B-J RHR ISI-1-10-1 UT B-J RHR ISI-1-10-1 UT B-J RHR ISI-1-10-1 UT B-J RWCU ISI-1-12-2 UT B-J RWCU ISI-1-12-2 UT B-J RWCU ISI-1-12-1SH1 UT B-K-1 FW ISI-1-6-1 MT B-P VARIOUS VARIOUS VT-2 C-F-1 CS ISI-1-14-1 PT UT DC-10-FlOR DC-10-F9 DE/DL-6-F68 EE-1-F138 DB-14-VBW24A-1 DB-1 4-VBW24A-2 1-GE-X208A-HL IWE-GVWD-01 IWE-ANNDRN-080 IWE-ANNDRN-170 IWE-ANNDRN-260 IWE-ANNDRN-350 IWE-LINERDRAINS IWE-CB-GIBS135 IWE-CB-GIBS1 80 IWE-CB-X203D IWE-CB-X203E IWE-CB-X203F H-2-1-HI0 PIPE TO VALVE PIPE TO VALVE REDUCER TO VALVE VALVE TO PIPE VALVE BODY WELD VALVE BODY WELD INTEGRAL ATTACHMENT GENERAL VISUAL WALKDOWN ANNULUS DRAINS(2) AT 80 AZ.

ANNULUS DRAINS(2) AT 170 AZ.

ANNULUS DRAINS(2) AT 260 AZ.

ANNULUS DRAINS(2) AT 350 AZ.

LINER DRAINS CONTAINMENT BOLTING CONTAINMENT BOLTING CONTAINMENT BOLTING CONTAINMENT BOLTING CONTAINMENT BOLTING SPRING HANGER C-F-1 C-F-1 C-F-2 C-F-2 C-G C-G D-B E-A E-C E-C E-C E-C E-C E-G E-G E-G E-G E-G F-A RHR ISI-I 4BSHI RHR ISI-I-1 0-4ASH2 FW ISI-I-6-1A MS ISI-I-1-1SH2 CS ISI--1 4-2A CS ISI-1-1 4-2A MS ISI-1-1-1 SHI1 CONT ISI-IWE-CONT AUG-i COTISI-IWE-CONT AUG-i CONT ISI-IWE-CONT AUG-I CONT ISI-IWE-CONT

/AUG-COTISI-IWE-COTAUG-i COTISI-IWE-CONT AUG-2 CONT N/A CONT N/A CONT N/A CONT N/A UT PT UT MT UT MT UT MT MT VT-3 GV VT-2 VT-2 VT-2 VT-2 VT-2 VT-1 VT-1 VT-1 VT-1 VT-1 VT-3 CONT RECIRC N/A ISI-I-2R-A Page 13of35

Table 3 ISI EXAMINATIONS PERFORMED DURING RFO14 By Entergy, Framatome Corporation and Sclentech Corporation

-~~~~

-~~~~~,-~~~~---~~~~~~

- -.-~~~~~~~..

1 1 --1 19 9-N -

1--

-1 1-1_

Compohentv

=

sr H-2-1-SS5 SNUBBER H-10-1-175 SPRING HANGER H-6-1-59 RIGID HANGER H-6-1-67 RIGID HANGER H-1-1-204 RIGID SUPPORT H-1-1-205 RIGID SUPPORT H-1-1-45 RIGID HANGER Caegoy ysemIomerc exta F-A RECIRC ISI-1-2R-A VT-3 F-A RHR ISI-1-10-1 VT-3 F-A-CL4 FW ISI-1-6-1A VT-3 F-A-CL4 FW ISI-1-6-1A VT-3 F-A-CL4 MS ISI-1-1-1SH2 VT-3 F-A-CL4 MS ISI-I-S-I SH2 VT-3 F-A-CL4 MS ISI-I-1-1SH2 VT-3 Page 14 of 35

Table 4 FLOW ACCELERATED CORROSION EXAMINATIONS PERFORMED ON LINE AND DURING RFO14 FAC COMPONENT

_'FAC tDRI O

ST 111 (online)

GE1 8-8-12-1 E CONDENSATE 14 154.3 GE18-21-5-1P CONDENSATE 14 233 GF18-21-5-1E CONDENSATE 14 240 (18") GE18-17-1-1R CONDENSATE 18 2

GF16-4-5-1E EXTR STEAM 12.75 29 HF1(B)16-1E EXTR STEAM 24 194.3 HF16-FSK-3-3E EXTR STEAM 1.9 196.91 HE25-12-1-1E EXTRSTEAM 3.5 196.94 HE25-12-1-2E EXTR STEAM 3.5 225.3 (16') GF16-2-2-1D EXTR STEAM 16 271 HF(A)-16-2N EXTR STEAM 24 281.1 E-103B HEATER SHELL EXTR STEAM N/A 290.2 HF16-11-1-1E EXTR STEAM 30 290.3 HF16-10-1-1E EXTR STEAM 30 297 GF16-4-2-2E EXTR STEAM 14 349 HF1 6-2-6-1 N EXTR STEAM 12.75 351 HF16-7-5-2E EXTR STEAM 3.5 367 HF16-7-4-1EP EXTR STEAM 3.5 368 HF16-7-4-2E EXTR STEAM 3.5 369 HF16-7-4-3E EXTR STEAM 3.5 373 E-105B Htr Shell EXTR STEAM n/a 377 HF1 6-9-5-1 E EXTR STEAM 3.5 206.1 DE6-13-1-1 E FW 12 238 (16") DE6-14-2-1T FW 16 296 (12") DE6-13-1-1T FW 12.75 307.1 DE6-12-2-1 EP FW 4.5 354 DE6-3-3-2E FW 16 356 DE6-1-2-1 E FW 4.5 359 DE6-6-2-1 E FW 24 361 DL6-3-3-1 E FW 12.75 Page 15 of 35

Table 4 FLOW ACCELERATED CORROSION EXAMINATIONS PERFORMED ON LINE AND DURING RFO14 FAC COMONENT A

362 DE6-10-3-i E FW 16 363 DE6-11-2-IT FW 6.625 364 DE6-12-6-2E FW 4.5 365 DE6-17-2-1 E FW 10.75 366 DE6-21-5-1 E FW 10.75 22 HE17-10-2-3E HTR VENTS/DRAINS 10.75 25.2 HE17-28-8-1TP HTR VENTS/DRAINS 16 56.1 (14-) HE17-2-4-1D HTR VENTS/DRAINS 14 286 HE17-2-4-ITP HTR VENTS/DRAINS 10.75 315 GE17-FSK2-3N HTR VENTS/DRAINS 6.625 318 HE17-5-1-1E HTR VENTS/DRAINS 2.875 319 HE1 7-32-8-1 E HTR VENTS/DRAINS 2.875 324 HE17-FSK-30-IN HTR VENTS/DRAINS 1.315 326 HE17-FSK-39-1oRP HTR VENTS/DRAINS 2.375 357 HE17-25-2-1E HTR VENTS/DRAINS 10.75 370 HE17-26-3-1 E HTR VENTS/DRAINS 6.625 371 HE17-32-6-1E HTR VENTS/DRAINS 2.875 374 HE17-35-1-1N HTR VENTS/DRAINS 12.75 375 HE17-18-2-1E HTR VENTS/DRAINS 12.75 381 Scope expansion for Pt 371 HTR VENTS/DRAINS 2.875 98 EE-7-3-1 P MS 10.75 191.3 (4m) EE-1-9-2-3T MS 4.5 200 (4-) HE-i-1-1-1T MS 4.5 254 EE-1-1-4-2E MS 2.375 258.1 (4") HE1-1-1-1R MS 4.5 263 SRM5-1 E MS 4.5 300 EBC(A)-1-1-2-1E MS 4.5 334 SP-EE-2-2-1VP MS 1.05 340 2SPE4-1 E MS 8.625 353 PS-1-3-2TP MS 20 Page 16 of 35

Table 4 FLOW ACCELERATED CORROSION EXAMINATIONS PERFORMED ON LINE AND DURING RFO14 355 EE-1-7-3-1E MS 3.5 342 (online)

D/S of R01301-7 RCIC 2.375 343 Pip dcs of CV1301-32 RCIC 1.315 352 Pip 5D to Stm Trap RCIC 1.315 128.2 d/s (2') DCA12-2P RWCU 2.375 Page 17 of 35

Table 5 RF014 ISI ONLINE AND OUTAGE MAINTENANCE REQUESTS ISI SCOPE 1115996 SSW A LOOP 1115989 CRD N/A 1115997 RWCU N/A 1115990 CONT N/A 1115987 Cs A LOOP 1115988 CS B LOOP 1115986 FW A LOOP 1115995 HPCI N/A 1115994 MS N/A 1115993 RBCCW A LOOP 1115992 RBCCW B LOOP 1115991 RCIC N/A 1116001 RECIRC N/A 1116000 RHR SDC/ A LOOP 1115999 RHR B LOOP 1115998 RPV NOZZLES S9905487 IWE GENERAL VISUAL WALKDOWN 1116003 RPV VERTICAL SHELL WELDS 1123031 IVVI 1123029 REMOVE INSUL. FROM N14 NOZZLE 1116004 CLASS 1 HYDRO FAC SCOPE 2102435 COND 2102434 EXTR STEAM Page 18 of 35

Table 5 RF014 ISI ONLINE AND OUTAGE MAINTENANCE REQUESTS ISI SCOPE 2102437 FW--

2102433 MS/MS Aux 2102439 HEATER VENTS & DRAINS 2102438 RWCU 3101279 E-103B HEATER SSW SPEC. M-591 SCOPE 2100993 SSW A LOOP Page 19 of 35

Table 6 NON-SCHEDULED VISUAL EXAMINATIONS PERFORMED 2001-2003

,7 I

w; i 7T;

xwmgmpvil v7m',_ _,,

1

-

-l-,`;-.;: -4

&-t



,,Z J

c 

i -

"l, ,

, -, 11 'f

-,  _.; I i

VT-13-03004 VT-54-03001 VT-54-03002 VT-54-03003 VT-54-03004 VT-54-03005 VT-54-03006 VT-54-03007 VT-54-03008 VT-54-03009 VT-54-03010 VT-54-03011 VT-54-03012 VT-54-03013 VT-54-03014 VT-54-03015 VT-54-03016 VT-54-03017 VT-1 -03010 VT-1 -03011 VT-29-03009 VT-29-03010 VT-29-0301 1 VT-50-03007 VT-1 -03008 VT-1-03009 VT-29-03005 VT-29-03006 VT-29-03007 VT-29-03008 M01301-53 CLASS 1 HYDRO-RB 51' CLASS 1 HYDRO-EAST CRD CLASS 1 HYDRO-WEST CRD CLASS I HYDRO-D/W 41',51 ',74' CLASS 1 HYDRO-D0W 93' CLASS 1 HYDRO-UNDERVESSEL CLASS 1 HYDRO-STEAM TUNNEL CLASS 1 HYDRO-DMV 9', 23' CLASS 1 HYDRO-B VLV ROOM CLASS 1 HYDRO-CRD REPAIR AREA CLASS 1 HYDRO-A VLV ROOM CLASS 1 HYDRO-D/W 83' CLASS 1 HYDRO-TIP ROOM CLASS 1 HYDRO-RWCU HX ROOM CLASS 1 HYDRO-RB 74' CLASS 1 HYDRO-RB 91' CLASS 1 HYDRO-TORUS ROOM H-1 SB1 H-1-1-SB2 29-HO-3884 29-HO-4B JF29-4-9, 9-6, 9-7, M03805 ANNULUS DRAINS (4)

H-1-1-SD2 H-i-1-SC2 JF29-3-2 & 3-3 JF29-5-4 & 6-1 29-HO-3819 29-HO-3882 RCIC RPV RPV RPV RPV RPV RPV RPV RPV_

RPV RPV RPV RPV RPV RPV RPV RPV RPV MS MS SSW SSW SSW CONT MS MS SSW SSW SSW SSW VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-3 VT-3 VT-2 VT-2 VT-2 VT-2 VT-3 (PARTIAL)

VT-3 (PARTIAL)

VT-2 VT-2 VT-2 VT-2 5/13/2003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/1012003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/10/2003 5/7/2003 5/7/2003 5/5/2003 5/5/2003 5/5/2003 5/3/2003 5/1/2003 5/1/2003 4/30/2003 4/30/2003 4/30/2003 4/30/2003 01122819 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 01116004 02107797 02107797 02100592 01125334

02104925, 02104125 01115990 02107797 02107797 10000862 02104926 03101776 02100591 Page 20 of 35

Table 6 NON-SCHEDULED VISUAL EXAMINATIONS PERFORMED 2001-2003 atish VT-30-03027 30-HO-457B RBCCW VT-2 4/30/2003 01119858 VT-1 -03006 H-1-1-SA2 MS VT-3 (PARTIAL) 4/29/2003 02107797 VT-1-03007 H-1-1-SC1 MS VT-3 (PARTIAL) 4/29/2003 02107797 VT-30-03026 30-HO-37 RBCCW VT-2 4/28/2003 01102755 VT-50-03003 IWE-LINERDRAINS CONT VT-2 4/25/2003 01115990 VT-50-03004 IWE-CB-X203D CONT VT-1 4/24/2003 01115990 VT-50-03005 IWE-CB-X203F CONT VT-1 4/24/2003 01115990 VT-50-03006 IWE-CB-X203E CONT VT-1 4/24/2003 01115990 VT-50-03002 ANNULUS DRAINS (4)

CONT VT-2 4/21/2003 01115990 03-V-097 VT-1 -03005 03-V-290 03-V-082 VT-30-02002 VT-10-02001 VT-30-02001 VT-10-02002 VT-i 1-01005 VT-31 -01001 VT-13-01003 VT-65-01003 VT-65-01002 NUTS/STUDS MRIR No. 01-0257 (32 NUTS & 8 STUDS)

SRV BASELINES HB-1 0-28HL1 (2)

SCREWCRD MOUNTING, CAP,GE137C9293P001 P-202C MECHANICAL SEAL SLT RHR-5 --- CONT.

SPRAY BETW. 23B & 26B VLVS.

II IGSCC POINTS IN TBCCW SLT RHR-10 -- CONT.

SPRAY BETW. 23A & 26A VLVS.

SLT SBLC-1 SLT AIR-1 SLT RCIC-2 SLT PASS-X228J SLT PASS-X228K RECIRC MS RHR CRD RBCCW RHR TBCCW RHR SBLC INST AIR RCIC PASS PASS VT-1 4/15/2003 N/A VT-3 VT-1 VT-i VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 4/1512003 4/6/2003 4/3/2003 7/2512002 4/4/2002 3/27/2002 2/812002 10/25/2001 10/25/2001 10/22/2001 8/2/2001 7/31/2001 03104547 1116000 2121619 01116967 02100488 S9904731 S002057 N/A N/A N/A S0007592 S0007593 Page 21 of 35

Table 7 RF014 CORRECTIVE ACTION DOCUMENT USTING

~~CON~~~~rnON.

~~.

IEPOTSIC~s OMPNEN

~~REJIJIARKS~~~~1; NCR 03-022 NCR 03-026 CR 03-01529 NCR 03-33 NCR 03-33 NCR 03-010 CR-2003-01095 CR-2003-01095 CR-2003-01095 CR-2003-01095 CR-2003-01095 CR-2003-01095 CR-2003-01095 CR-2003-01095 CR-2003-02021 290.2 HF16-11-1-1E 290.3 290.5 371 319 H-10-1-179 IWE-TORUS-LOWER-B1 IWE-TORUS-LOWER-B133 IWE-TORUS-LOWER-B5 IWE-TORUS-LOWER-B9 IWE-TORUS-MWL-B1 IWE-TORUS-MWL-B13 IWE-TORUS-MWL-B5 IWE-TORUS-MWL-B9 RECIRC PUMP P-201 A HF1G-10-1-1E HF1 6-11-2-1 E HE17-32-6-1 E HE1 7-32-8-1 E SPRING HANGER IWE TORUS SHELL UT WALL THICKNESS IWE TORUS SHELL UT WALL THICKNESS IWE TORUS SHELL UT WALL THICKNESS IWE TORUS SHELL UT WALL THICKNESS IWE TORUS SHELL UT WALL THICKNESS IWE TORUS SHELL UT WALL THICKNESS IWE TORUS SHELL UT WALL THICKNESS IWE TORUS SHELL UT WALL THICKNESS LEAKAGE DURING CLASS I PRESSURE TEST STEAM EXTRACTION STEAM EXTRACTION STEAM HEATER VENTS/DRAINS HEATER VENTS/DRAINS RHR CONTAINMENT CONTAINMENT CONTAINMENT CONTAINMENT CONTAINMENT CONTAINMENT CONTAINMENT CONTAINMENT RECIRC WALL THICKNESS < Tmin ACCEPT-AS-IS WALL THICKNESS < Tmin MAIN CONDENSERINTERNAL PIPING PATCH FAILED, EXISTING HOLE FOUND ENLARGED.

WALL THICKNESS c Tmin WALL THICKNESS < TmIn OPERABLE WITH LOOSE BOLTING IR 03-0145 IR 03-0145 IR 03-0145 IR 03-0145 IR 03-0145 IR 03-0145 IR 03-0145 IR 03-0145 ACCEPT-AS-IS REPLACED REPLACED REPLACED REWORK-ACCEPT-AS-IS ACCEPT-AS-IS ACCEPT-AS-IS ACCEPT-AS-IS ACCEPT-AS-IS ACCEPT-AS-IS ACCEPT-AS-IS ACCEPT-AS-IS ACCEPT-AS-IS Page 22 of 35

8 Table 7 RFO14 CORRECTiVE ACTION DOCUMENT LISTING 4

IE sON U1T IO NT CR-2003-02023 RPV LEAKAGE DURING CLASS I RPV MR 03109005 REWORK HEAD VENT PRESSURE TEST CR-2003-02024 VALVE LEAKAGE DURING CLASS I FEEDWATER MR 03109011 REWORK CR-2003-02025 CRD FLANGES LEAKAGE DURING CLASS I RPV ACCEPT-AS-IS PRESSURE TEST CR-2003-01 608 CONTAINMENT IWE GENERAL VISUAL CONTAINMENT ACCEPT-AS-IS WALKDOWN Page 23 of 35

2.0 NIS-1 and NIS-2 Code Report Forms 2.1 RFO14 NIS-1 Form Page 24 of 35

FORM NIS-1 OWNEW'S DATA REPORT FOR INSkRVICE INSPECTIONS As required by the Provisions of the ASME Code Rules Entergv

1.

Owner (Name and Address of Owner)

2.

Plant Pilgrim Nuclear Power Station. 600 Rockv Hill Road. Plymouth. MA 02360 (Name and Address of Plant)

3.

Plant Unit #1

4. Owner Certificate of Authorization (if required) N/A
5.

Commercial Service Date 12-9-72

6. National Board Number for Unit 20763
7.

Components Inspected Comnponent or Appurtenance Reactor Vessel Piping Manufacturer or Installer Combustion Eng. Bechtel Manufacturer or Installer Serial No.

66107 IState or Province No.

66207 National Board No.

20763 Note:

Supplemental sheets in form of lists, sketches, or drawings may be used provided:

(1) Size is 8i/2 in. x 11 in.

(2) Information in items 1 through 6 on this data report is included on each sheet.

(3) Each sheet is numbered and the number of sheets is recorded at the top of this form.

Page 25 of 35

FORM NIS-1

8.

Examination Dates:

5-20-01 to 5-13-03

9.

Inspection Interval from:

6-30-95 to 6-30-05

10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval. See ISI Summary Report
11. Abstract of conditions noted. See ISI Summary Report
12. Abstract of corrective measures recommended and taken. See ISI Summary Report and NIS-2 Forms We certify that the statements made in this report are correct and the examinations and corrective measures takes conform to the rules of the ASME Code, Section, Xl.

Date: 7/8/d/3 Signed:

Enter Byl Owner Manager Certificate of Authorization No. (if applicable) _

N/A Expiration Date:

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of MA and employed by ABSG Consulting Inc of Houston. TX have inspected the components described in this Owner's Data Report during the period of 5-20-01 to 5-13-03

.and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied concerning the examinations and corrective measures described in this Owner's Data Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date: God

-Commissions Ati-

_nspector'S National Board, State, Province, and No.

Page 26 of 35

2 2.2 RF014 NIS-2 Forms Page 27 of 35

Entergy Pigrim Nuclear Power Station Form NIS-2 Owner's Report

for Repairs or Replacements of S/C Items/Components RFO 14 - 2003 Prepared by:

Reviewed by:

Approved by:

Approved by:

Preparer Senio G Egner QA Manager ANH P Page 28 of 35

FORM NIS-2 OWNEWM REPORT FOR REPAPRIREPLACEMAENT ACTIVITY As Raquired by the Prov!Aons of the ASME Code, Section )a Entergy Louisiana. Inc.

4 r~

639 Loyola Ave. New Orleans, LA 70113 2.

Entergy Nuclear Generation 600 Rocky Kill Rd. Plymouth, MA 02360 Dat

-~IfbVs Unit 1

See Attached NIS-2 St-ary Form Tvpe Code Symbol Stamp N/A Authorization No -

N/A Eiration D N/A Work Performed w Pilgrim Nuclear Power Station 600 Rocky Hill Rd. Plymouth, MA 02360

4. Identification of System See Attached NIS-2 Summary Form
  • (alApplicable Conatrucdolo Code ANSI,R31-_1 1*

EdRkln..

Addenda, Wm Code Cin Cb)Appficable Editon of Section Xl Utilized for rRe placmnnent Activity a9 Winter 80 Addenda 1c Appile Se-onX Cod C N-416-1
6. IdentIficatIon of Components:

WASM Nadonas

Cawl, Sods arnn of Ka" a

of, Mbeamiac Board Year R

emod.

or Itmpd Cmponwd Mwutachm 54ia Ko No.

Other eadon lBut bkmtafd rrea o Mo)

7. Usacripuon or work
s. Tess Cond:cted
  • ydost 0 Pneumatic 0 Nominal Operating Presure O Exempt 0 Other 0 Prssr psl Tt Temp.

e MarE. Supplemntal sheets In form of Isbs; setches. or drawngs may be used, provided (11 du is % in. x it in. 0 Information In Iterns through 6 on tfi report Is Included on each shee end U) each she la numbered and number of shts Is recorded at th lop of this form.

V1901 This form IEUCM nwy be obtaied fom te Order DOpt. ASMF, 22 Law W., Box 2300. F

aKd, NJ 07007-2 Page 29 of 35

-11%iL,-

, -- -1 i.

W

'. 1. z.,

I I - -.

L,

! I

 k FORM lS-2 MBack)

See Attached N}S-2 Summary Forn R

WprtmN Manufacwrve' Dse% Rapoart lb me nadved CBERTIFIM7!O CPOcOUuANCE I eortf that the statemmnts made in the report are cont and tht this conforms to t equirements of the ASME Code, Section XL TVpe Code Symbol Starnp N/A Cearocate of Aulmz n

a q

N/A Expiration Detw Nlk

.ni mownses D.signa. -nos CERTIFICATE OF INSERVICE NSPECTION 1,ie tlw dralngned, holding a veild commission biud by the National Board of Bober and Pesre Vessel hupectos and the State or PmoInce of a

massachsettssnd mp dby ARC Cnnsulting

& Houston. TX how Inspected the eomponents decrbed InthlsOwner'sReportduningtheperlod 5-20-1 to 1

asdwaftthet lo th bet of my knwldge and belief, the Owner has performed etaminations and taken corrective measures descrbed hi this Own's. Report hI accordance with the equirements of the ASME Code. SectIon XL By signing this certificate nelther the Inspactor nor his employer makes any warranty, aspessd or Implied, concerning the examinations and conrective meesures described In this Owner's Report. Furthermore. neither the Inspector nor his employer shell be liable In any manner for any personal Iniury or property darna or a loss of any Idnd arising rorn or connected with this Inspection.

ommas MA 1420 inspedoes vanatA

~~~~~~Nationa Board. 9%tuk Pnalna aid Endorserronst Om1 x

Page 30 of 35

FORM NIS-2 OWNER'S

SUMMARY

REPORT FOR REPAIR OR REPLACEMENTS RFO 14 - 2003 PILGRIM NUCLEAR POWER STATION Rocky Hill Road, Plymouth, MA Construction Code B31.1. 1967 Edition. No Addenda. No Code Case 6

1 Name of System Name of Mfg.

Entergy or Nat. Brd.

MR Year

Repaired, ASME Description Of Test Component Ident.

Mfg.

SIN No.

Number Built Replaced or Code Work Conducted Replacement Stamped Performed Snubber RHR PSA 42205 SS-1-10-46 02106963 2001 Replacement No Replace VT-3 Snubber Snubber RHR PSA 42202 SS-1-10-21 02106962 2001 Replacement No Replace VT-3 Snubber Snubber RIHR PSA 42204 SS-1-10-16 02106961 2001 Replacement No Replace VT-3" Snubber Pipe SSW Entergy N/A JF29-5-4 02104926 2003 Replacement No Replace VT-2 at Spool Piece Normal PSI Pipe SSW Entergy N/A JF29-6-1 02104926 2003 Replacement No Replace VT-2 at Spool Piece Normal PSI Pipe SSW Entergy N/A JF29-3-2 10000862 2001 Replacement No Replace VT-2 at Spool Piece Normal PSI Pipe SSW Entergy N/A JF29-3-3 10000862 2001 Replacement No Replace VT-2 at Spool Piece Normal PSI Pipe SSW Entergy N/A JF29-4-9 02104925 2003 Replacement No Replace VT-2 at Spool Piece Normal PSI Pipe SSW Entergy N/A JF29-9-6 02104925 2003 Replacement No Replace VT-2 at Spool Piece Norm al PSI Pipe SSW Entergy N/A JF29-9-7 02104925 2003 Replacement No Replace VT-2 at Spool Piece Normal PSI Pump Bowl SSW Johnston N/A P-208D 19702057 1997 Replacement No Replace Pump VT-2 at Pump Bowl Assembly Normal PSI Co.

Pump SSW Johnston N/A P-208D 19702057 1997 Replacement No Replace Pump VT-2 at Columns Pump Columns Normal PSI Top/Int/Bot Co.

Top/Int/Bottom Page 31 of 35

FORM NIS-2 OWNER'S

SUMMARY

REPORT FOR REPAIR OR REPLACEMENTS RFO 14 - 2003 PILGRIM NUCLEAR POWER STATION Rocky Hill Road, Plymouth, MA Construction Code B31.1, 1967 Edition, No Addenda, No Code Case

'I

6. F1 Name of System Name of Mfg.

Entergy or MR Year

Repaired, ASME Description Of Test Component Ident.

Mfg.

S/N Nat. Brd. No.

Number Built Replaced or Code Work Conducted Replacement Stamped Performed Heat TBCCW EFCO S-E-122B P9700121 1997 Repair Yes Weld Repair of VT-2 at Exchanger 24767 Channel Shell Normal PSI Channel Heat RBCC EFCO E-209A P9900587 1967 Repair Yes Weld Repair of VT-2 at Exchanger W

24767 Channel Head Normal PSI Channel Partition Plates LPRM Reactor Vessel General Electric N/A 20-21,36-05, 20-27,36-13, 36-45,44-37 and 04-29 01119510 Replacement No Replace LPRM Detector String VT-2 During..

Class-i Leak Check Bolting Recirc.

N/A

'A' Recirc.

02104004 Replacement No Replace Decon.

VT-2 During Pump Decon.

Flange Bolting Class-1 Leak Flange Check Pipe Reactor Entergy N/A 1" EA Pipe 03106903 Replacement No Replace a Sect.

VT-2 During Vessel and Fittings of Rx Flange Class-i Leak Press. Indicator Check Piping Pump RBCC Durame.

N/A P-202C 10001849 Replaced No Replace Mech.

VT-2 at W

Seal on P-202C Normal PSI Safety MS Target Body N/A Contract 1987 Repair Yes Welded New Steam Cert.

Relief Rock S/N-12 No.

Seat to Body Test Valve 4500516308 Page 32 of 35

FORM NIS-2 OWNER'S

SUMMARY

REPORT FOR REPAIR OR REPLACEMENTS RFO 14 - 2003 df PILGRIM NUCLEAR POWER STATION Rocky Hill Road, Plymouth, MA C

Construction Code B31.1, 1967 Edition, No Addenda, No Code Case Name of System Name of Mfg.

Entergy or MR Year

Repaired, ASME Description Of Test Component Ident.

Mfg.

S/N Nat. Brd.

Number Built Replaced or Code Work Conducted No.

Replacement d

Performed Safety MS Target Rock Body N/A Contract No.

1987 Repaired Yes Corrected Steam Cert. Test Relief Valve S/N-12 4500516308 Weld Repair Inlet Flange Safety MS Target Rock Body N/A Contract No.

Replacement No Installed New Steam Cert. Test Relief Valve SIN-4500516308 Seat In Bbdy 259 Safety MS Target Rock Body N/A Contract No.

Repaired Yes Corrected Steam Cert. Test X Relief Valve S/N-4500516308 Honed Bore In l__________

131 B ase Safety MS Target Rock Body N/A Contract No.

Replacement Yes Welded New Steam Cert. Tesis Relief Valve SIN-13 4500516308 Seat to Body Safety MS Target Rock Body N/A Contract No.

Replacement No Installed New Steam Cert. Test-Relief Valve SIN-4500516308 Seat In Body 252 Valve CS Anchor/Darling N/A 14004B 01110163 1970 Replacement No Replace VT-2 During Wedge Class-1 Leak C h e c k Valve CS Anchor/Darling N/A 1400-4B 01110163 1970 Replacement No Replace VT-2 During Bolting Bolting Class-I Leak Check Page 33 of 35

FORM NIS-2 OWNER'S

SUMMARY

REPORT FOR REPAIR OR REPLACEMENTS RFO 14-2003 PILGRIM NUCLEAR POWER STATION Rocky Hill Road, Plymouth, MA Construction Code B31.1, 1967 Edition, No Addenda, No Code Case Name of System Name of Mfg.

Entergy or MR Year

Repaired, ASME Description Test Component Ident.

Mfg.

SIN Nat. Brd.

Number Built Replaced or Code Of Conducted No.

Replacement Stamped Work Performed Control CRD General N/A 02-35,02-01110401 1971 Replacement No Replace CRD

--VT-2 During Rod Drive Electric 39,06-11, and Bolting Class-I Leak 06-23, 14-Check 03, 14-19, 14-31, 18-03, 18-39, 42-11, 22-03, 22-23, 22-43,22-51, 26-39, 30-19, 18-07, 10-31, 30-31, 34-03, 30-35, 14-15,34-47,38-43, 42-31,02-31, 46-15, 46-23,46-27, 46-35, 50-15 Page 34 of 35

FORM NIS-2 OWNER'S

SUMMARY

REPORT FOR REPAIR OR REPLACEMENTS RFO 14 - 2003 PILGRIM NUCLEAR POWER STATION Rocky Hill Road, Plymouth, MA Construction Code B31.1, 1967 Editio No Addenda, No Code Case Name of System Name of Mfg.

Entergy or Nat. Brd.

MR Year

Repaired, ASME Description Of Test Component Ident.

Mfg.

S/N No.

Number Built Replaced or Code Work Conducted Replacement Stamped Performed Valve MS Target Main RV-203-3A 02101020 Replacement Yes Replace Main VT-2 During Rock Stage Stage & Bolting Class-1 Hydro Valve MS Target Main RV-203-3B 02101020 Replacement Yes Replace Main VT-2 During Rock Stage Stage & Bolting Class-i Hydro Valve MS Target Main RV-203-3C 02101020 Replacement Yes Replace Main VT-2 During Rock Stage Stage & Bolting Class-I Hydro Valve MS Target Main RV-203-3D 02101020 Replacement Yes Replace Main VT-2 During Rock Stage Stage & Bolting Class-I Hydro Valve Ms Dresser N/A RV-2034B 02108713 Replacement Yes Replace Relief VT-2 During Valve/Bolting Class-i Hydro Valve SSW Henry N/A MO-3805 02104125 Replacement No Replace Valve VT-2 at :

Pratt Normal PSI Valve RCIC Anchor N/A 1301-64 03108035 Repair Yes Disassemble &

VT-2 at Darling Repair In-Kind Normal PSI Valve SSW Henry N/A 29-HO-3819 03101776 Replacement No Replace Valve VT-2 at Pratt Nonnal PSI Valve SSW Powell N/A 29-HO-3882 02100591 Replacement No Replace Valve VT-2 at Normal PSI Valve SSW Powell N/A 29-HO-3884 02100592 Replacement No Replace Valve VT-2 at Normal PSI Snubber MS B/P N/A H1-1-SB1 02107797 2003 Replacement No Replace VT-3

_Snubber Snubber MS B/P N/A H1-1-SB2 02107797 2003 Replacement No Replace VT-3 Snubber Valve CS Anchor N/A MO-1400-4A 0112324 1970 Replaced No Replaced Worn VT-2 During I__I

.I_