2003 On-Line and Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Plan
ML031130118
Person / Time
Site: Pilgrim
Issue date: 04/14/2003
From: Riggs W
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.03.045
Download: ML031130118 (10)


Text

'F'Enterg yJ Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment April 14, 2003 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Pilgrim Station 2003 On-Line and Refueling Outage (RFO) - 14 Inservice Inspection (ISI) Plan LETTER NUMBER: 2.03.045

Dear Sir or Madam:

This letter provides the Pilgrim Nuclear PowerStation (PNPS) Inservice Inspection (ISI) Plan for 2003, on-line and Refueling Outage-14 (RFO-14) examinations. On-line ISI examinations began in March 2003. RFO-14 is currently scheduled to start on April 19, 2003. The scope of examinations includes the following:

1. Attachment A provides the ASME code required inspections that have been scheduled for examination on-line prior to RFO-1 4 during the third inservice inspection interval in accordance with the 1989 Edition of ASME Xl and the Pilgrim Inservice Inspection Program.
2. Attachment B provides the ASME code required inspections that have been scheduled for examination in RFO-14 during the third inservice inspection interval in accordance with the 1989 Edition of ASME Xl for piping and the 1992 Edition with 1992 Addenda for IWE containment examinations. Examinations of Category C, D, and E austenitic stainless steel piping welds in RFO-1 4 will be scheduled in accordance with the NRC Safety Evaluation issued on September 15, 2000 for BWRVIP-75, "Technical Basis for Revisions to Generic Letter 88-01 Inspection Schedules," in lieu of Generic Letter 88-01 inspection schedule requirements. Pilgrim Station meets the requirements of the BWRVIP-75 Safety Evaluation including the open items identified by the NRC in the Safety Evaluation. Additionally, Pilgrim will comply with ASME Xl Appendix VIII to the fullest extent possible allowed by current technology.
3. Attachment C provides examination planned for reactor vessel internals. Examinations include those planned to follow the BWRVIP Guidelines and those recommended by industry and internal initiatives.

203045 2431

Entergy Nuclear Operations, Inc. Letter Number: 2.03.045 Pilgrim Nuclear Power Station Page 2

4. Pilgrim will be inspecting piping for the effects of Flow Accelerated Corrosion (FAC) both on-line (2 points) and during RFO-14 (70 points).
5. Ultrasonic examinations of three Salt Service Water Piping Spools for wall thickness determination in accordance with Specification M-591 will be conducted online starting in March 2003.
6. Pilgrim will be inspecting 15 non-safety-related pipe supports and performing one leakage examination in accordance with Entergy Specification M-593, Augmented Inspection of Pressure Boundary Only (PBO) Piping and Components.

If you have any questions regarding the information contained in this letter, please contact Bryan Ford at 508-830-8403.

Sincerely, Attachment A: ASME Xi Inservice Inspection Plan for 2003 Online Examinations Prior to RFO-14 (3 pages)

Attachment B: ASME XI Inservice Inspection Plan for RFO-14 Examinations (4 pages)

Attachment C: Pilgrim Station RFO-14 In-Vessel Visual Inspection Scope (IVVI) (1 page) cc: Mr. Travis Tate, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. NRC, Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station 203045

ATTACHMENT A ASME Xi INSERVICE INSPECTION PLAN FOR 2003 ONLINE EXAMINATIONS Component Description Category Svstem Isometric Exam 1 0-E207B-N3-2 SHELL REINF PLATE C-B RHR ISI-E207B MT 10-E207B-N3-3 NOZZLE REINF PLATE C-B. RHR ISI-E207B MT 10-E207B-N4-2 SHELL REINF PLATE C-B RHR ISI-E207B MT 10-E207B-N4-3 NOZZLE REINF PLATE C-B RHR ISI-E207B MT GB-10-12HL1 (4) SUPPORT LUGS C-C RHR ISI-1-10-4BSH1 MT GB-10-19HL1 (4) SUPPORT LUGS C-C RHR ISI-I-10-4BSH1 MT HB-10-28HL1 (2) 2 HANGER LUGS C-C RHR ISI-1-10-1 B MT 3-WSD-5 ELBOW TO PIPE C-F-2 CRD ISI-1-3-1 MT UT GB-10-12-2D WELDOLET TO PIPE C-F-2 RHR ISI-1-10-5BSH1 MT UT GB-10-3002-2-2 ELBOW TO PIPE C-F-2 RHR ISI-1-10-4ASH2 MT UT GB-10-9-2E WELDOLET C-F-2 RHR ISI-I-1-0-4BSH1 MT UT GB-10-F116 VALVE TO TEE C-F-2 RHR ISI-1-10-3A MT UT GB-10-Fl53R PIPE TO VALVE C-F-2 RHR IS-I-1-0-5BSH1 MT UT GB-10-F17 PIPE TO ELBOW C-F-2 RHR ISI-I-10-4BSH1 MT UT GB-10-F59A PIPE TO VALVE C-F-2 RHR ISI-I-1-0-5BSH2 MT UT GB-14-F39 PIPE TO VALVE C-F-2 CS ISI-1-14-2B MT UT GB-14-F40 PUMP TO PIPE C-F-2 CS ISI-1-14-2B MT UT HB-13-2-i A FLANGE TO ELBOW C-F-2 RCIC ISI-1-13-3 MT UT HD-13-F35 PIPE TO VALVE C-F-2 RCIC ISI-1-13-2 MT UT HD-14-2-2D REDUCER TO FLANGE C-F-2 CS ISI-1-14-2B MT UT HD-14-F19 VALVE TO ELBOW C-F-2 CS ISI-1-14-2B MT UT HE-26-F42A ELBOW TO VALVE C-F-2 RCIC ISI-1-13-4 MT UT HL-23-F22 NOZZLE TO PIPE C-F-2 HPCI ISI-I-23-4 MT UT DB-23-VBW10-i VALVE BODY WELD C-G HPCI ISI-1-23-5 MT DB-23-VBW10-2 VALVE BODY WELD C-G HPCI ISI-1-23-5 MT 29-P208A-HL PUMP INTEGRAL ATTMT D-B SSW ISI-1-29-1 SH2 VT-3 30-El 22A-HL HX INTEGRAL ATTMT D-B RBCCW ISI-E122A VT-3 Page 1 of 3

ATTACHMENT A Component Description Category Svstem Isometric Exam 30-E209A-HL HX INTEGRAL ATTMT D-B RBCCW ISI-E209A VT-3 HE-30-104PS STANCHION D-B RBCCW ISI-1-30-1 SH2 VT-3 HE-30-12HL HANGER LUG D-B RBCCW ISI-1-30-1 SH2 VT-3 HE-30-238PS STANCHION D-B RBCCW ISI-I-30-2SH1 VT-3 HE-30-24HL HANGER LUG D-B RBCCW ISI-I-30-2SH1 VT-3 HE-30-26HL HANGER LUG D-B RBCCW ISI-I-30-2SH1 VT-3 HE-30-27PS STANCHION D-B RBCCW ISI-I-30-2SH1 VT-3 HE-30-346HL HANGER LUG D-B RBCCW ISI-I-30-2SH1 VT-3 IWE-LINERDRAINS LINER DRAINS E-C CONT ISI-IWE-AUG-2 VT-2 AUGMENTED TORUS UT elev.-1 Ift 6in BAY IWE-TORUS-LOWER-B1 1 E-C CONT ISI-IWE-AUG-1 UT IWE-TORUS-LOWER- AUGMENTED TORUS UT elev.-1 lft 6in BAY B13 13 E-C CONT ISI-IWE-AUG-1 UT AUGMENTED TORUS UT elev.-11ft 6in BAY IWE-TORUS-LOWER-B5 5 E-C CONT ISI-IWE-AUG-1 UT AUGMENTED TORUS UT elev.-11ft 6in BAY IWE-TORUS-LOWER-B9 9 E-C CONT ISI-IWE-AUG-1 UT IWE-TORUS-MWL-B1 AUGMENTED TORUS UT AT MWL BAY 1 E-C CONT ISI-IWE-AUG-1 UT IWE-TORUS-MWL-B13 AUGMENTED TORUS UT AT MWL BAY 13 E-C CONT ISI-IWE-AUG-1 UT IWE-TORUS-MWL-B5 AUGMENTED TORUS UT AT MWL BAY 5 E-C CONT ISI-IWE-AUG-1 UT IWE-TORUS-MWL-B9 AUGMENTED TORUS UT AT MWL BAY 9 E-C CONT ISI-IWE-AUG-1 UT H-10-1-106 RIGID HANGER F-A RHR ISI-I-10-5BSH1 VT-3 H-10-1-107S RIGID HANGER F-A RHR ISI-I-1-0-4BSH1 VT-3 H-10-1-131 RIGID HANGER F-A RHR ISI-1-10-4BSH1 VT-3 H-10-1-179 SPRING HANGER F-A RHR ISI-1-10-4BSH1 VT-3 H-10-1-5 SPRING HANGER F-A RHR ISI-1-10-1 B VT-3 H-10-1-54SH RIGID HANGER F-A RHR ISI-1-10-1 B VT-3 H-10-1-65 SPRING HANGER F-A RHR ISI-I-1-0-4BSH2 VT-3 H-10-1 -94S RESTRAINT F-A RHR ISI-1-10-3B VT-3 H-10-1-96S GUIDE F-A RHR ISI-1-10-3B VT-3 H-10-1-P203A PUMP SUPPORT F-A RHR ISI-P203A VT-3 Page 2 of 3

ATTACHMENT A Component Description Category System Isometric Exam H-10-1-X51A ANCHOR F-A RHR ISI-1-10-1 VT-3 H-1 2-1 -100 RIGID HANGER F-A RWCU ISI-1-12-2 VT-3 H-1 2-1-5 GUIDE F-A RWCU ISI-1-12-2 VT-3 H-1 3-1 -P206 PUMP SUPPORT F-A RCIC ISI-1-13-2 VT-3 H-14-1-12 RIGID HANGER F-A CS ISI-1-14-2B VT-3 H-1 4-1-15 SPRING HANGER F-A CS ISI-1-14-2B VT-3 H-1 4-1 -P215A PUMP SUPPORT F-A CS ISI-P215A VT-3 H-23-1 -X52 ANCHOR F-A HPCI ISI-1-23-1 VT-3 H-26-1 -194 RIGID SUPPORT F-A RCIC ISI-1-13-5 VT-3 H-26-1 -318 SPRING HANGER F-A HPCI ISI-I-23-4 VT-3 H-26-1-56 RIGID HANGER F-A RCIC ISI-1-13-5 VT-3 H-29-1 -36 RIGID HANGER F-A SSW ISI-1-29-1SH2 VT-3 H-29-1 -53 RESTRAINT F-A SSW ISI-1-29-lSH1 VT-3 H-29-1 -P208A PUMP SUPPORT F-A SSW ISI-1-29-1 SH2 VT-3 H-3-1 -22 RESTRAINT F-A CRD ISI-1-3-1 VT-3 H-3-1 -30 RESTRAINT F-A CRD ISI-1-3-1 VT-3 H-3-1 -38 RIGID SUPPORT F-A CRD ISI-1-3-1 VT-3 H-30-1 -63SA ANCHOR F-A RBCCW ISI-1-30-2SH1 VT-3 C1A175SH1 &

H-50-1 -TORUSBAY5 TORUS SUPPORTS F-A CONT Cl A-62-4 VT-3 Page 3 of 3

ATTACHMENT B ASME XI INSERVICE INSPECTION PLAN FOR 2003 OUTAGE EXAMINATIONS Component Description Categorv System Isometric Exam LOWER INTERMEDIATE SHELL VERTICAL RPV-L-1 -338A WELD B-A RPV IS1-1-54-1 UT LOWER INTERMEDIATE SHELL VERTICAL RPV-L-1 -338B WELD B-A RPV 1SI-1-54-1 UT LOWER INTERMEDIATE SHELL VERTICAL RPV-L-1 -338C WELD B-A RPV ISI-1-54-1 UT RPV-L-1-339A UPPER SHELL VERTICAL WELD B-A RPV 1SI-1-54-1 UT RPV-L-1 -339B UPPER SHELL VERTICAL WELD B-A RPV 1SI-1-54-1 UT RPV-L-1 -339C UPPER SHELL VERTICAL WELD B-A RPV 1S1-1-54-1 UT RPV-N2D-NIR NOZZLE INNER RADIUS B-D RPV IS1-1-54-1 UT RPV-N2D-NV NOZZLE TO VESSEL B-D RPV IS1-1-54-1 UT RPV-N2E-NIR NOZZLE INNER RADIUS B-D RPV ISI-1-54-1 UT RPV-N2E-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-1 UT RPV-N2F-NIR NOZZLE INNER RADIUS B-D RPV ISI-1-54-1 UT RPV-N2F-NV NOZZLE TO VESSEL B-D RPV IS1-1-54-1 UT RPV-N2J-NIR NOZZLE INNER RADIUS B-D RPV ISI-I-54-1 UT RPV-N2J-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-1 UT RPV-N4A-NIR NOZZLE INNER RADIUS& BORE B-D RPV ISI-1-54-1 UT RPV-N4A-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-1 UT RPV-N4B-NIR NOZZLE INNER RADIUS& BORE B-D RPV IS1-1-54-1 UT RPV-N4B-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-1 UT RPV-N4C-NIR NOZZLE INNER RADIUS& BORE B-D RPV ISI-1-54-1 UT RPV-N4C-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-1 UT RPV-N4D-NIR NOZZLE INNER RADIUS& BORE B-D RPV ISI-1-54-1 UT RPV-N4D-NV NOZZLE TO VESSEL B-D RPV 1S1-1-54-1 UT RPV-N9B-NIR NOZZLE INNER RADIUS B-D RPV 1S1-1-54-1 UT RPV-N9B-NV NOZZLE TO VESSEL B-D RPV ISI-1-54-1 UT 2R-N2D-1 SAFE END TO NOZZLE B-F RPV ISI-1-2R-A UT Page 1 of 4

ATTACHMENT B Component Description Category System Isometric Exam 2R-N2E-1 SAFE END TO NOZZLE B-F RPV ISI-I-2R-A UT 2R-N2F-1 SAFE END TO NOZZLE B-F RPV ISI-1-2R-B UT 2R-N2J-1 SAFE END TO NOZZLE B-F RPV ISI-I-2R-B UT RPV-N9B-1 NOZZLE TO SAFE END B-F RPV ISI-1-54-4 UT 10-VB-1001 -33B VALVE BOLTING B-G-2 RHR ISI-1-10-1 VT-i 10-VB-1001 -68B VALVE BOLTING B-G-2 RHR ISI-1-10-1 VT-1 12-VB-1 201-80 VALVE BOLTING B-G-2 RWCU ISI-1-12-2 VT-1 13-VB-1 301-17 VALVE BOLTING B-G-2 RCIC ISI-1-13-1 VT-i 14-VB-1 400-6B VALVE BOLTING B-G-2 CS ISI-1-14-1 VT-i 14-VB-1 400-91B VALVE BOLTING B-G-2 CS ISI-1-14-1 VT-i 2-VB-202-5A VALVE BOLTING B-G-2 RECIRC ISI-1-2R-A VT-i 2-VB-63B VALVE BOLTING B-G-2 RECIRC ISI-1-2R-B VT-i 23-VB-2301 -5 VALVE BOLTING B-G-2 HPCI ISI-1-23-1 VT-i 23-VB-2301 -7 VALVE BOLTING B-G-2 HPCI ISI-1-23-1 VT-i 23-VB-2301 -8 VALVE BOLTING B-G-2 HPCI ISI-1-23-1 VT-i - 1 2R-FB-BP-1A FLANGE BOLTING B-G-2 RECIRC ISI-I-2R-B VT-i 2R-FB-BPA-1 FLANGE BOLTING B-G-2 RECIRC ISI-I-2R-A VT-1 2R-FB-N1 A-7BC-1 FLANGE BOLTING B-G-2 RECIRC ISI-I-2R-B VT-i RPV-FB-CRD CRD BOLTING B-G-2 RPV N/A VT-i 10-0-24 PIPE TO PIPE B-J RHR ISI-1-10-1 A UT 10-0-25 PIPE TO PIPE B-J RHR ISI-1-10-1 A UT 1OR-IA-3 PIPE TO ELBOW B-J RHR ISI-1-10-1 UT 1OR-IA-4 ELBOW TO PIPE B-J RHR ISI-1-10-1 UT 1OR-IA-6 PIPE TO VALVE B-J RHR ISI-1-10-1 UT 1OR-IA-7 VALVE TO PIPE B-J RHR ISI-1-10-1 UT 12-1-26 ELBOW TO PIPE B-J RWCU ISI-1-12-2 UT 12-1-27 PIPE TO ELBOW B-J RWCU ISI-1-12-2 UT 12-0-28R PIPE TO ELBOW B-J RWCU IS-I-i2-1 SH1 UT 13-1-16 VALVE TO PIPE B-J RCIC ISI-1-13-1 UT 14-A-17 PIPE TO PENETRATION B-J CS ISI-1-14-1 UT Page 2 of 4

ATTACHMENT B Component Description Category System Isometric Exam 14-A-18 PIPE TO PIPE B-J CS ISI-1-14-1 UT 14R-A-16 PENETRATION TO ELBOW B-J CS ISI-1-1 4-1 UT 14R-B-1 6 PENETRATION TO ELBOW B-J CS ISI-1-1 4-1 UT 2R-HA-1 HEADER TO BEND B-J RECIRC ISI-1-2R-A UT 2R-HA-4 HEADER TO BEND B-J RECIRC ISI-1-21R-A UT 6-N4C-2 PIPE TO PIPE B-J FW ISI-1-6-1 UT 6-N4D-2 PIPE TO PIPE B-J FW ISI-1-6-1 UT 6-N4B-5HL1 (4) SUPPORT LUG B-K-1 FW ISI-1-6-1 MT CLASS 1 HYDRO CLASS 1 HYDRO B-P VARIOUS VARIOUS VT-2 DC-10-Fl OR PIPE TO VALVE C-F-1 RHR ISI-1-10-4BSH1 UT DC-1 O-F9 PIPE TO VALVE C-F-1 RHR ISI-I--0-4ASH2 PT UT DC-1 4-Fl PIPE TO VALVE C-F-1 Cs ISI-1-14-1 -PT UT DE/DL-6-F68 REDUCER TO VALVE C-F-2 FW ISI-1-6-i A MT UT.-.

EE-l-F138 VALVE TO PIPE C-F-2 MS ISI-I-1 -1SH2 MT UTr ;

DB-14-VBW24A-1 VALVE BODY WELD C-G CS ISI-1-14-2A MT - --

DB-14-VBW24A-2 VALVE BODY WELD C-G CS ISI-1-14-2A MT 1-GE-X208A-HL INTEGRAL ATTACHMENT D-B MS ISI-1-I-1 SH1 VT-3 IWE-GVWD-01 GENERAL VISUAL WALKDOWN E-A CONT ISI-IWE-AUG-1 GV IWE-ANNDRN-080 ANNULUS DRAINS(2) AT 80 AZ. E-C CONT ISI-IWE-AUG-1 VT-2 IWE-ANNDRN-170 ANNULUS DRAINS(2) AT 170 AZ. E-C CONT ISI-IWE-AUG-1 VT-2 IWE-ANNDRN-260 ANNULUS DRAINS(2) AT 260 AZ. E-C CONT ISI-IWE-AUG-1 VT-2 IWE-ANNDRN-350 ANNULUS DRAINS(2) AT 350 AZ. E-C CONT ISI-IWE-AUG-1 VT-2 IWE-CB-GIBS135 CONTAINMENT BOLTING E-G CONT N/A VT-i IWE-CB-GIBS180 CONTAINMENT BOLTING E-G CONT N/A VT-i IWE-CB-X203D CONTAINMENT BOLTING E-G CONT N/A VT-i IWE-CB-X203E CONTAINMENT BOLTING E-G CONT N/A VT-i IWE-CB-X203F CONTAINMENT BOLTING E-G CONT N/A VT-1 IWE-LINERDRAINS LINER DRAINS E-C CONT ISI-IWE-AUG-2 VT-2 H-10-1-175 SPRING HANGER F-A RHR ISI-I-1 0-1 VT-3 Page 3 of 4

ATTACHMENT B Component Description Category System Isometric Exam H-2-1 -Hi0 SPRING HANGER F-A RECIRC ISI-I-2R-A VT-3 H-2-1 -H-16 SPRING HANGER F-A RECIRC ISI-1-2R-A VT-3 H-2-1 -SS5 SNUBBER F-A RECIRC ISI-I-2R-A VT-3 H-1 204 RIGID SUPPORT F-A-CL4 MS ISI-I-1-1 SH2 VT-3 H-1 205 RIGID SUPPORT F-A-CL4 MS ISI-1-1-1 SH2 VT-3 H-1 45 RIGID HANGER F-A-CL4 MS ISI-1-1 -1SH2 VT-3 H-6-1-59 RIGID HANGER F-A-CL4 FW ISI-1-6-1A VT-3 H-6-1 -67 RIGID HANGER F-A-CL4 FW ISI-1-6-1 A VT-3 Page 4 of 4

ATTACHMENT C Pilgrim Station RFO-14 in Vessel Inspection Scope (IVVI)

1. Visual Feedwater sparger examination to NUREG 0619, attachment welds examined to ASME Xl and BWRVIP-48.
2. Visual Examination of Core Spray piping welds to BWRVIP-18.
3. Visual Examination of access hole covers to SIL 462 Rev 1.
4. Visual Examination of jet pump welds to BWRVIP-41.

5 RS-3 Welds.

50% of DF-2, DF-3 or AD 3ab, AD-1, and AD-2 welds.

5. Visual Examination of eight (8) guide tubes in accordance with BWRVIP-47
6. Visual Examination of five (5) gusset welds to BWRVIP-38
7. Visual Examination of the steam dryer to SIL 644. Also, examination of the dryer tack welds.

Page 1 of 1