Third Ten-Year ISI Interval Relief Request, PRR-42, Examinations of Component Welds with Less than Essentially 100% Examination Coverage
ML071430188
Person / Time
Site: Pilgrim
Issue date: 05/16/2007
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, NRC/NRR/ADRO
References
2.07.051
Download: ML071430188 (2)


Text

- En tergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nudear Assessment May 16, 2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293, License No. DPR-35 REFERENCES LETTER NO.

Third Ten-Year ISI Interval Pilgrim Relief Request, PRR-42, Examinations of Component Welds with Less Than Essentially 100% Examination Coverage

1. Entergy Letter No. 2.06.054, Request for Approval of ASME Section XI, Third Ten-Year In-service Inspection Program, Pilgrim Relief Request, PRR-42, Examinations of Component Welds with Less Than Essentially 100% Examination Coverage, dated June 28, 2006 2.07.051

Dear Sir or Madam:

By Reference 1, Entergy submitted Pilgrim Third Ten-Year In-service Inspection Program Relief Request, PRR-42. In March 2007, NRC requested additional information (RAI) to complete their review of PRR-42.

Subsequently, NRC Staff and Pilgrim personnel held a conference call to discuss the NRC RAI. Due to the extensive resources needed to address the RAI it will take until September to respond to the RAI. Accordingly, Pilgrim withdraws the relief request and will resubmit it as PRR-42, Revision 1 by September 15, 2007 with the requested information.

There are no commitments contained in this letter.

If you have any questions on this transmittal, please contact Mr. Bryan Ford, Licensing Manager at 508-830-8403.

SJB/wgl

,4oq47

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station cc:

Mr. James S. Kim, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8C-2 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 Letter Number: 2.07.051 Page 2 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station