Issue date | Title | Topic | |
---|---|---|---|
ML20217K357 | 21 October 1999 | Discusses Use of SONGS as Generic Safety Issue 191 Ref Plant.Future Requests for Info & Addl Coordination Activities Be Handled Through D Evans of Organization.With Diskette | Coatings |
ML20217K854 | 21 October 1999 | Forwards Revised Pages to ERDS Data Point Library,Per Requirements of 10CFR50,App E,Section VI.3.a.Described Unit 2 & 3 Changes for 2/3R7813 Were Completed on 990924 | |
ML20217L949 | 21 October 1999 | Forwards SONGS Emergency Response Telephone Directory, for Oct-Dec 1999 | |
1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 | 19 October 1999 | Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 | |
ML20217L010 | 18 October 1999 | Provides Update of Waterford 3 Effort for Review of Ufsar. Info Listed Includes Background Mgt Expectations,Review Status & Results,Clarifications Re Review & Conclusions | |
ML20217L014 | 18 October 1999 | Submits Update to NRC Staff Re Circumstances & Plans for Submitting Certification Rept on Waterford 3 Plant Specific Simulator | |
2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs | 15 October 1999 | Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs | |
2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp | 14 October 1999 | Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp | |
ML20217G705 | 14 October 1999 | Forwards Comments on Four of NRC RO Examination Questions for Exam Administered During Week of 991004 | |
ML17313B099 | 14 October 1999 | Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing | |
ML20217E322 | 13 October 1999 | Forwards MORs for Sept 1999 for Songs,Units 2 & 3.No Challenges Were Noted to Psvs for Either Units 2 or 3 | |
ML20217E767 | 12 October 1999 | Forwards Rev 62 to NRC Approved Aug 1983, Physical Security Plan,Songs,Units 1,2 & 3, IAW 10CFR50.54(p).Changes,as Described in Encls 1 & 2,do Not Reduce Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 | |
ML17313B088 | 12 October 1999 | Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 | Hydrostatic VT-2 Through-Wall Leak |
05000382/LER-1999-014, Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal | 12 October 1999 | Forwards LER 99-014-00,providing Details of Reactor Shutdown Due to Loss of RCP Controlled bleed-off Flow.Attached Commitment Identification/Voluntary Enhancement Form Identifies All Commitments Contained in Submittal | |
ML20217D515 | 7 October 1999 | Forwards Application for Renewal of SRO License for C Fugate License SOP-43039-3,IAW 10CFR55.57.Without Encls | |
1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included | 4 October 1999 | Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included | |
1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria | 30 September 1999 | Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria | |
2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 | 29 September 1999 | Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 | |
ML17300B350 | 29 September 1999 | Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 | |
ML20216H854 | 29 September 1999 | Submits Encl Request for Relief from ASME Code,Section III Requirements in 10CFR50.55(a)(3) to Use Mechanical Nozzle Seal Assembly as Alternate ASME Code Replacement at SONGS, Units 2 & 3 for Period of Operation Beginning with Cycle 11 | |
ML20216H874 | 29 September 1999 | Provides Requested Written Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Lab Testing of Charcoal Adsorber Samples for Creacus & Pacu Satisfies Listed Requirements | |
ML20212H446 | 28 September 1999 | Forwards Suppl Info,As Discussed with NRC During 990812 Telcon,To Support Risk Informed Inservice Testing & GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs | Stroke time Probabilistic Risk Assessment Large early release frequency |
ML17300B355 | 28 September 1999 | Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl | Generic Fundamentals Examination |
1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 | 27 September 1999 | Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 | |
1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative | 26 September 1999 | Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative | Boric Acid VT-2 Liquid penetrant Through-Wall Leak Through Wall Leak |
2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 | 24 September 1999 | Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 | |
1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data | 24 September 1999 | Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data | |
ML17313B085 | 24 September 1999 | Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles | Boric Acid VT-2 |
ML20212G561 | 24 September 1999 | Informs NRC That SCE Remains Committed to Performing Eddy Current Examinations of 100% of Reactor Vessel Head Penetrations at Songs,Unit 3.Exams Will Not Be Performed During Cycle 11 RFO | |
05000361/LER-1999-005, Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments | 23 September 1999 | Forwards 30-day follow-up LER 99-005-00,describing Loss of Physical Train Separation in Control Room.Any Actions Listed Intended to Ensure Continued Compliance with Existing Commitments | |
05000382/LER-1999-013, Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form | 23 September 1999 | Forwards LER 99-013-00,providing Details of Exceeding TS Limits for RCS Cooldown Rates.All Commitments Contained in Submittal Are Identified on Encl Commitment Identification/ Voluntary Enhancement Form | |
2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR | 23 September 1999 | Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR | |
ML17313B078 | 20 September 1999 | Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included | |
1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments | 17 September 1999 | Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments | |
ML20212C247 | 16 September 1999 | Forwards Five Final Applications for RO Licenses for G Esquival,Jm Hearn,Md Lawson,Re Simpson & PI Wood.Written Exam & Operating Test to Be Administered,Is Requested. Encls Withheld | |
ML20212C239 | 16 September 1999 | Requests Cancellation of SRO Licenses for Bn Coble,License SOP-43835,due to Job Assignment Location & CA Rodgers, License SOP-43537-1,due to Resignation from Company, Effective 990901 | |
1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld | 15 September 1999 | Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld | |
ML20212A406 | 14 September 1999 | Forwards Revised Pages to ERDS Data Point Library.Described Unit 2 Changes for 2R7817 & 2R7828 Were Completed on 990818 & Unit 3 Change for 3R7828 Was Completed on 990903 | |
ML17300B333 | 14 September 1999 | Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 | |
ML20216E603 | 10 September 1999 | Provides Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Dtd 990820.Schedule Shown on Attachment 1, Operator Licensing Exam Data, Provides Util Best Estimate Through Cy 2003 | Generic Fundamentals Examination |
2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested | 9 September 1999 | Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested | |
ML17300B335 | 8 September 1999 | Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met | Enforcement Discretion |
ML20211P412 | 7 September 1999 | Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) | |
1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments | 7 September 1999 | Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments | |
ML17313B076 | 3 September 1999 | Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H | Enforcement Discretion Probabilistic Risk Assessment |
ML20211M839 | 3 September 1999 | Forwards Revised Epips,Including Rev 25 to EP-001-020,rev 24 to EP-001-030,rev 25 to EP-001-040,rev 30 to EP-002-100,rev 22 to EP-001-010,rev 27 to EP-002-010,rev 26 to EP-002-102 & Rev 16 to EP-002-190.Listed Proprietary Revs to Epips,Encl | |
ML20211L368 | 2 September 1999 | Forwards Five Preliminary Applications for Reactor Operator Licenses for Individuals Listed,Iaw 10CFR55.31.Encls Withheld | |
0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs | 1 September 1999 | Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs | |
05000382/LER-1999-011, Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form | 31 August 1999 | Forwards LER 99-011-00,providing Details of Reactor Shutdown Due to Loss of Controlled bleed-off Flow.All Commitments Contained in Submittal Identified on Attached Commitment Identification/Voluntary Enhancement Form | |
ML17313B073 | 31 August 1999 | Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 |