Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211A99812 July 1999Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure
ML20205F58824 July 1997Decommissioning Cost Estimate for Diablo Canyon Power Plant,Units 1 & 2Coatings
Feedwater Heater
Fuel cladding
Fire Watch
Scaffolding
ML20236Q26115 April 1996Rev 0 to DCP M-050284, Design Change Package for Installation of CCW Surge Tank Pressurization Sys for Unit 1Safe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Tornado Missile
Post Accident Monitoring
Probabilistic Risk Assessment
Met Tower
Tornado Generated Missile
Excess Flow Check Valve
Earthquake
Fire Protection Program
Scaffolding
Water hammer
ML20086T10031 December 1991Adequacy of Seismic Margins Assuming Increase in Amplitude of Diablo Canyon Seismic Long-Term Program Horizontal & Vertical Ground Motions Described in Sser 34Probabilistic Risk Assessment
Earthquake
ML20246E48930 June 1989Quarterly Sys Status Rept,2nd Quarter 1989,Sys 65 120V Instrument AC Sys,Sys 66 120V Security UPS Sys & Sys 67 125/250VDC Sys
ML20153B04131 March 1988Comments on ACRS Subcommittee on Diablo Canyon Meeting on 880223-24 in Burlingham,Ca Re Status of Long Term Seismic Program of PlantProbabilistic Risk Assessment
Earthquake
ML20155G05430 April 1984Preliminary Rept on Status of IGSCC in SG Tube U-BendsNondestructive Examination
Intergranular Stress Corrosion Cracking
Stress corrosion cracking
Eddy Current Testing
Fuel cladding
Backfit
Flow Induced Vibration
Thermal fatigue
ML20215H01229 February 1984Followup of Alleged Deficiencies in QA Program at Diablo Canyon Nuclear Plant
ML20210E77425 January 1984Bostron-Bergen/Meddco Metals Allegations Investigation Interim ReptLiquid penetrant
ML20072H34231 December 1983Unit 1,Independent Design Verification Program Final Rept, Fifth Text SubmittalSafe Shutdown
Boric Acid
Hydrostatic
Nondestructive Examination
FLEX
High Energy Line Break
Earthquake
Power Operated Valves
Liquid penetrant
Backfit
Overspeed trip
Water hammer
ML20082T9229 December 1983Semimonthly Rept 51:Diablo Canyon Verification Program
ML20082G70223 November 1983Semimonthly Status Rept 50,Diablo Canyon Verification Program
ML20080K41319 September 1983Rev 0 to Diablo Canyon Unit 1 Idvp Verification of Corrective Action,Turbine Bldg, Interim Technical Rept 56Safe Shutdown
Operating Basis Earthquake
Earthquake
ML20078B71116 September 1983Rev 0 to Idvp Verification of Diablo Canyon Unit 1 Activities - Rupture Restraints, Interim Technical Rept 65High Energy Line Break
Earthquake
ML20080T0051 September 1983Summary & Evaluation Rept of Rl Cloud & Assoc Rept, Diablo Canyon Unit 1 Idvp - Small Bore Piping Rept
ML20080T0031 September 1983Summary & Evaluation Rept of Rl Cloud & Assoc Rept, Diablo Canyon Unit 1 Idvp - Soil - Outdoor Water Storage Tanks
ML20080T0131 September 1983Summary & Evaluation Rept of Rl Cloud & Assoc Rept, Idvp Valves
ML20080T0091 September 1983Summary & Evaluation Rept of Rl Cloud & Assoc Rept, Diablo Canyon Unit 1 Idvp - HVAC ComponentsFinite Element Analysis
Earthquake
ML20080T0161 September 1983Summary & Evaluation Rept of Rl Cloud & Assoc Rept, Idvp - HVAC Duct & Supports Rept
ML20080S9981 September 1983Summary & Evaluation Rept of Rl Cloud & Assoc Rept Diablo Canyon Unit 1 Idvp - Soils - Intake Structure
ML20080S9891 September 1983Summary & Evaluation Rept of Rl Cloud & Assoc Rept, Diablo Canyon Unit 1 Idvp - Verification Program for PG&E Corrective Action
ML20080S9911 September 1983Summary & Evaluation Rept of Rf Reedy Rept, Development of Svc-Related Contractor List for Nonseismic Design Work Performed for Diablo Canyon Nuclear Power Plant,Unit 1 Prior to 780601,Phase II
ML20080S9941 September 1983Summary & Evaluation Rept of Rl Cloud & Assoc Rept, Diablo Canyon Unit 1 Idvp - Verification of Design Analysis Hosgri Spectra
ML20024D08325 July 1983Rev 2 to Verification of Instrument & Control Design of Control Room Ventilation & Pressurization Sys, Interim Technical Rept 28
ML16341B99525 July 1983Rev 2 to Verification of Pressure,Temp,Humidity & Submergence Environs Used for Safety-Related Equipment Spec Outside Containment for Auxiliary Feedwater Sys & Control Room Ventilation..., Interim Technical Rept 14
ML20077H9771 July 1983Rept on Investigation of Reactor Coolant Pipe Weld Thickness at Diablo CanyonNon-Destructive Examination
Nondestructive Examination
Liquid penetrant
ML20076M07715 June 1983Chronolgy of EventsSafe Shutdown
Safe Shutdown Earthquake
Earthquake
ML20065C20018 February 1983Independent Design Verification Program,Electrical Equipment Analysis, Interim Technical Rept 33,Rev 0Safe Shutdown
Earthquake
ML20070S39128 January 1983Verification Program, Semimonthly Rept 30 for 830111-24Boric Acid
Fire Barrier
Emergency Lighting
Earthquake
ML20028D95813 December 1982Verification of Fire Protection Provided for Auxiliary Feedwater Sys,Control Room Ventilation & Pressurization Sys, Safety-Related Portion of 4,160 Volt Electric Sys, Interim Technical Rept 18,Rev 0Safe Shutdown
Boric Acid
High Energy Line Break
Earthquake
Turbine Missile
Overspeed trip
ML20210P5757 December 1982Interim Technical Rept on Diablo Canyon Unit 1 Idvp:Interim Technical Rept 12,Rev 0,Piping,Interim Technical Rept 17, Rev 0,Piping-Addl SamplesBoric Acid
Earthquake
ML20210P48229 October 1982Rev 0 to Diablo Canyon Unit 1 Idvp Verification of Design Analysis Hosgri Spectra, Interim Technical Rept 10Earthquake
ML20023A93524 September 1982Independent Design Verification Program,Semimonthly Rept,IDVP-SM-Sept 1982Boric Acid
ML20210P26013 September 1982Interim Technical Rept on Diablo Canyon Unit 1 Idvp,Small Bore Piping,Interim Technical Rept 30,Rev 0
ML20069D94610 September 1982to Independent Design Verification Program Auxiliary Bldg, Interim Technical ReptSafe Shutdown
Safe Shutdown Earthquake
Earthquake
ML20063J72627 August 1982Semimonthly Rept 20,Diablo Canyon Verification Program, 820810-23Boric Acid
ML20210P19222 June 1982Interim Technical Rept on Diablo Canyon Unit 1 Idvp, Verification of Design Analysis Hosgri Spectra - Interim Technical Rept 10,Rev 0Safe Shutdown
Earthquake
ML20053D39628 May 1982Verification Program, Semimonthly Rept 14Boric Acid
ML20136B33615 April 1982Comments on Rf Reedy,Inc,Qa Audit Rept on Safety-Related Activities Performed by PG&E Prior to June 1978Backfit
ML19264C78227 February 1982Design Verification Program,Seismic Svc Related Contracts Prior to June 1978, Revision 1,Phase ISafe Shutdown
Boric Acid
Earthquake
ML16340C35926 February 1982Progress Rept of Seismic Svc-Related Contracts Prior to June 1978, Project 105-4,Progress Rept 8 for Work Period 820213-26Boric Acid
ML20136B2783 December 1981Design Verification Program Seismic Svc-Related Contracts Prior to June 1978Safe Shutdown
Earthquake
ML20204E91226 November 1981Draft Seismic Verification ProgramSafe Shutdown
Earthquake
ML16340C12125 November 1981Semimonthly Status Rept Diablo Canyon Seismic Review Program,811112-23.
ML20100M04712 November 1981Draft Preliminary Rept of Project 105-4, Seismic Reverification ProgramBoric Acid
Earthquake
ML20116B55031 October 1981Draft Preliminary Rept on Design Interface Review of Seismic Reverification ProgramSafe Shutdown Earthquake
Finite Element Analysis
Earthquake
ML20039G25331 August 1981Emergency Plan Evaluation Rept on Diablo Canyon Nuclear Power Plant,Pg&E Emergency Plan Dtd Aug 1981.
ML16340B99819 August 1981Evaluation Findings,Diablo Canyon Nuclear Power Plant Offsite Emergency Response Plans Exercise.Siren
ML20004B68522 May 1981Scaling Laws for Large Earthquakes - Consequences for Physical Models.Earthquake
ML16340B77222 May 1981Character of High Frequency Strong Ground Motion.Earthquake