Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20206H123 | 5 May 1999 | Illinois Power Co CPS Main CR Simulator Certification Rept | Packing leak Stroke time Probabilistic Risk Assessment Squib Scram Discharge Volume Fuel cladding |
ML20216B135 | 21 April 1998 | Rev 0 to Illinois Power Co Clinton Power Station SVC Design Rept | |
ML20199G460 | 20 October 1997 | Vols I,Ii & III, to CPS Integrated Sar | Hot Short Safe Shutdown Unanalyzed Condition Packing leak High Radiation Area Ultimate heat sink Stroke time Probabilistic Risk Assessment Coatings Fire impairment Anchor Darling Temporary Modification Squib Emergency Lighting Condition Adverse to Quality B.5.b Missed surveillance Foreign Material Exclusion Operability Determination Fire Protection Program Fire Watch Scaffolding Grace period Unidentified leakage |
ML20129F146 | 21 September 1996 | Revised Special Assessment:Confirmatory Action Ltr | Stroke time Power change |
ML20113F476 | 16 September 1996 | Special Assessment:Confirmatory Action Ltr | Stroke time Power change |
ML20098B836 | 30 September 1995 | CPS IPE for External Events Final Rept | Hot Short Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Fire Barrier Tornado Missile Safe Shutdown Earthquake Probabilistic Risk Assessment Emergency Lighting Seismically rugged Design basis earthquake Earthquake Biofouling Fire Protection Program Weak link Fatality Seismic Walkdown Report |
ML20092C659 | 8 August 1995 | Pyrolysis Gas Chromatography Analysis of 9 Thermo-Lag Fire Barrier Samples | Fire Barrier |
U-602425, SEs of Thermo-Lag Installations | 16 March 1995 | SEs of Thermo-Lag Installations | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Coatings Foreign Material Exclusion Fire Protection Program Fire Watch |
ML20094J005 | 10 November 1994 | Evaluation of Thermo-Lag in Fire Zone A-1a | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Coatings Foreign Material Exclusion Fire Protection Program Fire Watch |
ML20106B802 | 30 September 1992 | Ipe,Final Rept | |
U-601997, Rev 11 to Revised Inservice Testing Program for Cps | 18 June 1992 | Rev 11 to Revised Inservice Testing Program for Cps | |
ML20029C198 | 21 March 1991 | Simulator Certification Rept. | High winds Hydrostatic Squib Scram Discharge Volume Feedwater Controller Failure Rod Drop Event Exemption Request Fuel cladding Power change |
ML20116G537 | 31 October 1989 | Rev 2 to Implementation of RG 1.99 for CPS Unit 1 | Hydrostatic |
ML20244A826 | 31 March 1989 | Rept on Containment Purge Operational Data Gathering & Evaluation Program & Proposed Containment Purge Criteria | Fire Watch Unidentified leakage Unidentified leak |
ML20206G072 | 20 May 1988 | Rev 0, Nonsafety-Related Control Sys Failure Analysis, Final Rept | Unanalyzed Condition Reactor Vessel Water Level Feedwater Controller Failure Coast down |
ML20238B085 | 12 June 1987 | 870610 Seismic Event Rept | Earthquake |
ML20199G204 | 12 May 1986 | Rev 2 to Dynamic Qualification of Time Delay Relays | |
ML20155G633 | 30 April 1986 | Revised Post-Accident Sampling Sys Evaluation Rept | |
ML20215D023 | 31 March 1986 | Single Loop Operation Analysis | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Overtravel Fuel cladding |
ML20137U634 | 6 January 1986 | Vol 1 of Rev 13 to Environ Qualification of Limitorque Operators Models SMB-0,SMB-00,SMB-000,SMB-1,SMB-3,SMB-4 & Smb/Hbc | |
ML20138A562 | 3 December 1985 | Failure Analysis,F010 & F011 Valves,Clinton Project | Anchor Darling Overtravel Fuel cladding Liquid penetrant |
ML20141P118 | 13 November 1985 | Analysis to Evaluate Electrical Protection Assembly & Inverter Circuits | |
U-600288, Emergency Response Facilities Design Rept | 12 November 1985 | Emergency Response Facilities Design Rept | Health Physics Network Nuclear Accident Reporting System Earthquake |
ML20198B710 | 4 November 1985 | Preliminary Analysis of Clinton Power Station Hydrogen Control Sys | Reactor Vessel Water Level Safe Shutdown Earthquake Fuel cladding |
ML20133G882 | 14 October 1985 | Equipment Seismic Assessment Program for Safety-Related Mechanical & Electrical Equipment | Safe Shutdown Safe Shutdown Earthquake Finite Element Analysis Design basis earthquake Earthquake Flow Induced Vibration |
ML20138R932 | 9 October 1985 | Socioeconomic Impact Analysis of Electric Rate Increases in Rural West Central Illinois | Earthquake |
ML20133A735 | 30 September 1985 | High Energy Line Break/Moderate Energy Line Break, Supplementary Review for Illinois Power Co | Safe Shutdown Safe Shutdown Earthquake Internal Flooding Earthquake |
ML20135H716 | 20 September 1985 | Dcrdr Summary Rept. W/Six Oversize Drawings | Safe Shutdown Ultimate heat sink |
ML20138F980 | 6 September 1985 | Rev 00 to Dynamic Qualification of Time Delay Relays | |
ML20134F399 | 2 August 1985 | Rev a to Purge & Vent Valve Operability Qualification Analysis | Finite Element Analysis |
ML20134L887 | 3 July 1985 | Station Blackout Evaluation Rept | Safe Shutdown Slow transfer Emergency Lighting |
ML20125C403 | 10 May 1985 | Summary of Training & Experience of Operations Personnel | Power change |
ML20113D365 | 30 April 1985 | Update to Results of Quality Programs for Const of Clinton Power Station | Safe Shutdown Hydrostatic Coatings Nondestructive Examination New Project Manager |
ML20115F448 | 11 April 1985 | Spds:Nrc Preimplementation Audit Results/Cps Responses | Reactor Vessel Water Level Failure to Scram |
ML20205A827 | 31 March 1985 | Line-By-Line Evaluation/Response to NRC Staff Review of Clinton Power Station Detailed Control Room Design Review Program Plan | |
ML20107B226 | 28 February 1985 | Results of Quality Programs for Const of Clinton Power Station | Safe Shutdown Hydrostatic Coatings Nondestructive Examination New Project Manager Condition Adverse to Quality Liquid penetrant |
ML20140D869 | 11 December 1984 | Rev 1 to Compliance Rept - Reg Guide 1.97 (Rev 3) | Squib Fuel cladding Unidentified leakage |
ML20101E688 | 30 November 1984 | Reactor Pressure Vessel Water Level Measurement Sys Evaluation Rept | Reactor Vessel Water Level Hydrostatic Probabilistic Risk Assessment Fuel cladding |
ML20093G910 | 10 October 1984 | Reactor Pressure Vessel Water Level Measurement Sys Evaluation Rept,Interim Closure Rept | Reactor Vessel Water Level Hydrostatic Fuel cladding |
ML20093K633 | 1 October 1984 | Independent Design Review Progress Rept, June-Sept 1984 | |
ML20087E164 | 12 March 1984 | Updated Info for Antitrust Review of OL Application | |
ML20092N676 | 31 December 1983 | Const Project Evaluation,Clinton Power Station | |
ML20099L985 | 14 November 1983 | Ventilating Duct Flame Guard, Final Rept | Safe Shutdown Coatings |
ML20078P122 | 28 October 1983 | Human Factors Review of Safety Parameter Display Sys | |
ML20078P126 | 28 October 1983 | Safety Parameter Display Sys (SPDS) Verification & Validation Team Rept on Human Factors Review of Spds | |
ML20078P113 | 28 October 1983 | Safety Parameter Display Sys Parameter Set Validation Rept | Safe Shutdown Reactor Vessel Water Level Scram Discharge Volume Feedwater Controller Failure Fuel cladding Pressure Boundary Leakage Power change |
ML20076J268 | 16 June 1983 | Emergency Response Facilities Design Rept | Health Physics Network High winds Nuclear Accident Reporting System Earthquake |
ML20071D263 | 4 March 1983 | Hazard Analysis of Flammable Compressed Gas Shipments on Il Central Gulf Railroad Near Clinton Power Station, (SER Outstanding Issue 1) | Accidental discharge |
ML20071D281 | 4 March 1983 | Evaluation of Control Room Habitability During Postulated Release of Toxic Matls Shipped by Rail, (SER Outstanding Issue 1) | |
ML20072N074 | 18 January 1983 | Revised Self-Initiated Const Project Evaluation (Per INPO Guidelines) | Non-Destructive Examination Temporary Modification |