Issue date | Title | Topic | |
---|---|---|---|
ML20206T477 | 31 May 1999 | Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology | Boric Acid Shutdown Margin Loop seal Fuel cladding Coast down Affidavit Manual Operator Action |
ML20203J858 | 31 January 1998 | Rev 2 to Catawba Nuclear Station PRA Summary Rept, for Jan 1998.W/one Diskette | Safe Shutdown Boric Acid High winds Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Large early release frequency TORMIS Earthquake Fuel cladding Coast down Fatality |
ML20094N075 | 31 October 1995 | Validation of Crest, Interim Rept | Earthquake |
ML20094N064 | 31 July 1995 | Computer Program for Coupled Response Spectrum Analysis of Secondary Sys | |
ML20117M802 | 31 July 1995 | CNS Standby Nuclear SW Pond Analysis | |
ML20086F471 | 30 June 1995 | Interim Plugging Criteria 90 Day Rept | Non-Destructive Examination Nondestructive Examination Stress corrosion cracking Eddy Current Testing |
ML20098A451 | 30 April 1995 | Stations Replacement SG Topical Rept | |
ML20083N754 | 24 April 1995 | Rn Sys Corrosion in Stainless Steel Welds Metallurgical Analysis Rept | |
ML20117M791 | 28 February 1995 | Standby Nuclear SW Pond Physical Testing Conducted During Feb 1995 | Grab sample |
ML20077R710 | 20 December 1994 | CNS Units 1 & 2 10CFR50.59 Evaluation of FSAR Change Related Edsfi Deviation 50413,414/92-01-02 (IEEE 308-1974) | Safe Shutdown Emergency Lighting |
ML20077C577 | 3 November 1994 | 1 Cycle 7 Interim Plugging Criteria Assessment & Projected EOC-8 Slb Leakage | Stress corrosion cracking |
ML20072T444 | 31 August 1994 | Selected Licensee Commitments | Boric Acid Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20063E280 | 31 January 1994 | Duke Power Co Catawba Nuclear Station Special Rept RHR Pump Vibration | Loop seal Probabilistic Risk Assessment Operability Determination Scaffolding |
ML18010B084 | 5 May 1993 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Safe Shutdown Boric Acid Shutdown Margin Loop seal Stroke time Temporary Modification Stress corrosion cracking Liquid penetrant Overspeed trip |
ML18010A952 | 30 November 1992 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Nondestructive Examination Liquid penetrant |
ML20062G727 | 19 November 1990 | Eddy Current Exam Rept Catawba Unit 2 June 1990 Refueling Outage 3 | Stress corrosion cracking |
ML20043E810 | 28 February 1990 | Rev 0 to Catawba Unit 1 Cycle 5 Core Operating Limits Rept. | |
ML20043E770 | 28 February 1990 | Rev 0 to Catawba Unit 2 Cycle 3 Core Operating Limits Rept. | |
ML17347B462 | 31 December 1989 | App a to USI A-46 & Generic Ltr 87-02. | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Backfit |
ML20246D687 | 14 August 1989 | Rev 1 to Criticality Analysis of Byron & Braidwood Station High Density Fuel Racks | |
ML19327B401 | 31 July 1989 | Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel. | |
ML18008A031 | 31 July 1989 | NTH-TR-01 Decrease in Heat Removal by Secondary Sys. | Safe Shutdown Rod Drop Event |
ML20247H071 | 30 June 1989 | Description & Verification Summary of Computer Program, Gappipe | Earthquake |
ML20246D671 | 30 June 1989 | Criticality Analysis of Byron/Braidwood Fresh Fuel Racks | |
ML20247H079 | 22 June 1989 | App to Description & Verification Summary of Computer Program,Gappipe | |
ML20247N062 | 31 May 1989 | Production Training Dept,Braidwood,Malfunctions & Initial Conditions | |
ML20247L184 | 12 May 1989 | Leak-Before-Break Evaluation for Stainless Steel Piping, Byron & Braidwood Nuclear Power Stations Units 1 & 2 | Packing leak Safe Shutdown Earthquake Liquid penetrant Flow Induced Vibration |
ML20247K301 | 12 May 1989 | Leak-Before-Break Evaluation for Carbon Steel Piping | Safe Shutdown Earthquake Hydrostatic Finite Element Analysis Earthquake Flow Induced Vibration |
ML18094A355 | 30 April 1989 | Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles. | Safe Shutdown Earthquake |
ML20247F132 | 23 March 1989 | Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment | |
ML20005G421 | 28 February 1989 | Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation. | Hydrostatic |
ML17251A481 | 28 February 1989 | Ultrasonic Indication Sizing Technique Development. Related Info Encl | Hydrostatic |
ML20206C745 | 30 November 1988 | ATWS Mitigation Sys Specific Design for Byron/Braidwood Stations, Rev 5 | |
ML20205T750 | 4 November 1988 | Detection & Skin Dose Evaluation for Characteristic X-Ray in Activation Product Contamination | |
ML20206K310 | 31 October 1988 | Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Limerick Generating Station Unit 1 | |
ML20206K302 | 31 October 1988 | Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Peach Bottom Atomic Power Station Unit 3 | |
ML20154N608 | 30 September 1988 | Rev 1 to Identification of Unisolable Piping & Determination of Insp Locations | Nondestructive Examination |
ML20154K209 | 9 September 1988 | Rev 0 to Response to NRC Bulletin 88-005,Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co.... Proprietary Procedure 1404.1, Leeb Hardness Testing (Equotip).... Encl.Procedure Withheld | |
ML20245B418 | 17 August 1988 | Investigation Rept,Design & Operation of Sampling Sys for Analysis of High Purity Water | Grab sample |
ML17347A797 | 16 June 1988 | Seismic Hazard Data Prepared for Resolution of USI A-46. | Earthquake |
ML17347A798 | 16 June 1988 | Radiological Data Prepared for Resolution of USI A-46. | Safe Shutdown Earthquake Earthquake Backfit |
ML20150F294 | 31 May 1988 | Rev 4 to, ATWS Mitigation Sys Specific Design for Byron/ Braidwood Stations | |
ML20196L628 | 20 May 1988 | Rev 2 to ATWS Mitigation Sys Actuation Circuitry (Amsac) | Anticipated operational occurrence |
ML20196L642 | 6 May 1988 | ATWS Mitigation Sys Actuation Circuitry Response to Unit Transients | |
ML20151H958 | 30 April 1988 | CASMO-3G Validation | |
ML20151T468 | 31 January 1988 | Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness | |
ML20148G543 | 15 January 1988 | Nonproprietary Mods to Critical Flow Model in RELAP5YA | |
ML20155K139 | 30 December 1987 | Final Rept MSIV 3-Way Dual Solenoid Valve Failures | Half scram Grab sample Stroke time |
ML20235F088 | 17 December 1987 | Marked-up Draft Seismological Analysis of Bodega Head,Ca | |
ML20236Y094 | 21 October 1987 | Epri/Westinghouse Owners Group Analysis of DHR Risk at Point Beach, Final Rept | Safe Shutdown Boric Acid Mission time Probabilistic Risk Assessment Earthquake Backfit Failure to Scram |