05000247/FIN-2018003-04 | Indian Point | 30 September 2018 23:59:59 | Inadequate Procedure for Turbine Startup Caused a Reactor Trip | |
05000333/FIN-2018412-01 | FitzPatrick | 30 September 2018 23:59:59 | Security | |
05000410/FIN-2018003-01 | Nine Mile Point | 30 September 2018 23:59:59 | Failure to Ensure that Thermal Power is Less Than or Equal to the Licensed Power Limit | |
05000247/FIN-2018003-01 | Indian Point | 30 September 2018 23:59:59 | Inadequate Procedural Guidance for Spent Fuel Movement and Storage Requirements | |
05000247/FIN-2018003-02 | Indian Point | 30 September 2018 23:59:59 | Containment Fan Coolers 21 and 24 Motor Cooler Elbow Through-Wall Leaks Due to Excessive Service Water Flow Rates and Safety System Functional Failures of Containment | Through-Wall Leak |
05000247/FIN-2018003-03 | Indian Point | 30 September 2018 23:59:59 | Containment Fan Cooler 24 Through-Wall Service Water Leak Caused by Inadequate Application of Epoxy Coating Resulting in Corrosion and a Safety System Functional Failure of Containment | Through-Wall Leak |
05000410/FIN-2018003-02 | Nine Mile Point | 30 September 2018 23:59:59 | Minor Violation | Reactor Vessel Water Level |
05000333/FIN-2018411-02 | FitzPatrick | 30 June 2018 23:59:59 | Security | |
05000333/FIN-2018411-01 | FitzPatrick | 30 June 2018 23:59:59 | Security | |
05000244/FIN-2018403-01 | Ginna | 30 June 2018 23:59:59 | Security | |
05000333/FIN-2018002-01 | FitzPatrick | 30 June 2018 23:59:59 | Licensee-Identified Violation | |
05000286/FIN-2018002-01 | Indian Point | 30 June 2018 23:59:59 | Reactor Pressure Boundary Leakage Due to Weld Failure in Reactor Vessel Head Penetration #3 | Pressure Boundary Leakage |
05000244/FIN-2018002-01 | Ginna | 30 June 2018 23:59:59 | Incorrect Scaling Factors in Reactor Vessel Level Monitoring System Instrumentation Uncertainty Calculation | Temporary Modification Reasonable doubt of operability |
05000220/FIN-2018002-02 | Nine Mile Point | 30 June 2018 23:59:59 | Inadequate Procedure Causes Water Hammer Condition Resulting in Isolation and Inoperability of the 12 Train of the Emergency Condenser System | |
05000410/FIN-2018002-01 | Nine Mile Point | 30 June 2018 23:59:59 | Failure to Ensure Proper Control of the Standby Gas Treatment System Damper Valve, 2GTS*V2000B, Within Procedures, Materials, and Design Control Measures | |
05000244/FIN-2018011-02 | Ginna | 31 March 2018 23:59:59 | Failure to Procedurally Verify Fuel Transfer Cart Results in Fuel Interference Event | |
05000220/FIN-2018001-01 | Nine Mile Point | 31 March 2018 23:59:59 | Potential Failure to Submit an 8-Hour Event Notification for a Valid Actuation of HPC | Reactor Vessel Water Level |
05000247/FIN-2018001-01 | Indian Point | 31 March 2018 23:59:59 | Failure to Incorporate Adequate Test Controls for Quarterly Stroke Close Testing of the Steam Supply Valves to Turbine-Driven Auxiliary Feedwater Pump | |
05000286/FIN-2018001-02 | Indian Point | 31 March 2018 23:59:59 | Inadequate Procedure for Placing Chemical and Volume Control System Demineralizer In Service | |
05000410/FIN-2018001-02 | Nine Mile Point | 31 March 2018 23:59:59 | Potential Inadequate 50.59 Evaluation for TS 3.3.1.1 Bases Change | Test box |
05000244/FIN-2018011-01 | Ginna | 31 March 2018 23:59:59 | Potential Preconditioning of Turbine Driven Auxiliary Feedwater Surveillance Testing | |
05000286/FIN-2017007-01 | Indian Point | 31 December 2017 23:59:59 | Inadequate Alternative Post-Fire Safe Shutdown Procedure | Safe Shutdown Significance Determination Process Fire Protection Program Fire Watch |
05000247/FIN-2017010-01 | Indian Point | 31 December 2017 23:59:59 | Inadequate Diesel Fuel Oil Temperature Protection | FLEX Significance Determination Process Spent Fuel Pool Instrumentation |
05000333/FIN-2017004-01 | FitzPatrick | 31 December 2017 23:59:59 | Inadequate Design Control for Battery Sizing Calculation | Significance Determination Process Battery sizing |
05000333/FIN-2017004-02 | FitzPatrick | 31 December 2017 23:59:59 | Human Error Resulting in Unplanned HPCI Isolation | Significance Determination Process |
05000244/FIN-2017004-01 | Ginna | 31 December 2017 23:59:59 | Inadequate Component Monitoring Relating to Online Risk Management and Assessment | Significance Determination Process |
05000247/FIN-2017007-03 | Indian Point | 31 December 2017 23:59:59 | Licensee-Identified Violation | Hydrostatic |
05000220/FIN-2017004-05 | Nine Mile Point | 31 December 2017 23:59:59 | Licensee-Identified Violation | Significance Determination Process |
05000410/FIN-2017004-04 | Nine Mile Point | 31 December 2017 23:59:59 | Ineffective Correction Action Results in Failure of Instrument Air System | Significance Determination Process |
05000333/FIN-2017004-03 | FitzPatrick | 31 December 2017 23:59:59 | Licensee-Identified Violation | |
05000410/FIN-2017004-03 | Nine Mile Point | 31 December 2017 23:59:59 | Inadequate Operability Determination forImpairedInternal Flood Barrier | Internal Flooding Significance Determination Process |
05000220/FIN-2017004-02 | Nine Mile Point | 31 December 2017 23:59:59 | Inadequate Fill and VentProcedure for Control Room Chiller Results in Unplanned LCO Entry | |
05000220/FIN-2017004-01 | Nine Mile Point | 31 December 2017 23:59:59 | Main Control Room Annunciators 10 CFR 50.65(a)(2) Demonstration Not Met | |
05000247/FIN-2017007-02 | Indian Point | 31 December 2017 23:59:59 | Failure to Maintain B.5.b Mitigating Strategies | Significance Determination Process B.5.b Mitigating Strategies |
05000247/FIN-2017403-01 | Indian Point | 30 September 2017 23:59:59 | Security | |
05000333/FIN-2017003-01 | FitzPatrick | 30 September 2017 23:59:59 | Vent Line Socket Weld Failure | Enforcement Discretion Significance Determination Process Pressure Boundary Leakage Through-Wall Leak |
05000333/FIN-2017404-01 | FitzPatrick | 30 September 2017 23:59:59 | Security | |
05000247/FIN-2017003-01 | Indian Point | 30 September 2017 23:59:59 | Component Misalignments for Nuclear Instrumentation P6 Permissive and AFW Flow Transmitter FI-1201 Following Scheduled Maintenance | |
05000410/FIN-2017002-01 | Nine Mile Point | 30 June 2017 23:59:59 | Inadequate Extent of Condition Results inUnplanned Yellow Risk Condition | Probabilistic Risk Assessment Incremental Core Damage Probability Deficit |
05000286/FIN-2017002-01 | Indian Point | 30 June 2017 23:59:59 | Failure to Maintain Flow Channeling Gate Closed in Accordance with the Containment Procedure | |
05000333/FIN-2017002-01 | FitzPatrick | 30 June 2017 23:59:59 | A Control Room Ventilation Subsystems Inoperable Longer than Allowed by Technical Specifications | Significance Determination Process |
05000220/FIN-2017002-02 | Nine Mile Point | 30 June 2017 23:59:59 | Licensee-Identified Violation | Significance Determination Process |
05000286/FIN-2017001-02 | Indian Point | 31 March 2017 23:59:59 | Operation in Mode 1 with Pressurizer Code Safety Valves in an Inoperable Condition | |
05000286/FIN-2017001-01 | Indian Point | 31 March 2017 23:59:59 | Inadequate Standard Operation Procedure for the Backup Spent Fuel Pool Cooling System | Significance Determination Process |
05000247/FIN-2017001-03 | Indian Point | 31 March 2017 23:59:59 | Licensee-Identified Violation | Significance Determination Process |
05000220/FIN-2017001-02 | Nine Mile Point | 31 March 2017 23:59:59 | Failure to Identify and Correct a Non- Conforming Condition in Safety-Related UPSs | Safe Shutdown Significance Determination Process |
05000220/FIN-2017001-01 | Nine Mile Point | 31 March 2017 23:59:59 | Deficient Design Control of Outboard MSIV Pilot Valve Instrument Air Supply | Significance Determination Process Reasonable doubt of operability |
05000247/FIN-2017405-01 | Indian Point | 31 March 2017 23:59:59 | Security | |
05000244/FIN-2017001-01 | Ginna | 31 March 2017 23:59:59 | Licensee-Identified Violation | Missed surveillance Surveillance Frequency Control Program |
05000333/FIN-2016004-01 | FitzPatrick | 31 December 2016 23:59:59 | Failure to Ensure Proper Configuration Control of a PCIV During Planned Maintenance | Significance Determination Process Reasonable doubt of operability |