05000244/FIN-2018002-01
Jump to navigation
Jump to search
| Site: | Ginna |
|---|---|
| Report | IR 05000244/2018002 Section 4OA2 |
| Date counted | Jun 30, 2018 (2018Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | N Perry J Schussler H Anagnostopoulos J Furia K Kolaczyk J Lilliendahl L Dumont C Cahill |
| Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |