| Q | CCA | Title |
---|
05000286/FIN-2016009-01 | 2016Q4 | H.12 | 345 kV Insulator Failure Causes Reactor Trip |
05000247/FIN-2016404-01 | 2016Q4 | H.9 | Security |
05000286/FIN-2016004-01 | 2016Q4 | | Inadequate Preventive Maintenance Classification of Starting Air Relief Valve Led to Failure |
05000286/FIN-2016004-02 | 2016Q4 | H.12 | Inadequate Operability Evaluation of Leak in Service Water Pump Discharge Pipe |
05000286/FIN-2016004-03 | 2016Q4 | H.14 | Failure to Provide Indication of a Bypassed RPS Channel During Testing |
05000247/FIN-2016004-04 | 2016Q4 | H.2 | Failure to Follow RPS Logic Train B Actuation Logic Test |
05000247/FIN-2017405-01 | 2017Q1 | H.8 | Security |
05000286/FIN-2017001-01 | 2017Q1 | P.2 | Inadequate Standard Operation Procedure for the Backup Spent Fuel Pool Cooling System |
05000286/FIN-2017001-02 | 2017Q1 | P.2 | Operation in Mode 1 with Pressurizer Code Safety Valves in an Inoperable Condition |
05000286/FIN-2017002-01 | 2017Q2 | P.3 | Failure to Maintain Flow Channeling Gate Closed in Accordance with the Containment Procedure |
05000247/FIN-2017003-01 | 2017Q3 | H.5 P.6(a) | Component Misalignments for Nuclear Instrumentation P6 Permissive and AFW Flow Transmitter FI-1201 Following Scheduled Maintenance |
05000247/FIN-2017403-01 | 2017Q3 | H.6 | Security |