Semantic search
Jump to navigation
Jump to search
Site | Start date | Title | Topic | |
---|---|---|---|---|
05000298/FIN-2018003-01 | Cooper | 30 September 2018 23:59:59 | Failure to Provide Complete and Accurate Information in a License Amendment Request | |
05000298/FIN-2018003-03 | Cooper | 30 September 2018 23:59:59 | Failure to Provide Adequate Lubrication for Drywell Fan Coil Units | Power change |
05000298/FIN-2018003-02 | Cooper | 30 September 2018 23:59:59 | Failure to Perform Process Applicability Determination | |
05000298/FIN-2018011-02 | Cooper | 30 June 2018 23:59:59 | Failure to Ensure Adequate Design Control Measures are in Place Associated with RHR Service Water Booster Pump Room Cooling | |
05000298/FIN-2018002-01 | Cooper | 30 June 2018 23:59:59 | Failure to Maintain Alarm Procedure for Service Water Booster Pump Ventilation Manual Actions | |
05000298/FIN-2018011-04 | Cooper | 30 June 2018 23:59:59 | Incorrect Classification of Potential Safety-Related Components | |
05000298/FIN-2018011-01 | Cooper | 30 June 2018 23:59:59 | Failure to Correct Extent of Condition of Surge Suppression Varistor Failures | |
05000298/FIN-2018011-03 | Cooper | 30 June 2018 23:59:59 | Inadequate Design Basis Calculation for the EDG Rooms Temperature Distribution | |
05000298/FIN-2018002-02 | Cooper | 30 June 2018 23:59:59 | Failure to Maintain Adequate Work Instructions for Traversing In-Core Probe System Limit Switches | |
05000298/FIN-2018001-01 | Cooper | 31 March 2018 23:59:59 | Licensee-Identified Violation | Time of Discovery Significance Determination Process |
05000298/FIN-2018010-01 | Cooper | 31 March 2018 23:59:59 | Failure to Maintain Satellite Phones in Locations That Provide Reasonable Assurance They Will Remain Available Following All Beyond Design Basis External Events | |
05000298/FIN-2017012-01 | Cooper | 31 December 2017 23:59:59 | Inadequate Inspection Activities for Emergency Transformer Bus | Significance Determination Process |
05000298/FIN-2017012-02 | Cooper | 31 December 2017 23:59:59 | Inadequate Testing Activities for Emergency Transformer Bus | Significance Determination Process |
05000298/FIN-2017003-02 | Cooper | 30 September 2017 23:59:59 | Failure to Account for Instrument Uncertainty in Safety-Related Ventilation Surveillance Procedures | Past operability Significance Determination Process |
05000298/FIN-2017003-01 | Cooper | 30 September 2017 23:59:59 | Failure to Ensure Suitability of Materials for the Reactor Building Northeast Fan Coil Unit | Significance Determination Process |
05000298/FIN-2017011-01 | Cooper | 30 September 2017 23:59:59 | Emergency Transformer Bus Failure due to Inadequate Inspection and Testing Activities | Significance Determination Process |
05000298/FIN-2017003-03 | Cooper | 30 September 2017 23:59:59 | Loss of Control Room Ventilation Due to Inadequate Post-Maintenance Testing Activities | Significance Determination Process |
05000298/FIN-2017010-02 | Cooper | 30 June 2017 23:59:59 | Failure to Perform Timely Operability Determinations | |
05000298/FIN-2017010-03 | Cooper | 30 June 2017 23:59:59 | Programmatic Failure to Identify and Correct Adverse Trends | |
05000298/FIN-2017009-01 | Cooper | 30 June 2017 23:59:59 | Exceeding the Technical Specification A llowed Out of Service Time of the Division I RHR System | |
05000298/FIN-2017010-05 | Cooper | 30 June 2017 23:59:59 | Failure to adopt appropriate procedures in accordance with 10 CFR Part 21 | |
05000298/FIN-2017010-04 | Cooper | 30 June 2017 23:59:59 | Failure to Monitor No. 2 Diesel Generator under 50.65(a)(1) due to Inadequate Maintenance Rule Evaluation | Significance Determination Process Maintenance Rule Program |
05000298/FIN-2017002-01 | Cooper | 30 June 2017 23:59:59 | Failure to Assess Operability of Technical Specification System Functions during Surveillance Testing | |
05000298/FIN-2017002-02 | Cooper | 30 June 2017 23:59:59 | Loss of Control Room Ventilation Due to Ineffective Preventive Maintenance Strategy | |
05000298/FIN-2017002-03 | Cooper | 30 June 2017 23:59:59 | Loss of Control Room Ventilation Due to Improper Switch Manipulation | |
05000298/FIN-2017009-02 | Cooper | 30 June 2017 23:59:59 | Failure to Implement an Adequate Procedure for Equipment Control | Significance Determination Process |
05000298/FIN-2017010-01 | Cooper | 30 June 2017 23:59:59 | Failure to Assign Corrective Actions to Prevent Recurrence of High Pressure Coolant Injection Failure | Condition Adverse to Quality Significance Determination Process |
05000298/FIN-2017002-04 | Cooper | 30 June 2017 23:59:59 | Licensee-Identified Violation | High Radiation Area |
05000298/FIN-2017001-06 | Cooper | 31 March 2017 23:59:59 | Failure to Install Correct Mechanical Stop and Verify Proper Operation | Significance Determination Process |
05000298/FIN-2017001-02 | Cooper | 31 March 2017 23:59:59 | Failure to Identify a Condition Adverse to Quality Associated with the 250 Vdc Electrical System | Condition Adverse to Quality Significance Determination Process |
05000298/FIN-2017001-04 | Cooper | 31 March 2017 23:59:59 | Failure to Address Nonconforming Pipe Thinning in Accordance with the ASME Code | Time of Discovery Significance Determination Process |
05000298/FIN-2017001-01 | Cooper | 31 March 2017 23:59:59 | Failure to Maintain Alternate Shutdown Emergency Procedure | Significance Determination Process |
05000298/FIN-2017001-03 | Cooper | 31 March 2017 23:59:59 | Failure to Identify a Condition Adverse to Quality | Mission time Condition Adverse to Quality Significance Determination Process |
05000298/FIN-2017001-05 | Cooper | 31 March 2017 23:59:59 | Loss of Shutdown Cooling due to Relay Maintenance | |
05000298/FIN-2016004-01 | Cooper | 31 December 2016 23:59:59 | Failure to Maintain Reactor Vessel Assembly Procedure to Ensure Adequate Moisture Separator Shielding | Significance Determination Process Substantial potential for an overexposure |
05000285/FIN-2016004-04 | Fort Calhoun | 31 December 2016 23:59:59 | Licensee-Identified Violation | |
05000285/FIN-2016004-01 | Fort Calhoun | 31 December 2016 23:59:59 | Failure to Provide Training on Changes to Protective Action Recommendation Procedures | Significance Determination Process |
05000298/FIN-2016403-01 | Cooper | 31 December 2016 23:59:59 | Security | |
05000298/FIN-2016004-04 | Cooper | 31 December 2016 23:59:59 | Failure to Maintain Main Steam System Operating Procedure | Significance Determination Process |
05000285/FIN-2016004-02 | Fort Calhoun | 31 December 2016 23:59:59 | Licensee-Identified Violation | Unanalyzed Condition Large early release frequency |
05000285/FIN-2016004-03 | Fort Calhoun | 31 December 2016 23:59:59 | Licensee-Identified Violation | Tornado Missile |
05000298/FIN-2016004-02 | Cooper | 31 December 2016 23:59:59 | Failure of an Analysis to Demonstrate that Changes Did Not Reduce the Effectiveness of the Emergency Plan | Significance Determination Process |
05000298/FIN-2016004-03 | Cooper | 31 December 2016 23:59:59 | Failure to Maintain Service Water Pump Maintenance Procedure | Significance Determination Process Scaffolding |
05000298/FIN-2016008-01 | Cooper | 30 September 2016 23:59:59 | Possible Failure to Ensure that the Assumptions in the Engineering Analysis Remain Valid | Probabilistic Risk Assessment Fire Protection Program |
05000285/FIN-2016008-01 | Fort Calhoun | 30 September 2016 23:59:59 | Failure to Obtain Prior NRC Approval for a Change When Required | Fire Barrier Significance Determination Process Maintenance Rule Program |
05000285/FIN-2016002-02 | Fort Calhoun | 30 June 2016 23:59:59 | Failure to Develop Adequate Procedures for Post Modification Testing | Significance Determination Process |
05000285/FIN-2016405-03 | Fort Calhoun | 30 June 2016 23:59:59 | Licensee-Identified Violation | |
05000298/FIN-2016002-03 | Cooper | 30 June 2016 23:59:59 | Failure to Maintain Design Control for High Pressure Coolant Injection System Electrical Circuit | Significance Determination Process |
05000285/FIN-2016201-01 | Fort Calhoun | 30 June 2016 23:59:59 | Security | |
05000298/FIN-2016002-02 | Cooper | 30 June 2016 23:59:59 | Failure to Follow Work Instructions for Post-Maintenance Testing of Safety-Related Ventilation Systems | Significance Determination Process |