05000298/FIN-2018003-01Cooper30 September 2018 23:59:59Failure to Provide Complete and Accurate Information in a License Amendment Request
05000298/FIN-2018003-03Cooper30 September 2018 23:59:59Failure to Provide Adequate Lubrication for Drywell Fan Coil UnitsPower change
05000298/FIN-2018003-02Cooper30 September 2018 23:59:59Failure to Perform Process Applicability Determination
05000298/FIN-2018011-02Cooper30 June 2018 23:59:59Failure to Ensure Adequate Design Control Measures are in Place Associated with RHR Service Water Booster Pump Room Cooling
05000298/FIN-2018002-01Cooper30 June 2018 23:59:59Failure to Maintain Alarm Procedure for Service Water Booster Pump Ventilation Manual Actions
05000298/FIN-2018011-04Cooper30 June 2018 23:59:59Incorrect Classification of Potential Safety-Related Components
05000298/FIN-2018011-01Cooper30 June 2018 23:59:59Failure to Correct Extent of Condition of Surge Suppression Varistor Failures
05000298/FIN-2018011-03Cooper30 June 2018 23:59:59Inadequate Design Basis Calculation for the EDG Rooms Temperature Distribution
05000298/FIN-2018002-02Cooper30 June 2018 23:59:59Failure to Maintain Adequate Work Instructions for Traversing In-Core Probe System Limit Switches
05000298/FIN-2018001-01Cooper31 March 2018 23:59:59Licensee-Identified ViolationTime of Discovery
Significance Determination Process
05000298/FIN-2018010-01Cooper31 March 2018 23:59:59Failure to Maintain Satellite Phones in Locations That Provide Reasonable Assurance They Will Remain Available Following All Beyond Design Basis External Events
05000298/FIN-2017012-01Cooper31 December 2017 23:59:59Inadequate Inspection Activities for Emergency Transformer BusSignificance Determination Process
05000298/FIN-2017012-02Cooper31 December 2017 23:59:59Inadequate Testing Activities for Emergency Transformer BusSignificance Determination Process
05000298/FIN-2017003-02Cooper30 September 2017 23:59:59Failure to Account for Instrument Uncertainty in Safety-Related Ventilation Surveillance ProceduresPast operability
Significance Determination Process
05000298/FIN-2017003-01Cooper30 September 2017 23:59:59Failure to Ensure Suitability of Materials for the Reactor Building Northeast Fan Coil UnitSignificance Determination Process
05000298/FIN-2017011-01Cooper30 September 2017 23:59:59Emergency Transformer Bus Failure due to Inadequate Inspection and Testing ActivitiesSignificance Determination Process
05000298/FIN-2017003-03Cooper30 September 2017 23:59:59Loss of Control Room Ventilation Due to Inadequate Post-Maintenance Testing ActivitiesSignificance Determination Process
05000298/FIN-2017010-02Cooper30 June 2017 23:59:59Failure to Perform Timely Operability Determinations
05000298/FIN-2017010-03Cooper30 June 2017 23:59:59Programmatic Failure to Identify and Correct Adverse Trends
05000298/FIN-2017009-01Cooper30 June 2017 23:59:59Exceeding the Technical Specification A llowed Out of Service Time of the Division I RHR System
05000298/FIN-2017010-05Cooper30 June 2017 23:59:59Failure to adopt appropriate procedures in accordance with 10 CFR Part 21
05000298/FIN-2017010-04Cooper30 June 2017 23:59:59Failure to Monitor No. 2 Diesel Generator under 50.65(a)(1) due to Inadequate Maintenance Rule EvaluationSignificance Determination Process
Maintenance Rule Program
05000298/FIN-2017002-01Cooper30 June 2017 23:59:59Failure to Assess Operability of Technical Specification System Functions during Surveillance Testing
05000298/FIN-2017002-02Cooper30 June 2017 23:59:59Loss of Control Room Ventilation Due to Ineffective Preventive Maintenance Strategy
05000298/FIN-2017002-03Cooper30 June 2017 23:59:59Loss of Control Room Ventilation Due to Improper Switch Manipulation
05000298/FIN-2017009-02Cooper30 June 2017 23:59:59Failure to Implement an Adequate Procedure for Equipment ControlSignificance Determination Process
05000298/FIN-2017010-01Cooper30 June 2017 23:59:59Failure to Assign Corrective Actions to Prevent Recurrence of High Pressure Coolant Injection FailureCondition Adverse to Quality
Significance Determination Process
05000298/FIN-2017002-04Cooper30 June 2017 23:59:59Licensee-Identified ViolationHigh Radiation Area
05000298/FIN-2017001-06Cooper31 March 2017 23:59:59Failure to Install Correct Mechanical Stop and Verify Proper OperationSignificance Determination Process
05000298/FIN-2017001-02Cooper31 March 2017 23:59:59Failure to Identify a Condition Adverse to Quality Associated with the 250 Vdc Electrical SystemCondition Adverse to Quality
Significance Determination Process
05000298/FIN-2017001-04Cooper31 March 2017 23:59:59Failure to Address Nonconforming Pipe Thinning in Accordance with the ASME CodeTime of Discovery
Significance Determination Process
05000298/FIN-2017001-01Cooper31 March 2017 23:59:59Failure to Maintain Alternate Shutdown Emergency ProcedureSignificance Determination Process
05000298/FIN-2017001-03Cooper31 March 2017 23:59:59Failure to Identify a Condition Adverse to QualityMission time
Condition Adverse to Quality
Significance Determination Process
05000298/FIN-2017001-05Cooper31 March 2017 23:59:59Loss of Shutdown Cooling due to Relay Maintenance
05000298/FIN-2016004-01Cooper31 December 2016 23:59:59Failure to Maintain Reactor Vessel Assembly Procedure to Ensure Adequate Moisture Separator ShieldingSignificance Determination Process
Substantial potential for an overexposure
05000285/FIN-2016004-04Fort Calhoun31 December 2016 23:59:59Licensee-Identified Violation
05000285/FIN-2016004-01Fort Calhoun31 December 2016 23:59:59Failure to Provide Training on Changes to Protective Action Recommendation ProceduresSignificance Determination Process
05000298/FIN-2016403-01Cooper31 December 2016 23:59:59Security
05000298/FIN-2016004-04Cooper31 December 2016 23:59:59Failure to Maintain Main Steam System Operating ProcedureSignificance Determination Process
05000285/FIN-2016004-02Fort Calhoun31 December 2016 23:59:59Licensee-Identified ViolationUnanalyzed Condition
Large early release frequency
05000285/FIN-2016004-03Fort Calhoun31 December 2016 23:59:59Licensee-Identified ViolationTornado Missile
05000298/FIN-2016004-02Cooper31 December 2016 23:59:59Failure of an Analysis to Demonstrate that Changes Did Not Reduce the Effectiveness of the Emergency PlanSignificance Determination Process
05000298/FIN-2016004-03Cooper31 December 2016 23:59:59Failure to Maintain Service Water Pump Maintenance ProcedureSignificance Determination Process
Scaffolding
05000298/FIN-2016008-01Cooper30 September 2016 23:59:59Possible Failure to Ensure that the Assumptions in the Engineering Analysis Remain ValidProbabilistic Risk Assessment
Fire Protection Program
05000285/FIN-2016008-01Fort Calhoun30 September 2016 23:59:59Failure to Obtain Prior NRC Approval for a Change When RequiredFire Barrier
Significance Determination Process
Maintenance Rule Program
05000285/FIN-2016002-02Fort Calhoun30 June 2016 23:59:59Failure to Develop Adequate Procedures for Post Modification TestingSignificance Determination Process
05000285/FIN-2016405-03Fort Calhoun30 June 2016 23:59:59Licensee-Identified Violation
05000298/FIN-2016002-03Cooper30 June 2016 23:59:59Failure to Maintain Design Control for High Pressure Coolant Injection System Electrical CircuitSignificance Determination Process
05000285/FIN-2016201-01Fort Calhoun30 June 2016 23:59:59Security
05000298/FIN-2016002-02Cooper30 June 2016 23:59:59Failure to Follow Work Instructions for Post-Maintenance Testing of Safety-Related Ventilation SystemsSignificance Determination Process