| Q | CCA | Title |
---|
05000298/FIN-2016001-02 | 2016Q1 | H.5 | Failure to Assess Operability of Technical Specification System Functions during Surveillance Testing |
05000298/FIN-2016001-01 | 2016Q1 | P.2 | Failure to Follow ASME Code Requirements when taking Corrective Actions for a Pump in the Required Action Range |
05000298/FIN-2016002-01 | 2016Q2 | H.14 | Failure to Meet Technical Specification Requirements for Traversing In-Core Probe B Ball Valve ( |
05000298/FIN-2016002-02 | 2016Q2 | H.5 | Failure to Follow Work Instructions for Post-Maintenance Testing of Safety-Related Ventilation Systems |
05000298/FIN-2016002-03 | 2016Q2 | | Failure to Maintain Design Control for High Pressure Coolant Injection System Electrical Circuit |
05000298/FIN-2016008-01 | 2016Q3 | | Possible Failure to Ensure that the Assumptions in the Engineering Analysis Remain Valid |
05000298/FIN-2016403-01 | 2016Q4 | H.13 | Security |
05000298/FIN-2016004-01 | 2016Q4 | H.12 | Failure to Maintain Reactor Vessel Assembly Procedure to Ensure Adequate Moisture Separator Shielding |
05000298/FIN-2016004-03 | 2016Q4 | H.1 | Failure to Maintain Service Water Pump Maintenance Procedure |
05000298/FIN-2016004-04 | 2016Q4 | | Failure to Maintain Main Steam System Operating Procedure |
05000298/FIN-2016004-02 | 2016Q4 | H.3 | Failure of an Analysis to Demonstrate that Changes Did Not Reduce the Effectiveness of the Emergency Plan |