05000298/FIN-2017010-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Perform Timely Operability Determinations |
Description | Green. The team identified a Green non-cited violation of Technical Specification 5.4.1.a, for the licensees multiple failures to immediately evaluate operability of degraded or nonconforming conditions. The team identified multiple examples of these operability determinations not being performed within one shift, as required by procedure. Further, aggregate data indicated routine noncompliance with procedural requirements to document operability immediately and without delay. The licensee entered this violation into its corrective action program as Condition Report CR-CNS-2017-03937, and began evaluating actions to restore compliance. Multiple failures to perform immediate operability determinations timely as required by station procedures is a performance deficiency. This performance deficiency is more than minor because it was associated with the equipment performance attribute of the mitigating systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of system s that respond to initiating events to prevent undesirable consequences. Using Inspection Manual Chapter 0609, Appendix A, dated June 19, 2012, the inspectors determined that the finding had very low safety significance (Green) because it did not result in the loss of operability or functionality of any system or train. This finding has a consistent process cross-cutting aspect in the human performance cross-cutting area because operators failed to use a consistent, systematic approach to make decisions regarding operability using the organizations well-defined decision making process (H.13) |
Site: | Cooper |
---|---|
Report | IR 05000298/2017010 Section 4OA2 |
Date counted | Jun 30, 2017 (2017Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | E Ruesch H Freeman G Pick P Voss C Young |
Violation of: | Technical Specification - Procedures |
CCA | H.13, Consistent Process |
INPO aspect | DM.1 |
' | |
Finding - Cooper - IR 05000298/2017010 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Cooper) @ 2017Q2
Self-Identified List (Cooper)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||