05000298/FIN-2018011-04
Jump to navigation
Jump to search
| Site: | Cooper |
|---|---|
| Report | IR 05000298/2018011 Section 1R21 |
| Date counted | Jun 30, 2018 (2018Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21M |
| Inspectors (proximate) | G George W Cullum R Deese S Hedger M Riley J Leivo M Yeminy T Farnholtz |
| Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
| INPO aspect | |
| ' | |