 QuarterSiteTitleTopic
05000341/FIN-2018003-032018Q3FermiFailure to Identify a Condition Adverse to Quality on Division 2 Residual Heat Removal Service Water Outlet Flow Control ValveCondition Adverse to Quality
05000341/FIN-2018002-042018Q2FermiFailure to Identify a Condition Adverse to Quality on Division 2 Residual Heat Removal Service Water Outlet Flow Control ValveCondition Adverse to Quality
05000316/FIN-2018002-012018Q2CookSteam Dump Closure Caused by Human Error
05000346/FIN-2017004-032017Q4Davis BesseFailure to Prescribe Appropriate Work Instructions for an Activity Affecting QualitySignificance Determination Process
05000461/FIN-2017009-012017Q3ClintonFailure to Evaluate Replacement Relay Dropout VoltageSignificance Determination Process
05000456/FIN-2017003-012017Q3BraidwoodFailure to Implement Adequate Radiological Controls for Treated Liquid Radioactive Effluents Containing TritiumSignificance Determination Process
05000346/FIN-2017008-012017Q2Davis BesseFailure to Maintain Adequate Room Temperature in the Emergency Feedwater FacilityFLEX
05000461/FIN-2017002-052017Q2ClintonFailure to Properly Classify a Shipment per DOT Regulations
05000454/FIN-2017002-012017Q2ByronFailure to Verify Computer Software during a Transformer Replacement ModificationSignificance Determination Process
Power change
05000237/FIN-2016004-012016Q4DresdenFailure to Comply With Radiation Work Permit Requirements Resulting In Unplanned Dose Rate AlarmsSignificance Determination Process
Substantial potential for overexposure
05000282/FIN-2016004-032016Q4Prairie IslandFailure to Adequately Calibrate an ElectrometerSignificance Determination Process
05000315/FIN-2016003-012016Q3CookImproper Backfill Severs Fire MainFire Protection Program
05000454/FIN-2016002-022016Q2ByronFailure to Comply With Radiation Work Permit Requirements Resulting In An Unplanned Dose Rate AlarmSignificance Determination Process
Substantial potential for overexposure
05000457/FIN-2016002-022016Q2BraidwoodFailure to Manage Gas Accumulation in the 2A SI Train
05000266/FIN-2016002-042016Q2Point BeachViolation of Technical Specifications During Mode 4 Entry with LCO 3.6.6 Not MetSignificance Determination Process
Fuel cladding
05000461/FIN-2016001-052016Q1ClintonFailure to Assess and Manage Risk Increase for a Proposed Maintenance ActivitySignificance Determination Process
05000440/FIN-2016008-032016Q1PerryHardcard Development Failed to Follow Procedure Change Process
05000461/FIN-2015004-022015Q4ClintonFailure to Perform Activities Affecting Quality in Accordance with Prescribed ProceduresSignificance Determination Process
05000461/FIN-2015004-032015Q4ClintonFailure to Follow Station Procedures for Plant ActivitiesSignificance Determination Process
05000282/FIN-2015003-022015Q3Prairie IslandImproper Operability DeterminationSignificance Determination Process
05000263/FIN-2015002-052015Q2MonticelloInadequate Clearance Order Results in Unplanned OPDRVSignificance Determination Process
Scram Discharge Volume
05000315/FIN-2015001-012015Q1CookInadequate Acceptance Criteria for Containment Spray Heat Exchanger InspectionsFuel cladding
05000315/FIN-2014005-012014Q4CookFailure to Identify Conditions Adverse to Quality associated with the Unit 1 TDAFW Pump Turbine Oil SystemPast operability
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
05000331/FIN-2014005-062014Q4Duane ArnoldFailure to Determine Dose Rates Prior to Entry into a High Radiation AreaHigh Radiation Area
Substantial potential for an overexposure
05000263/FIN-2014405-012014Q3MonticelloSecurity
05000440/FIN-2014004-012014Q3PerryRadioactive Material Found Off-Site at a Scrap Metal Vendor Facility
05000346/FIN-2013005-012013Q4Davis BesseOperator Failure to Follow Procedure Results in Service Water System TransientSignificance Determination Process
05000456/FIN-2013005-022013Q4BraidwoodFailure to Follow Procedure and Technical Specification Associated with Control for High and Locked High Radiation AreasHigh Radiation Area
Locked High Radiation Area
05000454/FIN-2013007-022013Q3ByronFailure to Properly Assess Operability of the 2A EDG Following Post-Modification TestingSignificance Determination Process
Maintenance Rule Program
05000266/FIN-2013002-062013Q1Point BeachSAFETY-RELATED Bus 2B-04 Supply Breaker Installed with Incorrect Setpoint
05000440/FIN-2012003-032012Q2PerryInadequate Lift Plan Causes Lifting Rig Failure
05000454/FIN-2012003-022012Q2ByronFailure to Have Instructions Appropriate to the Circumstances
05000263/FIN-2011004-022011Q3MonticelloFailure to Follow Emergency Diesel Generator Quarterly Surveillance Procedure
05000456/FIN-2011003-092011Q2BraidwoodIncorrect Equipment Used During an Auxiliary Feedwater Suction Piping Flush Surveillance
05000461/FIN-2011002-012011Q1ClintonFailure to Control Transient Combustible Materials in Accordance with Fire Protection ProgramSafe Shutdown
Significance Determination Process
Fire Protection Program
05000237/FIN-2011002-072011Q1DresdenDresden 3B Circulating Water Pump Bearing Failure Due to Low Oil Level
05000305/FIN-2011002-012011Q1KewauneeMisapplication of Code Acceptance Criteria for Weld FlawsNon-Destructive Examination
Significance Determination Process
Through-Wall Leak
05000373/FIN-2011002-012011Q1LaSalleFailure to Post Protected Pathway Signs for a Red Risk Path SystemSignificance Determination Process
05000456/FIN-2010004-032010Q3BraidwoodUnplanned Cooling Water Flow Reduction during Essential Service Water IST SurveillanceSignificance Determination Process
05000282/FIN-2010003-022010Q2Prairie IslandLack of Operator Procedure Use During System Alignment
05000266/FIN-2010003-032010Q2Point BeachFailure to Follow Procedures Needed to Maintain Equipment Operability with Hazard Barriers Out-Of-Service
05000346/FIN-2010002-022010Q1Davis BesseInadequate Post-Maintenance Testing of ECCS Room Cooler
05000282/FIN-2010002-042010Q1Prairie IslandFailure to Accomplish Analog Protection Functional Test Per Procedure Instructions
05000237/FIN-2009005-012009Q4DresdenOperating Personnel Incorrectly Placed Clearance TagsSignificance Determination Process
05000305/FIN-2009005-012009Q4KewauneeFailure to Perform Dye Penetrant Examinations of the Full Code Required Exam Surfaces
05000305/FIN-2009005-072009Q4KewauneeProcedure Inadequacy Results in the Tertiary Auxiliary Transformer Breaker Reopening After Alignment to the Bus
05000440/FIN-2009005-022009Q4PerryUnposted High Radiation Area at the TIP MachinesHigh Radiation Area
05000440/FIN-2009005-012009Q4PerryFailure to Adhere to Maintenance Instructions Resulted in Loss of Recirculation Pump \'A\'
05000237/FIN-2009005-052009Q4DresdenFailure to Follow the Master Refueling Procedure During Movement of Fuel Assembly JLU569Shutdown Margin
Probabilistic Risk Assessment
Significance Determination Process
Fuel cladding
05000331/FIN-2009005-022009Q4Duane ArnoldFailure to Follow Surveillance Test Procedure Results in Automatic Reactor Scram