ML22131A108 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2.3, Figures | |
ML22131A126 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix a - C | Safe Shutdown |
ML22245A002 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2.4, Figures Redacted | |
ML22131A101 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix a, Onsite Meteorological Data Summaries, November 1971-March 1973 | |
ML22131A111 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix J - K | |
ML22131A123 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix B, Onsite Meteorological Data Summaries, April 1979-March 1980 | |
ML22131A122 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance | Safe Shutdown Boric Acid Offsite Dose Calculation Manual Condition Adverse to Quality |
ML22131A102 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix G - I | Hydrostatic |
ML22131A109 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix C, Geologic Investigations of the Scotland Road Fault (Clinton- Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations | |
ML22131A106 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Safe Shutdown Boric Acid Shutdown Margin Non-Destructive Examination Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination VT-2 Power-Operated Valves Liquid penetrant Power change Flow Induced Vibration |
ML22245A100 | 5 May 2022 | 9 to Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a - Redacted | Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Coatings Emergency Lighting FLEX Earthquake Fire Protection Program Fire Watch Early Warning Fire Detection Scaffolding |
ML22131A107 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | Boric Acid Shutdown Margin High Radiation Area Hydrostatic Emergency Lighting |
ML22131A095 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Tornado Missile Commercial Grade Dedication Safe Shutdown Earthquake Hydrostatic Enforcement Discretion Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Incorporated by reference Tornado-Generated Missile Tornado Missile Protection Spent Fuel Pool Instrumentation Earthquake Control of Heavy Loads Fuel cladding Biofouling Through-Wall Leakage Accidental discharge Fire Protection Program |
ML22131A092 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Boric Acid Shutdown Margin Loop seal Stroke time Anticipated operational occurrence Earthquake Fuel cladding Power change Coast down Power Uprate Stretch Power Uprate |
ML22131A121 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix D, Geologic Bedrock Logs of Boring in the Site Area | Coatings |
ML22131A103 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix E, Historical Earthquakes in the Site Vicinity | Earthquake |
ML22131A135 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7 | Safe Shutdown Aging Management |
ML22131A120 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor | Boric Acid Shutdown Margin Reactor Vessel Water Level Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Fuel cladding Power change Flow Induced Vibration |
ML22245A053 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.1, Figures - Redacted | Safe Shutdown Earthquake |
ML22131A094 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs | Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Weld Overlay Coatings Operating Basis Earthquake Aging Management Foreign Material Exclusion Moisture barrier License Renewal Maintenance Rule Program Fire Protection Program Flow Induced Vibration Power Uprate |
ML22131A124 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix D - F | Finite Element Analysis Earthquake |
ML22131A091 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Stroke time Anticipated operational occurrence Commercial Grade Dedication Surveillance Frequency Control Program Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Power change Coast down |
ML22131A130 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Part 2 and Appendix H | |
ML22131A088 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix L - R | Safe Shutdown Coatings |
ML22131A093 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, List of Effective Pages and Introduction and General Description of Plant | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Emergency Lighting Incorporated by reference Tornado Generated Missile Surveillance Frequency Control Program Earthquake Turbine Missile Pressure Boundary Leakage Fire Protection Program Siren |
ML22245A042 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - Redacted | High winds Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Earthquake |
ML22131A131 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 | |
ML22131A098 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix F, Geotechnical Report - Reactor Borings, July 1974 | |
ML22131A099 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Boric Acid High Radiation Area Grab sample Anticipated operational occurrence Scaffolding |
ML22131A116 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Safe Shutdown Boric Acid Fitness for Duty Nondestructive Examination Emergency Lighting License Renewal Fire Protection Program |
ML22131A089 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix I, Report of Analysis of High Energy Line Breaks Outside Containment | |
ML22131A129 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | Safe Shutdown Boric Acid Shutdown Margin Packing leak Ultimate heat sink Stroke time Tornado Missile Safe Shutdown Earthquake Weld Overlay Hydrostatic Coatings Nondestructive Examination Emergency Lighting Tornado-Generated Missile Design basis earthquake Fuel cladding Liquid penetrant Scaffolding GOTHIC Exclusive Use |
ML22245A059 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 2_Redacted | |
ML22245A061 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted | Safe Shutdown Boric Acid Fire Barrier Anticipated operational occurrence Tornado Missile Post Accident Monitoring Surveillance Frequency Control Program Battery sizing Turbine Missile Offsite Circuit Coast down Power Uprate |
ML22131A117 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis FLEX Tornado-Generated Missile Aging Management Tornado Generated Missile Earthquake Maintenance Rule Program Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Through-Wall Leakage Power change GOTHIC |
ML22131A100 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Container Liner Anchor Load Tests, Part 1 | |
ML22131A097 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 | Turbine Missile |
ML22131A090 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 | |
ML22131A096 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Boric Acid Ultimate heat sink Grab sample Offsite Dose Calculation Manual Stroke time Hydrostatic Nondestructive Examination Turbine Missile |
SBK-L-22042, 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted | Safe Shutdown Earthquake |
ML22131A125 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Safe Shutdown Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program Fuel cladding |
ML21089A073 | 30 March 2021 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.2, Figures Redacted | |
ML20323A159 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A Through Appendix 3C | Safe Shutdown |
ML20323A152 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis FLEX Tornado-Generated Missile Aging Management Tornado Generated Missile Earthquake Maintenance Rule Program Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Through-Wall Leakage Power change GOTHIC |
ML20323A155 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3I | |
ML20323A151 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2J Through Appendix 2K | |
ML20323A158 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3D Through Appendix 3F | Finite Element Analysis Earthquake |
ML20323A157 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Part 1 | |
ML21089A366 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Figures, Redacted | |
ML21089A082 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Figures - Redacted | |