Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22131A1085 May 20221 to Updated Final Safety Analysis Report, Chapter 2.3, Figures
ML22131A1265 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Appendix a - CSafe Shutdown
ML22245A0025 May 20221 to Updated Final Safety Analysis Report, Chapter 2.4, Figures Redacted
ML22131A1015 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix a, Onsite Meteorological Data Summaries, November 1971-March 1973
ML22131A1115 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix J - K
ML22131A1235 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix B, Onsite Meteorological Data Summaries, April 1979-March 1980
ML22131A1225 May 20221 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality AssuranceSafe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Condition Adverse to Quality
ML22131A1025 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix G - IHydrostatic
ML22131A1095 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix C, Geologic Investigations of the Scotland Road Fault (Clinton- Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations
ML22131A1065 May 20221 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Non-Destructive Examination
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
VT-2
Power-Operated Valves
Liquid penetrant
Power change
Flow Induced Vibration
ML22245A1005 May 20229 to Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a - RedactedSafe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Post Accident Monitoring
Coatings
Emergency Lighting
FLEX
Earthquake
Fire Protection Program
Fire Watch
Early Warning Fire Detection
Scaffolding
ML22131A1075 May 20221 to Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramBoric Acid
Shutdown Margin
High Radiation Area
Hydrostatic
Emergency Lighting
ML22131A0955 May 20221 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Fire Barrier
Tornado Missile
Commercial Grade Dedication
Safe Shutdown Earthquake
Hydrostatic
Enforcement Discretion
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Tornado-Generated Missile
Tornado Missile Protection
Spent Fuel Pool Instrumentation
Earthquake
Control of Heavy Loads
Fuel cladding
Biofouling
Through-Wall Leakage
Accidental discharge
Fire Protection Program
ML22131A0925 May 20221 to Updated Final Safety Analysis Report, Chapter 15, Accident AnalysesBoric Acid
Shutdown Margin
Loop seal
Stroke time
Anticipated operational occurrence
Earthquake
Fuel cladding
Power change
Coast down
Power Uprate
Stretch Power Uprate
ML22131A1215 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix D, Geologic Bedrock Logs of Boring in the Site AreaCoatings
ML22131A1035 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix E, Historical Earthquakes in the Site VicinityEarthquake
ML22131A1355 May 20221 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7Safe Shutdown
Aging Management
ML22131A1205 May 20221 to Updated Final Safety Analysis Report, Chapter 4, ReactorBoric Acid
Shutdown Margin
Reactor Vessel Water Level
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Fuel cladding
Power change
Flow Induced Vibration
ML22245A0535 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.1, Figures - RedactedSafe Shutdown Earthquake
ML22131A0945 May 20221 to Updated Final Safety Analysis Report, Chapter 18, Aging Management ProgramsBoric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Weld Overlay
Coatings
Operating Basis Earthquake
Aging Management
Foreign Material Exclusion
Moisture barrier
License Renewal
Maintenance Rule Program
Fire Protection Program
Flow Induced Vibration
Power Uprate
ML22131A1245 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Appendix D - FFinite Element Analysis
Earthquake
ML22131A0915 May 20221 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Commercial Grade Dedication
Surveillance Frequency Control Program
Earthquake
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Power change
Coast down
ML22131A1305 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Part 2 and Appendix H
ML22131A0885 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix L - RSafe Shutdown
Coatings
ML22131A0935 May 20221 to Updated Final Safety Analysis Report, Chapter 1, List of Effective Pages and Introduction and General Description of PlantSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Tornado Generated Missile
Surveillance Frequency Control Program
Earthquake
Turbine Missile
Pressure Boundary Leakage
Fire Protection Program
Siren
ML22245A0425 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - RedactedHigh winds
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Earthquake
ML22131A1315 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3
ML22131A0985 May 20221 to Updated Final Safety Analysis Report, Chapter 2, Appendix F, Geotechnical Report - Reactor Borings, July 1974
ML22131A0995 May 20221 to Updated Final Safety Analysis Report, Chapter 12, Radiation ProtectionBoric Acid
High Radiation Area
Grab sample
Anticipated operational occurrence
Scaffolding
ML22131A1165 May 20221 to Updated Final Safety Analysis Report, Chapter 13, Conduct of OperationsSafe Shutdown
Boric Acid
Fitness for Duty
Nondestructive Examination
Emergency Lighting
License Renewal
Fire Protection Program
ML22131A0895 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Appendix I, Report of Analysis of High Energy Line Breaks Outside Containment
ML22131A1295 May 20221 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety FeaturesSafe Shutdown
Boric Acid
Shutdown Margin
Packing leak
Ultimate heat sink
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
Emergency Lighting
Tornado-Generated Missile
Design basis earthquake
Fuel cladding
Liquid penetrant
Scaffolding
GOTHIC
Exclusive Use
ML22245A0595 May 20221 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 2_Redacted
ML22245A0615 May 20221 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - RedactedSafe Shutdown
Boric Acid
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Post Accident Monitoring
Surveillance Frequency Control Program
Battery sizing
Turbine Missile
Offsite Circuit
Coast down
Power Uprate
ML22131A1175 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
FLEX
Tornado-Generated Missile
Aging Management
Tornado Generated Missile
Earthquake
Maintenance Rule Program
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leakage
Power change
GOTHIC
ML22131A1005 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Container Liner Anchor Load Tests, Part 1
ML22131A0975 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1Turbine Missile
ML22131A0905 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2
ML22131A0965 May 20221 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Boric Acid
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Hydrostatic
Nondestructive Examination
Turbine Missile
SBK-L-22042, 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted5 May 20221 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 RedactedSafe Shutdown Earthquake
ML22131A1255 May 20221 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste ManagementSafe Shutdown
Boric Acid
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Process Control Program
Fuel cladding
ML21089A07330 March 2021Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.2, Figures Redacted
ML20323A15922 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A Through Appendix 3CSafe Shutdown
ML20323A15222 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
FLEX
Tornado-Generated Missile
Aging Management
Tornado Generated Missile
Earthquake
Maintenance Rule Program
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leakage
Power change
GOTHIC
ML20323A15522 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3I
ML20323A15122 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2J Through Appendix 2K
ML20323A15822 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3D Through Appendix 3FFinite Element Analysis
Earthquake
ML20323A15722 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Part 1
ML21089A36622 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Figures, Redacted
ML21089A08222 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Figures - Redacted