ML22245A100
From kanterella
Jump to navigation
Jump to search
ML22245A100 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 05/05/2022 |
From: | NextEra Energy Seabrook |
To: | Office of Nuclear Reactor Regulation |
Poole J, NRR/DORL/LPLI, 415-2048 | |
Shared Package | |
ML22244A196 | List: |
References | |
SBK-L-22042 | |
Download: ML22245A100 (583) | |
Similar Documents at Seabrook | |
---|---|
Category:Fire Protection Plan
MONTHYEARML23317A1682023-11-0303 November 2023
[Table view]9 to Fire Protection Safe Shutdown Capability (EC 297539, Section 3.2 and EC 296106 Section 3.2 and Section 3.4), 10CFR50, Appendix R ML22245A1002022-05-0505 May 2022 9 to Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a - Redacted ML22131A1272022-05-0505 May 2022 8 to Fire Protection of Safe Shutdown Capability (Appendix R) ML20323A1702020-10-22022 October 2020 Rev. 17 to Fire Protection Safe Shutdown Capability ML17310A4732017-10-27027 October 2017 Seabrook Station Revision 15 to Appendix R, Fire Protection of Safe Shutdown Capability ML16147A2022016-04-29029 April 2016 Revision 17 to Updated Final Safety Analysis Report, Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R) ML14317A4812014-10-21021 October 2014 Updated Final Safety Analysis Report, Revision 16, Cover, Loep, and Chapter 1, Introduction and General Description of Plant ML14317A4912014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2E, Historical Earthquakes in the Site Vicinity ML14317A4952014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2C, Geologic Investigations of the Scotland Road Fault ML14317A4972014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2G, Static Dynamic Rock Properties ML14318A0242014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Fire Protection of Safe Shutdown Capability (10CFR50, Appendix R), Revision 13 ML14317A4962014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area ML14317A4942014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2B, Onsite Meteofological Data Summaries; April 1979 - March 1980 ML14317A4922014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Appendix 2F, Geotechnical Report - Reactor Borings ML14317A4792014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 2, Figures 2.3-1 Through 2.3-11 2023-11-03 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23317A1422023-11-0303 November 2023
[Table view]2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2G, Static Dynamic Rock Properties ML23317A1642023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Appendices 3D - 3F ML23317A1322023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML23317A1462023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23317A1352023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23317A1472023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23317A1412023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Onsite Meteorological Data Summaries November 1971 - March 1973 ML23317A1362023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23317A1482023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.3-1 Through 2.3-11 ML23317A1332023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, List of Effective Pages and Chapter 1, Introduction and General Description of Plant ML23317A1382023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2F, Geotechnical Report - Reactor Borings - July 1974 ML23317A1602023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area ML23317A1552023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23317A1652023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23317A1622023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Onsite Meteorological Data Summaries April 1979 - March 1980 ML23317A1662023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Appendices 3A - 3C ML23317A1592023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23317A1612023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance ML23317A1402023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Part 1 ML23317A1692023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23317A1342023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs L-2023-152, 2 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 32023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 ML23317A1392023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23317A1312023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23317A1432023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2E, Historical Earthquakes in the Site Vicinity ML23317A1372023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 ML23317A1502023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2J, Sample Descriptions for Borings Made in November-December 1972 ML23317A1702023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Appendix Appendix G, Part 2 and Appendix H ML23317A1562023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML23317A1492023-11-0303 November 2023 2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C, Geologic Investigations of the Scotland Road Fault (Clinton - Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations 2023-11-03 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML22245A100&oldid=3721771"