ML22245A002

From kanterella
Jump to navigation Jump to search
1 to Updated Final Safety Analysis Report, Chapter 2.4, Figures Redacted
ML22245A002
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/05/2022
From:
NextEra Energy Seabrook
To:
Office of Nuclear Reactor Regulation
Poole J, NRR/DORL/LPLI, 415-2048
References
SBK-L-22042
Download: ML22245A002 (33)


Text

Site Topography and Plot Plan SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Rev. 12 Figure 2.4-1

Topographic Map Depicting Major Hydrologic Features of Region SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-2

Time Incremental Distribution of Local PMP SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-3

Probable Maximum Precipitation for 200 Square Miles - 24 Hours (in Inches) - The All Season Envelope SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-4

Depth - Area - Duration Relationships SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-5

Hampton Harbor Drainage Basin SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-6

Hampton Harbor Drainage Basin - Detailed Topography

[2 Sheets]

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-7 Sh. 1 of 2

Hampton Harbor Drainage Basin - Detailed Topography

[2 Sheets]

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-7 Sh. 2 of 2

PMP Hydrographs SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-8

PMF Discharge Hydrograph SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-9

Hampton Harbor Surface Area vs. Elevation SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-10

Astronomical Tidal Cycle - Hampton Harbor - November 22, 1972 SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-11

Hampton Harbor PMF Hydrograph SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-12

PMH Path SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-13

Offshore Depth Profile - Transverse Line N75W (True)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-14

Estimated Probability of Extreme High Tide at Portland, Maine and Boston, Mass.

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-15

Open Coast Storm Surge Hydrographs - Seabrook Plant SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-16

SPF Discharge Hydrograph SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-17

Resultant PMH and SPF Stillwater Levels SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-18

Design Wave Heights, Periods and Waterlevels SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-19

Topographic Profiles SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-22

SPS - PMH Site Flooding SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-23

Typical Sections - Revetments A, B, & C SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-24

Wave Pressure Distributions against Seawall and Retaining Wall SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-25

Surficial Geology in the Seabrook Area SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-26

Geologic Profile of Seabrook Area SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-27

Water Table Contours SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-28

Groundwater Contours in Plant Site Area Prior to Construction SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-29

Site Vicinity Wells SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-30

Seabrook Area Wells SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-31

Water Level Variations in the Seabrook Area SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.4-32