ML22131A108

From kanterella
Jump to navigation Jump to search
1 to Updated Final Safety Analysis Report, Chapter 2.3, Figures
ML22131A108
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/05/2022
From:
NextEra Energy Seabrook
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22131A110 List:
References
SBK-L-22042
Download: ML22131A108 (12)


Text

SEABROOK STATION Seabrook Site - 50 Mile Radius Regional Climatological Data Stations UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-1

SEABROOK STATION Spring Wind Rose for the 30 ft. Level (March 1972 - May 1972)

UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-2

SEABROOK STATION Summer Wind Rose for the 30 ft. Level (June 1972 - August 1972)

UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-3

SEABROOK STATION Fall Wind Rose for the 30 ft. Level (November 1971 and September, October 1972)

UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-4

SEABROOK STATION Winter Wind Rose for the 30 ft. Level (December 1971 -

February 1972)

UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-5

SEABROOK STATION Annual Wind Rose for the 30 ft. Level (November 1971 -

October 1972)

UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-6

SEABROOK STATION Topographic Map within a Five Mile Radius of the Seabrook Site UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-7

SEABROOK STATION Terrain Cross Section [2 Sheets]

UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-8, Sh. 1 of 2

SEABROOK STATION Terrain Cross Section [2 Sheets]

UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-8, Sh. 2 of 2

SEABROOK STATION Topographic Map Showing the Location of the Meteorological Tower with Respect to the Reactor Area UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-9

SEABROOK STATION Meander as a Function of Wind Speed and Stability UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-10

SEABROOK STATION Plume and TIBL Interaction UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-11