Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18094A12228 March 2018Isfsis, Revision 45 to Emergency Plan Report Change
ML16014A0118 January 2016ISFSIs - Revision 43 to the Emergency PlanSafe Shutdown
Time of Discovery
Health Physics Network
Offsite Dose Calculation Manual
Enforcement Discretion
Operating Basis Earthquake
Incorporated by reference
Design basis earthquake
Earthquake
Deep Dose Equivalent
Minimum staff
Fire Protection Program
Grace period
Siren
ML12305A41615 October 2012Radiological Emergency Preparedness (REP) Program
ML04111091012 April 2004Virginia Electric and Power Company, North Anna Power Station Units 1 and 2, Revisions to Emergency Plan Implementing ProcedureHealth Physics Network
ML0407600928 March 2004Rev. 1 to EPIP - 4.35Health Physics Network
ML04057006318 February 2004Revision 15 to EPIP-4.08, Initial Offsite Release Assessment and Revision 15 to EPIP-4.09, Source Term Assessment.
ML04034054523 January 2004Revision 39 to EPIP-1.01, Emergency Manager Controlling Procedure.Health Physics Network
Earthquake
ML04028033321 January 2004Stations - Revision 8 to CPIP-6.2, Radiological Assessment Coordinator.Health Physics Network
ML0319604763 July 2003Revisions to Emergency Plan Implementing Procedures
ML03141048814 May 2003Revisions to Emergency Plan and Implementing Procedures
ML03111047710 April 2003Revisions to Emergency Plan and Implementing ProceduresHealth Physics Network
Grab sample
ML03085073120 March 2003Revisions to Emergency Plan & Implementing ProceduresHealth Physics Network
Minimum staff
ML0302305703 January 2003Units 1 and 2, Revisions to Corporate Plan Implementing ProceduresHealth Physics Network
Minimum staff
ML0301004313 January 2003Revisions to Emergency Plan & Implementing ProceduresHealth Physics Network
Earthquake
ML02336007420 November 2002Units 1 and 2, Revision to Corporate Plan Implementing Procedure
ML0225202793 September 2002Revisions to Emergency Plan Implementing ProceduresHealth Physics Network
Minimum staff
ML0220001352 July 2002Transmittal of Revised North Anna Power Station Emergency Plan Implementing Procedures EPIP-4.08 (Revision 14), EPIP-4.09 (Revision 13 EPIP-4.17 (Revision 15 & EPIP-4.18 (Revision 12)Health Physics Network
ML0217107626 June 2002Revision to Emergency Plan Implementing ProcedureUltimate heat sink
Earthquake
Pressure Boundary Leakage
ML02156044015 May 2002Revision 13, P1 to EPIP-4-08, Initial Offsite Release Assessment.Temporary Modification
ML02109057015 April 2002Revision to Emergency Plan Implementing ProcedureHealth Physics Network
Fuel cladding
Minimum staff
ML02106050710 April 2002Units 1 & 2 Revisions to Corporate Plan Implementing ProceduresHealth Physics Network
Fuel cladding
Minimum staff
ML02088066818 March 2002Revision to Emergency Plan Implementing Procedure EPIP-1.01, Revision 35, Emergency Manager Controlling Procedure.Health Physics Network
Ultimate heat sink
Earthquake
Pressure Boundary Leakage
ML0206500321 February 2002Revised Emergency Plan Implementing Procedure EPIP-4.24 (Revision 11)Health Physics Network
Grab sample
ML0037311936 July 2000North Anna and Surry Power Stations Units 1 and 2 - Revisions to Corporate Plan Implementing ProceduresHealth Physics Network
Fuel cladding